# QTS Richmond 3, Sandston

QTS Richmond 3 is an SI data center in Sandston, Virginia, United States. [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 144 MW as of May 14, 2026, with 3 buildings operating, and projects 240 MW by February 13, 2027. Its public timeline starts on April 1, 2024.

IT power
:   144 MW (May 14, 2026)

Facility power
:   202 MW

Status
:   Operating, expanding

Buildings operating
:   3

Where it is

## The site and its facts

QTS Richmond 3 on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Sandston, Virginia, United States

Address
:   3525 to 3543 Portugee Rd, Sandston, VA 23150

Coordinates
:   37.4792° N, 77.2510° W

Owner
:   Not public

Compute
:   About 174,836 H100 equivalents (Epoch AI estimate, May 14, 2026)

Energy
:   Dominion Energy

Projected
:   240 MW IT power by February 13, 2027 (Epoch AI projection, not a fact yet)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here -0.4 °C against the land 5 to 10 km around it by day.

[Open Heat Watch](https://siscto.si/heat-watch/qts-richmond-3/)

### Lights On

NASA's night imagery read 56.2 of 100 over this site in October 2026, against 18.2 in October 2018, the first month read. Against a year before: +9.1 points. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=qts-richmond-3#view)

## Dated, from the public record

Epoch AI's dated notes on QTS Richmond 3, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Apr 1, 2024**

> Land clearing begins.

No IT power yet (0 operating)

**Feb 4, 2025**

> Building 1 shell is mostly complete, with some chillers installed on the roof. Building 2 shell is under construction.

No IT power yet (0 operating)

**Nov 19, 2025**

> The substation is still under construction, based on a [Google Earth image](https://earth.google.com/web/@37.48033002,-77.25002949,65.53442036a,2152.9927926d,30.00094375y,-0.00000001h,0.59169466t,0r/data=CgwqBggBEgAYAUICCAEyKQonCiUKITFZU1hJZlBmRzJ1dUxibWdQOTJzY05sTVB6cXVUZFVXZyABOgMKATBCAggASggIw4mB_QIQAQ), so we don't think any buildings are operational yet.

No IT power yet (0 operating)

**Dec 31, 2025**

> The substation looks complete, but we expect Building 1 still needs commissioning before it is fully operational.

No IT power yet (0 operating)

**Feb 13, 2026**

> Building 1 is operational, based on the substation being completed earlier and cars in the carpark. Building 2 and 3 are not operational, based on minor construction work at the perimeter and no cars in the carpark, but we expect they will be operational within 3 months. Building 4 has complete chillers and backup generators, while Building 5 has chillers but only a few backup generators - roughly the state of Building 1 on 2025-02-04.

48 MW (1 operating)

**May 14, 2026**

> Building 2 and 3 are operational, based on the previous entry.

144 MW (3 operating)

**Feb 13, 2027 (Projection)**

> Building 4 and 5 are operational, based on Building 5 being roughly 1 year behind Building 1 in satellite imagery.

240 MW (5 operating)

Adopt a site

## Watch QTS Richmond 3

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Richmond 3 factsheet](https://q.com/data-centers/richmond-3/)

- [Environmental permit detailing power generation](https://www.deq.virginia.gov/home/showpublisheddocument/25650/638627871515730000)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for QTS Richmond 3 (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

1 km away

### QTS Richmond 1

Sandston, Virginia, United States

238 MW IT power

1 km away

### QTS Richmond 2

Sandston, Virginia, United States

180 MW IT power

15 km away

### CoreWeave Chester VA

Chester, Virginia, United States

82 MW IT power

143 km away

### STACK Infrastructure NVA02

Manassas, Virginia, United States

85 MW IT power

Questions

## QTS Richmond 3, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is QTS Richmond 3?

QTS Richmond 3 is in Sandston, Virginia, United States, at 3525 to 3543 Portugee Rd, Sandston, VA 23150. Epoch AI publishes its coordinates as 37.4792, -77.2510.

### Who owns QTS Richmond 3?

Epoch AI does not name an owner yet.

### How much power does QTS Richmond 3 use?

Epoch AI estimates its IT power at 144 MW as of May 14, 2026, and its total facility power at 202 MW. It projects 240 MW of IT power by February 13, 2027.

### Is QTS Richmond 3 operating?

Yes, and it is growing. Epoch AI counts 3 buildings operating as of May 14, 2026, with more capacity on its timeline.