# Meta Temple SI Data Center, Temple, TX | $SIS

> Meta Temple is an SI data center in Temple, Texas, owned by Meta. Epoch AI puts its IT power at 178 MW (Sep 30, 2026). Map, timeline, sources and its watcher.

Source: https://siscto.si/power-map/meta-temple/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. Meta Temple

Power Map · Operating

# Meta Temple, Temple

Meta Temple is an SI data center in Temple, Texas, United States, owned by Meta and used by Meta. [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 178 MW as of September 30, 2026, with 3 buildings operating. Its public timeline starts on April 1, 2022.

IT power
:   178 MW (Sep 30, 2026)

Facility power
:   231 MW

Status
:   Operating

Buildings operating
:   3

Where it is

## The site and its facts

Meta Temple on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Temple, Texas, United States

Address
:   2310 Eberhardt Rd, Temple, TX 76504

Coordinates
:   31.1309° N, 97.3667° W

Owner
:   Meta

Users
:   Meta

Chips
:   B300

Compute
:   About 202,473 H100 equivalents (Epoch AI estimate, Sep 30, 2026)

Builders
:   JE Dunn

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +0.5 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/meta-temple/)

### Lights On

NASA's night imagery read 68.6 of 100 over this site in October 2026, against 43.5 in October 2018, the first month read. Against a year before: +0.9 points. The place was already bright at the first reading, so growth is harder to see. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=meta-temple#view)

## Dated, from the public record

Epoch AI's dated notes on Meta Temple, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Apr 1, 2022**

> Land clearing begins.

No IT power yet (0 operating)

**Feb 5, 2023**

> A traditional H-shaped Meta data center is partially built.

No IT power yet (0 operating)

**Apr 1, 2023**

> The traditional Meta data center has been demolished mid-construction, in favor of Meta's new AI-optimized design.

No IT power yet (0 operating)

**Nov 15, 2025**

> Building 1 and 2 look complete from outside, with all electrical and cooling equipment installed. Space is cleared for Building 3.

No IT power yet (0 operating)

**Dec 9, 2025**

> Building 1 and 2 are operational. Activity related to the air quality permit (namely, emergency diesel generators) was reported to have started as of 2025-12-09. This is our best estimate, but note that the planned completion date in this [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2022017728) is 2026-03-01.

152 MW (2 operating)

**Feb 24, 2026**

> Building 3 is under construction. An outline is visible for the building which has similar dimensions to those deployed at the Meta Prometheus site.

152 MW (2 operating)

**Sep 30, 2026**

> Building 3 is operational. Based on the stated completion date in this [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026008019)

178 MW (3 operating)

Adopt a site

## Watch Meta Temple

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [JE Dunn project page](https://jedunn.com/projects/meta-temple-data-center/)

- [TDLR filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2022017728)

- [TDLR filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026008019)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Meta Temple (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

37 km away

### OpenAI Stargate Milam

Burlington, Texas, United States

IT power not stated

149 km away

### Google Midlothian

Midlothian, Texas, United States

103 MW IT power

166 km away

### Google Red Oak

Red Oak, Texas, United States

77 MW IT power

223 km away

### Microsoft SAT14

San Antonio, Texas, United States

47 MW IT power

Questions

## Meta Temple, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Meta Temple?

Meta Temple is in Temple, Texas, United States, at 2310 Eberhardt Rd, Temple, TX 76504. Epoch AI publishes its coordinates as 31.1309, -97.3667.

### Who owns Meta Temple?

Epoch AI lists Meta as its owner and Meta as its user.

### How much power does Meta Temple use?

Epoch AI estimates its IT power at 178 MW as of September 30, 2026, and its total facility power at 231 MW.

### Is Meta Temple operating?

Yes. Epoch AI counts 3 buildings operating as of September 30, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).