# QTS Richmond 1, Sandston

QTS Richmond 1 is an SI data center in Sandston, Virginia, United States. [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 238 MW as of February 13, 2026, with 5 buildings operating. Its public timeline starts on October 1, 2023.

IT power
:   238 MW (Feb 13, 2026)

Facility power
:   333 MW

Status
:   Operating

Buildings operating
:   5

Where it is

## The site and its facts

QTS Richmond 1 on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Sandston, Virginia, United States

Address
:   6000 Technology Blvd, Sandston, VA 23150

Coordinates
:   37.4855° N, 77.2469° W

Owner
:   Not public

Compute
:   About 242,547 H100 equivalents (Epoch AI estimate, Feb 13, 2026)

Energy
:   Dominion Energy

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +0.0 °C against the land 5 to 10 km around it by day, a change of +0.5 °C since before work on this build began.

[Open Heat Watch](https://siscto.si/heat-watch/qts-richmond-1/)

### Lights On

NASA's night imagery read 63.6 of 100 over this site in October 2026, against 25.9 in October 2018, the first month read. Against a year before: +8.5 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=qts-richmond-1#view)

## Dated, from the public record

Epoch AI's dated notes on QTS Richmond 1, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Oct 1, 2023**

> Land cleared for site expansion, some materials down at substation site. We assume that Buildings 1 and 2 are not running AI workloads at this point due to the lack of cooling infrastructure.

No IT power yet (0 operating)

**Nov 2, 2023**

> Building 1 and 2 retrofitting has begun (see [Google Earth](https://earth.google.com/web/@37.48913637,-77.24705465,44.31788662a,1464.06665017d,30.00094375y,3.66969189h,0t,0r/data=ChYqEAgBEgoyMDIzLTExLTAyGAFCAggBMikKJwolCiExWVNYSWZQZkcydXVMYm1nUDkyc2NObE1QenF1VGRVV2cgAToDCgEwQgIIAEoICMOJgf0CEAE)). Building 1 has chillers added to the roof and perimeter, and backup generators added to the perimeter.

No IT power yet (0 operating)

**Jan 29, 2024**

> Building 1 (retrofitted) is operational. This is based on it looking complete, and cooling towers possibly showing water vapor plumes, in this [Google Earth image](https://earth.google.com/web/@37.4875167,-77.24806799,43.67572425a,2395.6622579d,30.00094375y,3.66969189h,0t,0r/data=ChYqEAgBEgoyMDI0LTAyLTA2GAFCAggBMikKJwolCiExWVNYSWZQZkcydXVMYm1nUDkyc2NObE1QenF1VGRVV2cgAToDCgEwQgIIAEoICMOJgf0CEAE). Building 2 has chillers added to the roof and perimeter, and backup generators added to the perimeter. Cooling towers near Building 2 have been removed. Building 3 shell is under construction.

47 MW (1 operating)

**Jun 23, 2024**

> Building 2 (retrofitted) is operational. This is based on Building 2 looking compelte, and construction around Building 1 and 2 being mostly cleared. A colored motion artifact on one of the Building 1 cooling tower fans suggests it is moving. Building 3 cooling is installed, backup generators partly installed. Building 4 shell is under construction.

94 MW (2 operating)

**Feb 4, 2025**

> Building 3 is operational, based on the building looking complete and the carpark to the south being full. Three more backup generators added to the Building 1 and 2 area, with a lot more construction equipment again (but this could be a laydown area for Richmond 2). Building 4 has cooling and backup generators fully installed. Building 5 has cooling installed, and backup generators partly installed.

142 MW (3 operating)

**Jun 3, 2025**

> Building 4 is operational, based on a complete building and full carpark in a [Google Earth image](https://earth.google.com/web/@37.48350155,-77.25010039,60.24751599a,83.68032361d,30.00094375y,3.66969189h,0t,0r/data=CgwqBggBEgAYAUICCAEyKQonCiUKITFZU1hJZlBmRzJ1dUxibWdQOTJzY05sTVB6cXVUZFVXZyABOgMKATBCAggASggIw4mB_QIQAQ). Building 5 does not seem quite operational given the empty carpark and construction activity at the perimeter.

190 MW (4 operating)

**Nov 19, 2025**

> Building 5 is operational, based on a complete building and full carpark in a [Google Earth image](https://earth.google.com/web/@37.48747566,-77.2485616,47.03705985a,2549.72172121d,30.00094375y,3.66969189h,0t,0r/data=ChYqEAgBEgoyMDI1LTExLTE5GAFCAggBMikKJwolCiExWVNYSWZQZkcydXVMYm1nUDkyc2NObE1QenF1VGRVV2cgAToDCgEwQgIIAEoICMOJgf0CEAE). Construction equipment around Building 1 and 2 has cleared up again.

238 MW (5 operating)

**Dec 31, 2025**

> No changes to the site since November 2025.

238 MW (5 operating)

**Feb 13, 2026**

> No changes to the site since December 2025.

238 MW (5 operating)

Adopt a site

## Watch QTS Richmond 1

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Richmond 1 factsheet](https://qtsdatacenters.com/data-centers/richmond-1/)

- [Environmental permit detailing power generation](https://www.deq.virginia.gov/home/showpublisheddocument/25650/638627871515730000)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for QTS Richmond 1 (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

0 km away

### QTS Richmond 2

Sandston, Virginia, United States

180 MW IT power

1 km away

### QTS Richmond 3

Sandston, Virginia, United States

144 MW IT power

16 km away

### CoreWeave Chester VA

Chester, Virginia, United States

82 MW IT power

142 km away

### STACK Infrastructure NVA02

Manassas, Virginia, United States

85 MW IT power

Questions

## QTS Richmond 1, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is QTS Richmond 1?

QTS Richmond 1 is in Sandston, Virginia, United States, at 6000 Technology Blvd, Sandston, VA 23150. Epoch AI publishes its coordinates as 37.4855, -77.2469.

### Who owns QTS Richmond 1?

Epoch AI does not name an owner yet.

### How much power does QTS Richmond 1 use?

Epoch AI estimates its IT power at 238 MW as of February 13, 2026, and its total facility power at 333 MW.

### Is QTS Richmond 1 operating?

Yes. Epoch AI counts 5 buildings operating as of February 13, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).