# The queue at MISO

MISO counts the large loads its members connect through expedited transmission reviews. The yearly total went from 0.1 GW in 2020 to 9.7 GW in 2025, and MISO projected 26.4 GW for 2026 as of July 8, 2026: 17.8 GW already approved and 8.6 GW more proposed.

Figures on file
:   [7](https://siscto.si/queue/miso/#figures)

Newest figure
:   [Jul 8, 2026](https://siscto.si/queue/miso/#figures)

Power Map sites inside
:   [15](https://siscto.si/queue/miso/#sites)

Live on Grid Watch
:   [Yes](https://siscto.si/grid-watch/#miso)

Over time

## Where the source repeats

Each line joins one measure from one source at the dates the source gave, and nothing else. Every number keeps its own definition, date and source. Figures with different definitions are never added together, and a chart joins only the same measure from the same source.

Every figure

## MISO, figure by figure

Newest first. Each card opens its source document.

- **Projected for 2026 (17.8 GW approved, 8.6 GW proposed)**: 26.4 GW, as of July 8, 2026 (in study). MISO's projection for its 2026 planning cycle (MTEP26) as of July 8, 2026: 17.8 GW already approved plus 8.6 GW of additional proposed load, a total MISO states itself. Kept off the yearly line because part of it is still proposed. Source: [MISO, MISO Status Update to the Missouri Public Service Commission](https://psc.mo.gov/CMSInternetData/Agenda%20Presentations/2026%20Presentations/8-19-26%20MISO%20Status%20Update.pdf), Aug 19, 2026.
- **Large load additions in expedited project reviews**: 9.7 GW, as of 2025 (approved). The same measure for 2025. Source: [MISO, MISO Status Update to the Missouri Public Service Commission](https://psc.mo.gov/CMSInternetData/Agenda%20Presentations/2026%20Presentations/8-19-26%20MISO%20Status%20Update.pdf), Aug 19, 2026.
- **Large load additions in expedited project reviews**: 2.7 GW, as of 2024 (approved). The same measure for 2024. Source: [MISO, MISO Status Update to the Missouri Public Service Commission](https://psc.mo.gov/CMSInternetData/Agenda%20Presentations/2026%20Presentations/8-19-26%20MISO%20Status%20Update.pdf), Aug 19, 2026.
- **Large load additions in expedited project reviews**: 900 MW, as of 2023 (approved). The same measure for 2023. Source: [MISO, MISO Status Update to the Missouri Public Service Commission](https://psc.mo.gov/CMSInternetData/Agenda%20Presentations/2026%20Presentations/8-19-26%20MISO%20Status%20Update.pdf), Aug 19, 2026.
- **Large load additions in expedited project reviews**: 300 MW, as of 2022 (approved). The same measure for 2022. Source: [MISO, MISO Status Update to the Missouri Public Service Commission](https://psc.mo.gov/CMSInternetData/Agenda%20Presentations/2026%20Presentations/8-19-26%20MISO%20Status%20Update.pdf), Aug 19, 2026.
- **Large load additions in expedited project reviews**: 200 MW, as of 2021 (approved). The same measure for 2021. Source: [MISO, MISO Status Update to the Missouri Public Service Commission](https://psc.mo.gov/CMSInternetData/Agenda%20Presentations/2026%20Presentations/8-19-26%20MISO%20Status%20Update.pdf), Aug 19, 2026.
- **Large load additions in expedited project reviews**: 100 MW, as of 2020 (approved). Large load additions supported by MISO's expedited transmission project reviews (EPR), by year. Source: [MISO, MISO Status Update to the Missouri Public Service Commission](https://psc.mo.gov/CMSInternetData/Agenda%20Presentations/2026%20Presentations/8-19-26%20MISO%20Status%20Update.pdf), Aug 19, 2026.

Entergy Louisiana, inside MISO, is building three gas plants certified to serve one Meta data center and has asked to build seven more for a second one. They are on Onsite Power Watch.

On the Power Map

## SI data centers inside MISO

Each card opens the site on the Power Map. Status and power are Epoch AI's, read November 10, 2026.

- [Colossus 2](https://siscto.si/power-map/colossus-2/): Memphis, Tennessee. 946 MW of IT power (Epoch AI, as of Jun 15, 2026).
- [Microsoft Fairwater Wisconsin](https://siscto.si/power-map/microsoft-fairwater-wisconsin/): Mount Pleasant, Wisconsin. 369 MW of IT power (Epoch AI, as of May 15, 2026).
- [Amazon Madison Mega Site](https://siscto.si/power-map/amazon-madison-mega-site/): Canton, Mississippi. 284 MW of IT power (Epoch AI, as of Jun 4, 2026).
- [Google Council Bluffs (East)](https://siscto.si/power-map/google-council-bluffs-east/): Council Bluffs, Iowa. 237 MW of IT power (Epoch AI, as of Jul 7, 2026).
- [Amazon Ridgeland](https://siscto.si/power-map/amazon-ridgeland/): Ridgeland, Mississippi. 228 MW of IT power (Epoch AI, as of May 15, 2026).
- [Microsoft Project Osmium](https://siscto.si/power-map/microsoft-project-osmium/): Cumming, Iowa. 190 MW of IT power (Epoch AI, as of Jun 16, 2026).
- [Meta Jeffersonville](https://siscto.si/power-map/meta-jeffersonville/): Jeffersonville, Indiana. 178 MW of IT power (Epoch AI, as of Jun 4, 2026).
- [Meta Rosemount](https://siscto.si/power-map/meta-rosemount/): Rosemount, Minnesota. 178 MW of IT power (Epoch AI, as of Jun 19, 2026).
- [CoreWeave Ellendale ND](https://siscto.si/power-map/coreweave-ellendale-nd/): Ellendale, North Dakota. 68 MW of IT power (Epoch AI, as of Jun 30, 2026).
- [Google Cedar Rapids](https://siscto.si/power-map/google-cedar-rapids/): Cedar Rapids, Iowa. No building running yet (Epoch AI, as of Apr 16, 2026).
- [Meta Hyperion](https://siscto.si/power-map/meta-hyperion/): Holly Ridge, Louisiana. No building running yet (Epoch AI, as of Apr 19, 2026).
- [OpenAI Stargate Michigan](https://siscto.si/power-map/openai-stargate-michigan/): Benton, Michigan. No building running yet (Epoch AI, as of Mar 12, 2026).
- [OpenAI Stargate Milam](https://siscto.si/power-map/openai-stargate-milam/): Burlington, Texas. No building running yet (Epoch AI, as of Mar 23, 2026).
- [OpenAI Stargate Wisconsin](https://siscto.si/power-map/openai-stargate-wisconsin/): Port Washington, Wisconsin. No building running yet (Epoch AI, as of Jul 24, 2026).
- [QTS Cedar Rapids](https://siscto.si/power-map/qts-cedar-rapids/): Cedar Rapids, Iowa. No building running yet (Epoch AI, as of Oct 23, 2026).

[The Power Map](https://siscto.si/power-map/)

15 Power Map sites fall inside this grid's area on the federal Control Areas map (HIFLD Open, year 2018 boundaries). 3 of them sit where the map draws two areas over the same spot; they are listed under each. A site's place on that map is a guide, not proof of which utility serves it.

Sources

## Where every figure comes from

Each source was opened and read on November 23, 2026.

validated May 15, 2020, read Nov 23, 2026

### U.S. Department of Homeland Security, HIFLD Open (public copy)

Control Areas (balancing authority areas), sourced from FERC 714, EIA 860 and EIA 861, year 2018

[Open the source](https://services5.arcgis.com/HDRa0B57OVrv2E1q/ArcGIS/rest/services/Control_Areas/FeatureServer/0)

Feb 19, 2026, read Nov 23, 2026

### Entergy

Annual report for 2025 (SEC Form 10-K)

[Open the source](https://www.sec.gov/Archives/edgar/data/65984/000006598426000174/etr-20251231.htm)

Aug 19, 2026, read Nov 23, 2026

### MISO

MISO Status Update to the Missouri Public Service Commission

[Open the source](https://psc.mo.gov/CMSInternetData/Agenda%20Presentations/2026%20Presentations/8-19-26%20MISO%20Status%20Update.pdf)

Nov 2, 2026, read Nov 23, 2026

### Entergy

Quarterly report for the quarter ended September 30, 2026 (SEC Form 10-Q)

[Open the source](https://www.sec.gov/Archives/edgar/data/65984/000006598426000325/etr-20260930.htm)

retrieved Nov 10, 2026

### Epoch AI

The Power Map's site list, towns, status and power come from Epoch AI's open data set of data centers, licensed CC BY 4.0.

[Open the source](https://epoch.ai/data/ai-data-centers)

Keep going

## The same grid, other records

Every page of the set reads a different public record.

### Power Map

Every SI data center public data can confirm, with its power.

### Gigawatt Ledger

What was announced against what is confirmed energized.

### Onsite Power Watch

The plants built to run data centers directly.

### Grid Watch

Live demand on the grids that host the most sites.

### Bill Watch

Home power prices in every state with a site.

Questions

## MISO, answered

The figures, the stages and the limits.

### How much power are data centers asking MISO for?

MISO counts the large loads its members connect through expedited transmission reviews. The yearly total went from 0.1 GW in 2020 to 9.7 GW in 2025, and MISO projected 26.4 GW for 2026 as of July 8, 2026: 17.8 GW already approved and 8.6 GW more proposed. Each figure on this page has its own definition and date; figures with different definitions are never added together.

### Is all of that going to be built?

No figure here says what will be built. Requests are what customers asked for; many requests are speculative, duplicated across grids or withdrawn. The stages on this page (asked for, in study, approved, under contract, running) are the source's own words.

### Which data centers are inside MISO?

The [Power Map](https://siscto.si/power-map/) lists 15 sites inside MISO's area on the federal Control Areas map. See the list below; each links to its page.

### Where do the figures come from?

From the grid operator's own board decks, filings and reports, each read on November 23, 2026. The links are on every figure.

### How hard is MISO running right now?

[Grid Watch](https://siscto.si/grid-watch/#miso) shows MISO's demand hour by hour from the EIA, against its own forecast and its record.

Join the takeover

## Read the queue with us

Open a source, check a figure yourself and bring what you find to the $SIS Telegram.

[Buy $SIS](https://pump.fun/coin/FdKdpz11GsTofLaNiddrhxrsE4APZYSSfLFqQ9YKpump)

[Join the Telegram](https://t.me/sisctotg)

[Follow on X](https://x.com/entersiscto)

[Swap on Jupiter](https://jup.ag/swap/SOL-FdKdpz11GsTofLaNiddrhxrsE4APZYSSfLFqQ9YKpump)