# OpenAI Stargate Lordstown, Lordstown

OpenAI Stargate Lordstown is an SI data center in Lordstown, Ohio, United States, owned by Softbank and used by OpenAI. [Epoch AI](https://epoch.ai/data/ai-data-centers) tracks it as under construction: no building is operating yet as of July 30, 2026, and projects 214 MW by March 1, 2027. Its public timeline starts on October 12, 2025.

IT power
:   Not stated (Epoch AI)

Facility power
:   Not stated

Status
:   Under construction

Buildings operating
:   0

Where it is

## The site and its facts

OpenAI Stargate Lordstown on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Lordstown, Ohio, United States

Address
:   2300 Hallock Young Rd, Warren, OH 44481

Coordinates
:   41.1531° N, 80.8812° W

Owner
:   Softbank

Users
:   OpenAI

Project
:   Stargate

Projected
:   214 MW IT power by March 1, 2027 (Epoch AI projection, not a fact yet)

Timeline

### The Gigawatt Ledger

Stargate Lordstown: No power figure was announced for this project. Epoch AI tracks the site as under construction, with no building operating as of July 30, 2026.

[Open it in the Ledger](https://siscto.si/ledger/stargate-lordstown/)

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +2.2 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/openai-stargate-lordstown/)

### Lights On

NASA's night imagery read 36.4 of 100 over this site in October 2026, against 46.2 in October 2018, the first month read. Against a year before: -1.9 points. The place was already bright at the first reading, so growth is harder to see. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=openai-stargate-lordstown#view)

## Dated, from the public record

Epoch AI's dated notes on OpenAI Stargate Lordstown, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Oct 12, 2025**

> Land clearing begins in the front of the site (the side facing the Ohio Turnpike), clearing away a parking lot and solar array

No IT power yet (0 operating)

**Feb 27, 2026**

> Still no visible construction, although construction within preexisting facilities

No IT power yet (0 operating)

**Jul 30, 2026**

> Active construction visible on and around the datacenter, with the roofing mostly in place. This is based on satellite imagery. No buildings operational yet.

No IT power yet (0 operating)

**Mar 1, 2027 (Projection)**

> Projected operational date. OpenAI [stated](https://openai.com/index/five-new-stargate-sites/) Lordstown and Milam County could scale to 1.5 GW within 18 months of their September 23, 2025 announcement; subtracting Milam County's subsequently disclosed 1.2 GW capacity implies ~300 MW for Lordstown.

214 MW (1 operating)

Adopt a site

## Watch OpenAI Stargate Lordstown

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Announcement of 5 new Stargate sites mentioning Lordstown](https://www.datacenterdynamics.com/en/news/openai-announces-five-more-us-stargate-data-centers-with-oracle-and-softbank/)

- [Water Quality Permitting stating that “manufacturing and assembly” is the main purpose of the construction](https://drive.google.com/file/d/1VfWvb9unUXZs3u4zwBjZjQwtsu91y8i9/view?usp=drivesdk)

- [Stormwater Permitting](https://drive.google.com/file/d/1xl4Ql2jdmKhcYFhn43ymM2TJ56Z8cInL/view?usp=drivesdk)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for OpenAI Stargate Lordstown (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

195 km away

### AWS New Albany

New Albany, Ohio, United States

213 MW IT power

197 km away

### Meta Prometheus

New Albany, Ohio, United States

471 MW IT power

201 km away

### Google New Albany

New Albany, Ohio, United States

333 MW IT power

220 km away

### Google Lancaster

Lancaster, Ohio, United States

137 MW IT power

Questions

## OpenAI Stargate Lordstown, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is OpenAI Stargate Lordstown?

OpenAI Stargate Lordstown is in Lordstown, Ohio, United States, at 2300 Hallock Young Rd, Warren, OH 44481. Epoch AI publishes its coordinates as 41.1531, -80.8812.

### Who owns OpenAI Stargate Lordstown?

Epoch AI lists Softbank as its owner and OpenAI as its user.

### How much power does OpenAI Stargate Lordstown use?

No building is operating yet, so Epoch AI states no IT power for it today. It projects 214 MW of IT power by March 1, 2027.

### Is OpenAI Stargate Lordstown operating?

Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.