# xAI QTS Atlanta SI Data Center, Atlanta, GA | $SIS

> xAI QTS Atlanta is an SI data center in Atlanta, Georgia, owned by SpaceXAI. Epoch AI puts its IT power at 17.3 MW (Jul 10, 2026). Map, timeline and sources.

Source: https://siscto.si/power-map/xai-qts-atlanta/
Updated: 2026-11-10

1. [Home](https://siscto.si/)
2. [Power Map](https://siscto.si/power-map/)
3. xAI QTS Atlanta

Power Map · Operating

# xAI QTS Atlanta, Atlanta

xAI QTS Atlanta is an SI data center in Atlanta, Georgia, United States, owned by SpaceXAI and used by SpaceXAI. [Epoch AI](https://epoch.ai/data/ai-data-centers) estimates its IT power at 17.3 MW as of July 10, 2026, with 1 building operating. Its public timeline starts on January 23, 2024.

IT power
:   17.3 MW (Jul 10, 2026)

Facility power
:   24 MW

Status
:   Operating

Buildings operating
:   1

Where it is

## The site and its facts

xAI QTS Atlanta on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Place
:   Atlanta, Georgia, United States

Address
:   1025 Jefferson Street NW, Atlanta, GA 30318

Coordinates
:   33.7782° N, 84.4194° W

Owner
:   SpaceXAI

Users
:   SpaceXAI

Chips
:   H100, A100

Compute
:   About 11,470 H100 equivalents (Epoch AI estimate, Jul 10, 2026)

Timeline

### Heat Watch

Over the last three summers NASA's MODIS read the ground here -0.2 °C against the land 5 to 10 km around it by day, a change of -0.2 °C since before work on this build began.

[Open Heat Watch](https://siscto.si/heat-watch/xai-qts-atlanta/)

### Lights On

NASA's night imagery read 96.6 of 100 over this site in October 2026, against 88.9 in October 2018, the first month read. Against a year before: 0.0 points. The place was already bright at the first reading, so growth is harder to see. Light is not proof of what runs inside.

[Open Lights On](https://siscto.si/lights-on/?site=xai-qts-atlanta#view)

## Dated, from the public record

Epoch AI's dated notes on xAI QTS Atlanta, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

**Jan 23, 2024**

> X Corp's $700 million investment in AI training hardware for the Atlanta data center is approved by the Development Authority of Fulton County ([bond resolution fact sheet](https://www.developfultoncounty.com/meetings-and-minutes_239_547601452.pdf)).

No IT power yet (0 operating)

**Feb 20, 2025**

> xAI's GPU cluster in the QTS Atlanta building at 1025 Jefferson Street NW is operational around this time. This date is a tentative estimate: Business Insider reported the buildout in February 2025, so the cluster likely came online around or shortly after then, though the exact date is not disclosed. The cluster comprises 11,000 NVIDIA H100 and about 1,448 A100 GPUs, based on documents submitted to Develop Fulton as [reported by Business Insider](https://www.businessinsider.com/xai-elon-musk-x-new-atlanta-data-center-2025-2). xAI occupies part of this multi-tenant building, so its cooling is not attributed to xAI alone.

17.3 MW (1 operating)

**Aug 21, 2025**

> No significant change to the building since the cluster became operational.

17.3 MW (1 operating)

**Jul 10, 2026**

> No significant change to the building since the August 2025 image.

17.3 MW (1 operating)

Adopt a site

## Watch xAI QTS Atlanta

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

### The watcher

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

- Approved updates show here with their date.

Sources

## Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

- [Develop Fulton bond fact sheet: X Corp Generative AI Equipment Project (Jan 23, 2024)](https://www.developfultoncounty.com/meetings-and-minutes_239_547601452.pdf)

- [Business Insider: Elon Musk's new Atlanta data center for xAI has $700 million in AI equipment](https://www.businessinsider.com/xai-elon-musk-x-new-atlanta-data-center-2025-2)

- [Fortune: Elon Musk's xAI is sharing X's equipment at its Atlanta data center (Jan 24, 2025)](https://fortune.com/2025/01/24/elon-musk-xai-sharing-x-equipment-gpus-datacenter-georgia-tax-breaks-documents/)

- [Epoch AI](https://epoch.ai/data/ai-data-centers), "AI data centers", the record for xAI QTS Atlanta (CC BY 4.0), retrieved November 10, 2026

Nearby

## The nearest SI data centers

The four closest sites on the Power Map, as the crow flies.

37 km away

### Microsoft Fairwater Atlanta

Fayetteville, Georgia, United States

636 MW IT power

115 km away

### CoreWeave Dalton 1 & 2

Dalton, Georgia, United States

28 MW IT power

163 km away

### CoreWeave Marble NC

Marble, North Carolina, United States

65 MW IT power

235 km away

### Meta Huntsville

Huntsville, Alabama, United States

146 MW IT power

Questions

## xAI QTS Atlanta, answered

Where it is, who owns it and how much power it uses, from the public record.

### Where is xAI QTS Atlanta?

xAI QTS Atlanta is in Atlanta, Georgia, United States, at 1025 Jefferson Street NW, Atlanta, GA 30318. Epoch AI publishes its coordinates as 33.7782, -84.4194.

### Who owns xAI QTS Atlanta?

Epoch AI lists SpaceXAI as its owner and SpaceXAI as its user.

### How much power does xAI QTS Atlanta use?

Epoch AI estimates its IT power at 17.3 MW as of July 10, 2026, and its total facility power at 24 MW.

### Is xAI QTS Atlanta operating?

Yes. Epoch AI counts 1 building operating as of July 10, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).
