# QTS Cedar Rapids SI Data Center, Cedar Rapids, IA | $SIS

> QTS Cedar Rapids is an SI data center in Cedar Rapids, Iowa, owned by Meta. Epoch AI tracks it as under construction. Map, timeline, sources and its watcher.

Source: https://siscto.si/power-map/qts-cedar-rapids/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. QTS Cedar Rapids

Power Map · Under construction

# QTS Cedar Rapids, Cedar Rapids

QTS Cedar Rapids is an SI data center in Cedar Rapids, Iowa, United States, owned by Meta (Epoch AI rates this speculative) and used by Meta (Epoch AI rates this speculative). [Epoch AI](https://epoch.ai/data/ai-data-centers) tracks it as under construction: no building is operating yet as of October 23, 2026, and projects 1,133 MW by November 15, 2027. Its public timeline starts on January 17, 2025.

IT power
:   Not stated (Epoch AI)

Facility power
:   Not stated

Status
:   Under construction

Buildings operating
:   0

Where it is

## The site and its facts

QTS Cedar Rapids on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Cedar Rapids, Iowa, United States

Address
:   6200 76th Ave SW, Fairfax, IA 52228

Coordinates
:   41.9095° N, 91.7429° W

Owner
:   Meta (Epoch AI rates this speculative)

Users
:   Meta (Epoch AI rates this speculative)

Energy
:   Alliant Energy

Projected
:   1,133 MW IT power by November 15, 2027 (Epoch AI projection, not a fact yet)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +0.3 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/qts-cedar-rapids/)

### Lights On

NASA's night imagery read 58.4 of 100 over this site in October 2026, against 2.7 in October 2018, the first month read. Against a year before: +29.8 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=qts-cedar-rapids#view)

## Dated, from the public record

Epoch AI's dated notes on QTS Cedar Rapids, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Jan 17, 2025**

> Land clearing begins for Building 1-3.

No IT power yet (0 operating)

**Oct 27, 2025**

> Building 1 roof complete, with air-cooled chillers in place. Building 2 and 3 roofs are partly completed. Building 4 and 5 have a foundation.

No IT power yet (0 operating)

**Apr 16, 2026**

> Based on satellite imagery, the Buildings 1-3 shells look complete. Buildings 4-6 are far along, with roofs largely in place, while the eastern Building 7 foundation is well underway. No buildings operational yet.

No IT power yet (0 operating)

**May 7, 2026**

> Similar to April, Buildings 1-3 shells look complete. Buildings 4-6 are still far along, and the eastern Building 7 foundation is still underway.

No IT power yet (0 operating)

**Oct 23, 2026**

> Buildings 1 to 3 look externally complete, with the air-cooled chillers fully installed, and surrounding yard work cleared. The many cars and trucks parked beside the buildings suggest commissioning is still underway, so we’re not counting any buildings operational yet. Buildings 4-6 shells appear complete, and Building 7 is nearly 90% roofed. This is based on high-resolution satellite imagery from this date.

No IT power yet (0 operating)

**Dec 31, 2026 (Projection)**

> Buildings 1-3 are operational. Based on the visible progress in the October satellite image, and the expected completion date reported by [local news](https://corridorbusiness.com/scope-of-qts-data-project-in-cedar-rapids-continuing-to-grow/): “A QTS spokesperson said in July [2025] that the first phase of the project was expected to be completed in late 2026."

448 MW (3 operating)

**Nov 15, 2027 (Projection)**

> Buildings 4-7 are operational. Based on the expected completion date reported by [local news](https://corridorbusiness.com/scope-of-qts-data-project-in-cedar-rapids-continuing-to-grow/): “A QTS spokesperson said in July [2025] that [...] The second phase is expected to be completed in late 2027."

1,133 MW (7 operating)

Adopt a site

## Watch QTS Cedar Rapids

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [MISO new load announcements](https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf)

- [Article by The Gazette](https://www.thegazette.com/business/fast-start-to-cedar-rapids-data-center-projects/)

- [Article by Corridor Business Journal](https://corridorbusiness.com/scope-of-qts-data-project-in-cedar-rapids-continuing-to-grow/)

- [Post by GLD Commercial](https://www.gldcommercial.com/google-and-qts-data/)

- [Post by SemiAnalysis](https://newsletter.semianalysis.com/p/meta-compute-everyone-wants-to-be)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for QTS Cedar Rapids (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

2 km away

### Google Cedar Rapids

Cedar Rapids, Iowa, United States

IT power not stated

176 km away

### Microsoft Project Osmium

Cumming, Iowa, United States

190 MW IT power

326 km away

### Microsoft Fairwater Wisconsin

Mount Pleasant, Wisconsin, United States

369 MW IT power

332 km away

### Meta Rosemount

Rosemount, Minnesota, United States

178 MW IT power

Questions

## QTS Cedar Rapids, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is QTS Cedar Rapids?

QTS Cedar Rapids is in Cedar Rapids, Iowa, United States, at 6200 76th Ave SW, Fairfax, IA 52228. Epoch AI publishes its coordinates as 41.9095, -91.7429.

### Who owns QTS Cedar Rapids?

Epoch AI lists Meta (Epoch AI rates this speculative) as its owner and Meta (Epoch AI rates this speculative) as its user.

### How much power does QTS Cedar Rapids use?

No building is operating yet, so Epoch AI states no IT power for it today. It projects 1,133 MW of IT power by November 15, 2027.

### Is QTS Cedar Rapids operating?

Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).