# Oracle Batam SI Data Center, Batam, Indonesia | $SIS

> Oracle Batam is an SI data center in Batam, Riau Islands, Indonesia, owned by Oracle. Epoch AI puts its IT power at 72 MW (May 6, 2026). Map and timeline.

Source: https://siscto.si/power-map/oracle-batam/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. Oracle Batam

Power Map · Operating

# Oracle Batam, Batam

Oracle Batam is an SI data center in Batam, Riau Islands, Indonesia, owned by Oracle (Epoch AI rates this likely) and used by Tencent (Epoch AI rates this speculative). [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 72 MW as of May 6, 2026, with 3 buildings operating. Its public timeline starts on July 1, 2022.

IT power
:   72 MW (May 6, 2026)

Facility power
:   94 MW

Status
:   Operating

Buildings operating
:   3

Where it is

## The site and its facts

Oracle Batam on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Batam, Riau Islands, Indonesia

Address
:   Not public

Coordinates
:   1.1883° N, 104.1050° E

Owner
:   Oracle (Epoch AI rates this likely)

Users
:   Tencent (Epoch AI rates this speculative)

Chips
:   B200, B300

Compute
:   About 84,386 H100 equivalents (Epoch AI estimate, May 6, 2026)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here -2.6 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/oracle-batam/)

### Lights On

NASA's night imagery read 22.5 of 100 over this site in October 2026, against 5.7 in October 2018, the first month read. Against a year before: +0.1 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=oracle-batam#view)

## Dated, from the public record

Epoch AI's dated notes on Oracle Batam, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Jul 1, 2022**

> Land clearing begins.

No IT power yet (0 operating)

**May 15, 2025**

> Building 1 and 2 are operational. Based on Oracle [announcing](https://docs.oracle.com/en-us/iaas/releasenotes/oci/new-region-batam.htm) the Indonesia North (Batam) region is available, and both buildings looking complete soon after, in June.

33 MW (2 operating)

**Jun 13, 2025**

> Building 3 shell is partly built. Building 1 and 2 look complete.

33 MW (2 operating)

**Oct 1, 2025**

> Building 3 has cooling towers beginning to be installed.

33 MW (2 operating)

**Mar 19, 2026**

> Building 3 looks complete including building shell, chillers and backup generators.

33 MW (2 operating)

**Apr 17, 2026**

> Building 3 is operational. Based on it looking complete as of March, and DayOne [posting](https://www.linkedin.com/posts/dayonedc-datacenter-batam-ugcPost-7450899048925986816-Wxqu/) a video of the facility on this date. In one shot of the video, fan movement is visible for all buildings, suggesting they are all operational.

72 MW (3 operating)

**May 6, 2026**

> The three buildings look unchanged since March.

72 MW (3 operating)

Adopt a site

## Watch Oracle Batam

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [DayOne discloses a partnership with "leading global tech company" at their Batam campus](https://www.linkedin.com/posts/digitaltransformation-datacenter-ugcPost-7264614420276744194-aQSa/)

- [Oracle announces their Batam cloud compute region](https://docs.oracle.com/en-us/iaas/releasenotes/oci/new-region-batam.htm)

- [Oracle is later reported to be leasing DayOne data centers in Indonesia](https://www.datacenterdynamics.com/en/news/oracle-establishes-cloud-presence-in-indonesia/)

- [DayOne video stating 72 MW of IT power and NVIDIA partnership, and showing cooling tower fan movement](https://www.linkedin.com/posts/dayonedc-datacenter-batam-ugcPost-7450899048925986816-Wxqu/)

- [Tencent deal with Oracle for 100,000 AI chips in Southeast Asian data centers](https://www.ft.com/content/8799b33d-f07c-4a03-82f0-bf5d3d1d29e9?accessToken=zwAAAaD3-or2kdOHmbM98HxKA9OC8L9dPR0p6Q.MEQCIA_pBrPOlGsccPd3UEtachg3kZ3Mwf4xusSWqcN8MiuLAiAv5TwQnZRSQuibHbQhluPLV6Qy1l8-MGIP01Q1j867sg&sharetype=gift&token=6796be6f-e465-4115-beae-a3ca06ad8cbf&syn-25a6b1a6=1)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for Oracle Batam (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

59 km away

### DayOne Kempas

Kempas, Johor, Malaysia

421.7 MW IT power

62 km away

### DayOne Nusajaya

Johor Bahru, Johor, Malaysia

473 MW IT power

81 km away

### YTL Johor

Kulai, Johor, Malaysia

113 MW IT power

95 km away

### Bridge Data Centres MY06

Kulai, Johor, Malaysia

243 MW IT power

Questions

## Oracle Batam, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is Oracle Batam?

Oracle Batam is in Batam, Riau Islands, Indonesia. Epoch AI publishes its coordinates as 1.1883, 104.1050.

### Who owns Oracle Batam?

Epoch AI lists Oracle (Epoch AI rates this likely) as its owner and Tencent (Epoch AI rates this speculative) as its user.

### How much power does Oracle Batam use?

Epoch AI estimates its IT power at 72 MW as of May 6, 2026, and its total facility power at 94 MW.

### Is Oracle Batam operating?

Yes. Epoch AI counts 3 buildings operating as of May 6, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).