# QTS Eagle Mountain SI Data Center, Eagle Mountain, UT | $SIS

> QTS Eagle Mountain is an SI data center in Eagle Mountain, Utah, owned by Meta. Epoch AI tracks it as under construction. Map, dated timeline and sources.

Source: https://siscto.si/power-map/qts-eagle-mountain/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. QTS Eagle Mountain

Power Map · Under construction

# QTS Eagle Mountain, Eagle Mountain

QTS Eagle Mountain is an SI data center in Eagle Mountain, Utah, United States, owned by Meta (Epoch AI rates this speculative) and used by Meta (Epoch AI rates this speculative). [Epoch AI](https://epoch.ai/data/ai-data-centers) tracks it as under construction: no building is operating yet as of May 2, 2026, and projects 304 MW by July 1, 2027. Its public timeline starts on October 1, 2023.

IT power
:   Not stated (Epoch AI)

Facility power
:   Not stated

Status
:   Under construction

Buildings operating
:   0

Where it is

## The site and its facts

QTS Eagle Mountain on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Eagle Mountain, Utah, United States

Address
:   652 E Hyperscale Way, Eagle Mountain, UT 84013

Coordinates
:   40.2650° N, 112.0286° W

Owner
:   Meta (Epoch AI rates this speculative)

Users
:   Meta (Epoch AI rates this speculative)

Projected
:   304 MW IT power by July 1, 2027 (Epoch AI projection, not a fact yet)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +0.9 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/qts-eagle-mountain/)

### Lights On

NASA's night imagery read 53.5 of 100 over this site in October 2026, against 0.7 in October 2018, the first month read. Against a year before: +35.4 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=qts-eagle-mountain#view)

## Dated, from the public record

Epoch AI's dated notes on QTS Eagle Mountain, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Oct 1, 2023**

> First signs of site preparation show up on satellite imagery.

No IT power yet (0 operating)

**Sep 8, 2025**

> Site preparation continues. Outline of a first building that is not the data center of interest Buildings 1 or 2 is visible.

No IT power yet (0 operating)

**May 2, 2026**

> Building 1 roof finished. Satellite imagery shows construction vehicles and concrete pads with no air cooled chiller units indicating Buildings 1 and 2 cooling install continues. On the other side of each building, emergency generator install continues as well.

No IT power yet (0 operating)

**Dec 31, 2026 (Projection)**

> We estimate Buildings 1 and 2 will be fully operational by the end of 2026 because there are at least seven months since cooling and emergency generators have started to be installed. This estimate is also in line with similar QTS data center campus construction timelines.

203 MW (2 operating)

**Jul 1, 2027 (Projection)**

> We estimate Building 3 will be fully operational by H2 2027 following a similar time line to Buildings 1 and 2 of 14 months from land clearing to operational.

304 MW (3 operating)

Adopt a site

## Watch QTS Eagle Mountain

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [QTS Eagle Mountain website](https://q.com/data-centers/eagle-mountain/)

- [DEQ Approval listing emergency generators](https://daqpermitting.utah.gov/DocViewer?IntDocID=155764&contentType=application/pdf)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for QTS Eagle Mountain (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

1 km away

### Meta Eagle Mountain

Eagle Mountain, Utah, United States

133 MW IT power

500 km away

### Meta Kuna

Kuna, Idaho, United States

152 MW IT power

614 km away

### Meta Cheyenne

Cheyenne, Wyoming, United States

152 MW IT power

637 km away

### Google Storey County

Clark, Nevada, United States

161 MW IT power

Questions

## QTS Eagle Mountain, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is QTS Eagle Mountain?

QTS Eagle Mountain is in Eagle Mountain, Utah, United States, at 652 E Hyperscale Way, Eagle Mountain, UT 84013. Epoch AI publishes its coordinates as 40.2650, -112.0286.

### Who owns QTS Eagle Mountain?

Epoch AI lists Meta (Epoch AI rates this speculative) as its owner and Meta (Epoch AI rates this speculative) as its user.

### How much power does QTS Eagle Mountain use?

No building is operating yet, so Epoch AI states no IT power for it today. It projects 304 MW of IT power by July 1, 2027.

### Is QTS Eagle Mountain operating?

Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).