# QTS Richmond 2 SI Data Center, Sandston, VA | $SIS

> QTS Richmond 2 is an SI data center in Sandston, Virginia. Epoch AI puts its IT power at 180 MW (May 14, 2026). Map, timeline, sources and its watcher.

Source: https://siscto.si/power-map/qts-richmond-2/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. QTS Richmond 2

Power Map · Operating

# QTS Richmond 2, Sandston

QTS Richmond 2 is an SI data center in Sandston, Virginia, United States. [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 180 MW as of May 14, 2026, with 5 buildings operating. Its public timeline starts on April 1, 2022.

IT power
:   180 MW (May 14, 2026)

Facility power
:   252 MW

Status
:   Operating

Buildings operating
:   5

Where it is

## The site and its facts

QTS Richmond 2 on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Sandston, Virginia, United States

Address
:   6030 to 6070 Technology Blvd, Sandston, VA 23150

Coordinates
:   37.4850° N, 77.2428° W

Owner
:   Not public

Compute
:   About 182,921 H100 equivalents (Epoch AI estimate, May 14, 2026)

Energy
:   Dominion Energy

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here +1.1 °C against the land 5 to 10 km around it by day, a change of +1.5 °C since before work on this build began.

[Open Heat Watch](https://siscto.si/heat-watch/qts-richmond-2/)

### Lights On

NASA's night imagery read 68.0 of 100 over this site in October 2026, against 25.3 in October 2018, the first month read. Against a year before: +12.1 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=qts-richmond-2#view)

## Dated, from the public record

Epoch AI's dated notes on QTS Richmond 2, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Apr 1, 2022**

> Land clearing begins.

No IT power yet (0 operating)

**Jan 29, 2024**

> Building 1 and 2 look complete but we don't think they are operational, as the substation is still under construction.

No IT power yet (0 operating)

**Jun 23, 2024**

> Still not many cars parked at Building 1 and 2, and the east substation looks very close to completion, based on a [Google Earth image](https://earth.google.com/web/@37.48655608,-77.24244153,55.96289131a,2859.52501034d,30.00094375y,0h,0.5917603t,0r/data=ChYqEAgBEgoyMDI0LTA2LTIzGAFCAggBMikKJwolCiExWVNYSWZQZkcydXVMYm1nUDkyc2NObE1QenF1VGRVV2cgAToDCgEwQgIIAEoICMOJgf0CEAE).

No IT power yet (0 operating)

**Feb 4, 2025**

> Building 1 and 2 are operational, based on the east substation looking complete and the carparks being more full. Building 3 has cooling and generators mostly installed. Building 4 roof is partly completed.

72 MW (2 operating)

**Nov 19, 2025**

> The west substation looks complete, based on a [Google Earth image](https://earth.google.com/web/@37.48673632,-77.24119214,61.15398527a,3616.77426559d,30.00094375y,0.00000001h,0.59183057t,0r/data=CgwqBggBEgAYAUICCAEyKQonCiUKITFZU1hJZlBmRzJ1dUxibWdQOTJzY05sTVB6cXVUZFVXZyABOgMKATBCAggASggIw4mB_QIQAQ). This image also shows one corner of Building 5 that still has construction work, so it's probably not operational.

72 MW (2 operating)

**Dec 31, 2025**

> Building 3 and 4 are operational, based on the substation being completed earlier, the buildings looking complete, and carparks being moderately full. Building 5 still has construction work.

144 MW (4 operating)

**Feb 13, 2026**

> Building 5 still has construction work at the perimeter, but given how close it looks to completion, we estimate it's only about 3 months away from operational.

144 MW (4 operating)

**May 14, 2026**

> Building 5 is estimated to be operational, based on the previous entry.

180 MW (5 operating)

Adopt a site

## Watch QTS Richmond 2

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Richmond 2 factsheet](https://qtsdatacenters.com/data-centers/richmond-1/)

- [Environmental permit detailing power generation](https://www.deq.virginia.gov/home/showpublisheddocument/25650/638627871515730000)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for QTS Richmond 2 (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

0 km away

### QTS Richmond 1

Sandston, Virginia, United States

238 MW IT power

1 km away

### QTS Richmond 3

Sandston, Virginia, United States

144 MW IT power

16 km away

### CoreWeave Chester VA

Chester, Virginia, United States

82 MW IT power

142 km away

### STACK Infrastructure NVA02

Manassas, Virginia, United States

85 MW IT power

Questions

## QTS Richmond 2, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is QTS Richmond 2?

QTS Richmond 2 is in Sandston, Virginia, United States, at 6030 to 6070 Technology Blvd, Sandston, VA 23150. Epoch AI publishes its coordinates as 37.4850, -77.2428.

### Who owns QTS Richmond 2?

Epoch AI does not name an owner yet.

### How much power does QTS Richmond 2 use?

Epoch AI estimates its IT power at 180 MW as of May 14, 2026, and its total facility power at 252 MW.

### Is QTS Richmond 2 operating?

Yes. Epoch AI counts 5 buildings operating as of May 14, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).