# Microsoft Project Osmium SI Data Center, Cumming, IA | $SIS

> Microsoft Project Osmium is an SI data center in Cumming, Iowa, owned by Microsoft. Epoch AI puts its IT power at 190 MW (Jun 16, 2026). Map and timeline.

Source: https://siscto.si/power-map/microsoft-project-osmium/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. Microsoft Project Osmium

Power Map · Operating

# Microsoft Project Osmium, Cumming

Microsoft Project Osmium is an SI data center in Cumming, Iowa, United States, owned by Microsoft and used by OpenAI (Epoch AI rates this speculative). [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 190 MW as of June 16, 2026, with 4 buildings operating. Its public timeline starts on December 18, 2018.

IT power
:   190 MW (Jun 16, 2026)

Facility power
:   228 MW

Status
:   Operating

Buildings operating
:   4

Where it is

## The site and its facts

Microsoft Project Osmium on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Cumming, Iowa, United States

Address
:   5855 SW Kerry St, Cumming, IA 50061

Coordinates
:   41.4970° N, 93.7894° W

Owner
:   Microsoft

Users
:   OpenAI (Epoch AI rates this speculative)

Chips
:   A100, H100, B200

Compute
:   About 155,634 H100 equivalents (Epoch AI estimate, Jun 16, 2026)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here -0.1 °C against the land 5 to 10 km around it by day, a change of +0.2 °C since before work on this build began.

[Open Heat Watch](https://siscto.si/heat-watch/microsoft-project-osmium/)

### Lights On

NASA's night imagery read 24.2 of 100 over this site in October 2026, against 1.5 in October 2018, the first month read. Against a year before: -5.0 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=microsoft-project-osmium#view)

## Dated, from the public record

Epoch AI's dated notes on Microsoft Project Osmium, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Dec 18, 2018**

> Land clearing begins on the north part of the site

No IT power yet (0 operating)

**Jan 1, 2021**

> Building 1 and 1st building on the site are operational. Foundation work begins on Building 2

48 MW (1 operating)

**Jun 30, 2023**

> Building 2 is operational. Estimated based on Microsoft H100 count 2023

95 MW (2 operating)

**Mar 1, 2025**

> Building 3-4 operational, no visible construction.

190 MW (4 operating)

**Oct 8, 2025**

> Site already complete.

190 MW (4 operating)

**Jun 16, 2026**

> No notable changes since October.

190 MW (4 operating)

Adopt a site

## Watch Microsoft Project Osmium

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [SemiAnalysis article with IT power estimations and detailing usage by OpenAI for training GPT 3.5](https://newsletter.semianalysis.com/p/microsofts-ai-strategy-deconstructed)

- [DCD Article on site expansion](https://www.datacenterdynamics.com/en/news/microsoft-granted-permit-for-new-data-center-in-des-moines-iowa/)

- [MISO Announcement reporting power for newest buildings, likely an overestimate](https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf)

- [Microsoft article on data centers in Iowa used by OpenAI](https://news.microsoft.com/source/features/ai/west-des-moines-iowa-ai-supercomputer/?msockid=23bbdd21a02166402e27c929a1a567ce)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Microsoft Project Osmium (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

171 km away

### Google Council Bluffs (East)

Council Bluffs, Iowa, United States

237 MW IT power

176 km away

### QTS Cedar Rapids

Cedar Rapids, Iowa, United States

IT power not stated

178 km away

### Google Cedar Rapids

Cedar Rapids, Iowa, United States

IT power not stated

193 km away

### Google Omaha

Omaha, Nebraska, United States

237 MW IT power

Questions

## Microsoft Project Osmium, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Microsoft Project Osmium?

Microsoft Project Osmium is in Cumming, Iowa, United States, at 5855 SW Kerry St, Cumming, IA 50061. Epoch AI publishes its coordinates as 41.4970, -93.7894.

### Who owns Microsoft Project Osmium?

Epoch AI lists Microsoft as its owner and OpenAI (Epoch AI rates this speculative) as its user.

### How much power does Microsoft Project Osmium use?

Epoch AI estimates its IT power at 190 MW as of June 16, 2026, and its total facility power at 228 MW.

### Is Microsoft Project Osmium operating?

Yes. Epoch AI counts 4 buildings operating as of June 16, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).