# Microsoft Narvik Norway SI Data Center, Bjerkvik, Norway

> Microsoft Narvik Norway is an SI data center in Bjerkvik, Narvik, Norway, owned by Nscale. Epoch AI tracks it as under construction. Map, timeline and sources.

Source: https://siscto.si/power-map/microsoft-narvik-norway/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. Microsoft Narvik Norway

Power Map · Under construction

# Microsoft Narvik Norway, Bjerkvik

Microsoft Narvik Norway is an SI data center in Bjerkvik, Narvik, Norway, owned by Nscale (Epoch AI rates this likely) and used by Microsoft (Epoch AI rates this likely). [Epoch AI](https://epoch.ai/data/ai-data-centers) tracks it as under construction: no building is operating yet as of July 5, 2026, and projects 92 MW by December 31, 2026. Its public timeline starts on July 1, 2023.

IT power
:   Not stated (Epoch AI)

Facility power
:   Not stated

Status
:   Under construction

Buildings operating
:   0

Where it is

## The site and its facts

Microsoft Narvik Norway on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Bjerkvik, Narvik, Norway

Address
:   Not public

Coordinates
:   68.5763° N, 17.5963° E

Owner
:   Nscale (Epoch AI rates this likely)

Users
:   Microsoft (Epoch AI rates this likely)

Projected
:   92 MW IT power by December 31, 2026 (Epoch AI projection, not a fact yet)

Timeline

### The Gigawatt Ledger

Stargate Norway: 230 MW was announced for this project. Epoch AI tracks the site as under construction, with no building operating as of July 5, 2026.

[Open it in the Ledger](https://siscto.si/ledger/stargate-norway-narvik/)

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +1.5 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/microsoft-narvik-norway/)

### Lights On

NASA's night imagery read 9.9 of 100 over this site in October 2026, against 0.7 in October 2018, the first month read. Against a year before: +8.2 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=microsoft-narvik-norway#view)

## Dated, from the public record

Epoch AI's dated notes on Microsoft Narvik Norway, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Jul 1, 2023**

> Land clearing and site prep begins at least as early as July 2023.

No IT power yet (0 operating)

**Jun 27, 2025**

> Site prep continues for Buildings 1, 2, and 3.

No IT power yet (0 operating)

**Aug 1, 2025**

> Building 1 starts to go up.

No IT power yet (0 operating)

**May 31, 2026**

> Building 1 cooling looks complete. Backup generator install continues adjacent to B1. Building 2 cooling install continues. Ground prep for generators next to B2. Cooling install appears to continue on Building 3. Construction equipment present all around site. We believe no buildings are operational at this time.

No IT power yet (0 operating)

**Jul 5, 2026**

> Building 1 cooling looks complete. Backup generator install continues adjacent to B1. Building 2 cooling install continues. Backup generator concrete pads are there, but no equipment install visible. Cooling install appears to continue on Building 3. Construction equipment present all around site. We believe no buildings are operational at this time.

No IT power yet (0 operating)

**Dec 31, 2026 (Projection)**

> We believe Buildings 1 and 2 will be fully operational by the end of H2 2026

92 MW (2 operating)

Adopt a site

## Watch Microsoft Narvik Norway

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Nscale announcing more than 30.000 Rubin GPUs](https://www.nscale.com/press-releases/nscale-microsoft-norway)

- [NScale announcing 230 initial MW and possibly an additional 290MW, mentioning 100.000 Nvidia GPUs](https://www.nscale.com/blog/stargate-norway-laying-the-foundation-for-the-future-of-ai)

- [Local hydropower facilities will fulfill new demand at 4 to 5 cents per unit for electricity](https://time.com/article/2026/06/03/ai-norway-nscale-data-center/)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Microsoft Narvik Norway (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

901 km away

### EcoDataCenter 2

Borlänge, Dalarna County, Sweden

IT power not stated

955 km away

### Nebius Mantsala

Mantsala, Uusimaa, Finland

75 MW IT power

1,241 km away

### CoreWeave Norway

Øvrebø, Agder, Norway

42 MW IT power

1,831 km away

### Nscale Keflavik

Reykjanesbær, Suðurnes, Iceland

5.1 MW IT power

Questions

## Microsoft Narvik Norway, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Microsoft Narvik Norway?

Microsoft Narvik Norway is in Bjerkvik, Narvik, Norway. Epoch AI publishes its coordinates as 68.5763, 17.5963.

### Who owns Microsoft Narvik Norway?

Epoch AI lists Nscale (Epoch AI rates this likely) as its owner and Microsoft (Epoch AI rates this likely) as its user.

### How much power does Microsoft Narvik Norway use?

No building is operating yet, so Epoch AI states no IT power for it today. It projects 92 MW of IT power by December 31, 2026.

### Is Microsoft Narvik Norway operating?

Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).