# Nebius Mantsala SI Data Center, Mantsala, Finland | $SIS

> Nebius Mantsala is an SI data center in Mantsala, Uusimaa, Finland, owned by Nebius. Epoch AI puts its IT power at 75 MW (Jun 29, 2026). Map and timeline.

Source: https://siscto.si/power-map/nebius-mantsala/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. Nebius Mantsala

Power Map · Operating, expanding

# Nebius Mantsala, Mantsala

Nebius Mantsala is an SI data center in Mantsala, Uusimaa, Finland, owned by Nebius and used by Microsoft (Epoch AI rates this speculative). [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 75 MW as of June 29, 2026, with 3 buildings operating, and projects 145 MW by December 31, 2027. Its public timeline starts on October 8, 2024.

IT power
:   75 MW (Jun 29, 2026)

Facility power
:   90 MW

Status
:   Operating, expanding

Buildings operating
:   3

Where it is

## The site and its facts

Nebius Mantsala on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Mantsala, Uusimaa, Finland

Address
:   Not public

Coordinates
:   60.6294° N, 25.2605° E

Owner
:   Nebius

Users
:   Microsoft (Epoch AI rates this speculative)

Chips
:   H100, B300, H200

Compute
:   About 48,528 H100 equivalents (Epoch AI estimate, Jun 29, 2026)

Projected
:   145 MW IT power by December 31, 2027 (Epoch AI projection, not a fact yet)

Timeline

### The Gigawatt Ledger

Nebius Mäntsälä: 75 MW was announced for this project. Public evidence puts 75 to 90 MW in operation as of June 29, 2026, against 75 MW announced: 100%. The low end is the IT load, the high end the whole facility, because the announcement does not say which it means.

[Open it in the Ledger](https://siscto.si/ledger/nebius-mantsala/)

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +0.3 °C against the land 5 to 10 km around it by day, a change of +0.1 °C since before work on this build began.

[Open Heat Watch](https://siscto.si/heat-watch/nebius-mantsala/)

### Lights On

NASA's night imagery read 7.0 of 100 over this site in October 2026, against 10.0 in October 2018, the first month read. Against a year before: -4.8 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=nebius-mantsala#view)

## Dated, from the public record

Epoch AI's dated notes on Nebius Mantsala, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Oct 8, 2024**

> [Nebius announces expansion of Mantsala campus to 75MW.](https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw)

40 MW (2 operating)

**Nov 14, 2025**

> Satellite imagery suggests that installation of the cooling units is finalizing on the expansion building. Construction equipment remains around the site. We do not believe the building is operational at this point.

40 MW (2 operating)

**Mar 31, 2026**

> [Nebius announces that the expansion to 75MW is operational at the beginning of 2026.](https://nebius.com/newsroom/nebius-to-construct-310-mw-ai-factory-in-finland)

75 MW (3 operating)

**Jun 29, 2026**

> All three buildings in the first phase are operational.

75 MW (3 operating)

**Dec 31, 2027 (Projection)**

> [According to company estimates, the second expansion of 70MW will be complete by the end of 2027.](https://www.linkedin.com/posts/at-earnings-we-said-nebius-is-expanding-its-share-7493603318020370433-hkGo/?utm_source=share&utm_medium=member_ios&rcm=ACoAAAA0mUUBRa3Pv7LQtyPOfMvNdkHncgpQUmc)

145 MW (4 operating)

Adopt a site

## Watch Nebius Mantsala

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Nebius to triple capacity of Mantsala campus to 75 MW](https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw)

- [Nebius announcing deployment of first GB300 NVL72 systems in Europe](https://nebius.com/blog/posts/first-live-nvidia-gb300-nvl72-deployment-in-europe)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Nebius Mantsala (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

537 km away

### EcoDataCenter 2

Borlänge, Dalarna County, Sweden

IT power not stated

955 km away

### Microsoft Narvik Norway

Bjerkvik, Narvik, Norway

IT power not stated

1,013 km away

### CoreWeave Norway

Øvrebø, Agder, Norway

42 MW IT power

1,838 km away

### Google Waltham Cross

Cheshunt, Hertfordshire, United Kingdom

88 MW IT power

Questions

## Nebius Mantsala, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Nebius Mantsala?

Nebius Mantsala is in Mantsala, Uusimaa, Finland. Epoch AI publishes its coordinates as 60.6294, 25.2605.

### Who owns Nebius Mantsala?

Epoch AI lists Nebius as its owner and Microsoft (Epoch AI rates this speculative) as its user.

### How much power does Nebius Mantsala use?

Epoch AI estimates its IT power at 75 MW as of June 29, 2026, and its total facility power at 90 MW. It projects 145 MW of IT power by December 31, 2027.

### Is Nebius Mantsala operating?

Yes, and it is growing. Epoch AI counts 3 buildings operating as of June 29, 2026, with more capacity on its timeline.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).