# Southeast data center power requests: The Queue

> How much power data centers ask of Southeast (The Southeast, where utilities run their own grids), every figure with its own definition, date and source.

Source: https://siscto.si/queue/southeast/
Updated: 2026-11-26

1. [Home](https://siscto.si/)
2. [The Queue](https://siscto.si/queue/)
3. Southeast

The Queue · Southeast

# The queue at Southeast

The Southeast has no market grid operator: each big utility plans and runs its own system. Southern Company, the parent of Georgia Power and Alabama Power, reported in November 2026 about 16 GW of large load contracts reviewed by its state commissions since 2023 and about 4 GW more agreed and under review.

Figures on file
:   [2](https://siscto.si/queue/southeast/#figures)

Newest figure
:   [Sep 30, 2026](https://siscto.si/queue/southeast/#figures)

Power Map sites inside
:   [9](https://siscto.si/queue/southeast/#sites)

Grid Watch
:   [Not yet](https://siscto.si/grid-watch/)

Over time

## Where the source repeats

This grid has no measure that its source repeats three times yet, so there is no line. Every number keeps its own definition, date and source. Figures with different definitions are never added together, and a chart joins only the same measure from the same source.

The figures below are each a single reading. A line appears here once the same source gives the same measure three times.

Every figure

## Southeast, figure by figure

Newest first. Each card opens its source document.

- **Southern Company: contracts agreed, under commission review**: about 4 GW, as of September 30, 2026 (under contract). Additional contracts agreed with customers and still subject to review by the state commission. Southern Company itself calls the two together about 20 GW of Large Load Contracts, ramping up through 2029. Source: [Southern Company, Quarterly report for the quarter ended September 30, 2026 (SEC Form 10-Q)](https://www.sec.gov/Archives/edgar/data/92122/000009212226000069/so-20260930.htm), Nov 5, 2026.
- **Southern Company: large load contracts reviewed by the state commissions**: about 16 GW, as of September 30, 2026 (under contract). Contracts since 2023 with new data centers and other large load customers, each over 100 MW, reviewed by the applicable state public service commission. Source: [Southern Company, Quarterly report for the quarter ended September 30, 2026 (SEC Form 10-Q)](https://www.sec.gov/Archives/edgar/data/92122/000009212226000069/so-20260930.htm), Nov 5, 2026.

On the Power Map

## SI data centers inside Southeast

Each card opens the site on the Power Map. Status and power are Epoch AI's, read November 10, 2026.

- [Microsoft Fairwater Atlanta](https://siscto.si/power-map/microsoft-fairwater-atlanta/): Fayetteville, Georgia. 636 MW of IT power (Epoch AI, as of Jun 14, 2026).
- [Colossus 1](https://siscto.si/power-map/colossus-1/): Memphis, Tennessee. 340 MW of IT power (Epoch AI, as of Jun 15, 2026).
- [Meta Montgomery](https://siscto.si/power-map/meta-montgomery/): Montgomery, Alabama. 153 MW of IT power (Epoch AI, as of Jun 18, 2026).
- [Meta Huntsville](https://siscto.si/power-map/meta-huntsville/): Huntsville, Alabama. 146 MW of IT power (Epoch AI, as of Jun 2, 2026).
- [Meta Aiken](https://siscto.si/power-map/meta-aiken/): Aiken, South Carolina. 129 MW of IT power (Epoch AI, as of Nov 5, 2026).
- [Meta Gallatin](https://siscto.si/power-map/meta-gallatin/): Gallatin, Tennessee. 87 MW of IT power (Epoch AI, as of Aug 24, 2026).
- [CoreWeave Marble NC](https://siscto.si/power-map/coreweave-marble-nc/): Marble, North Carolina. 65 MW of IT power (Epoch AI, as of May 6, 2026).
- [CoreWeave Dalton 1 & 2](https://siscto.si/power-map/coreweave-dalton-1-and-2/): Dalton, Georgia. 28 MW of IT power (Epoch AI, as of Feb 20, 2026).
- [xAI QTS Atlanta](https://siscto.si/power-map/xai-qts-atlanta/): Atlanta, Georgia. 17.3 MW of IT power (Epoch AI, as of Jul 10, 2026).

[The Power Map](https://siscto.si/power-map/)

9 Power Map sites fall inside this grid's area on the federal Control Areas map (HIFLD Open, year 2018 boundaries). 2 of them sit where the map draws two areas over the same spot; they are listed under each. A site's place on that map is a guide, not proof of which utility serves it.

Sources

## Where every figure comes from

Each source was opened and read on November 23, 2026.

validated May 15, 2020, read Nov 23, 2026

### U.S. Department of Homeland Security, HIFLD Open (public copy)

Control Areas (balancing authority areas), sourced from FERC 714, EIA 860 and EIA 861, year 2018

[Open the source](https://services5.arcgis.com/HDRa0B57OVrv2E1q/ArcGIS/rest/services/Control_Areas/FeatureServer/0)

Nov 5, 2026, read Nov 23, 2026

### Southern Company

Quarterly report for the quarter ended September 30, 2026 (SEC Form 10-Q)

[Open the source](https://www.sec.gov/Archives/edgar/data/92122/000009212226000069/so-20260930.htm)

retrieved Nov 10, 2026

### Epoch AI

The Power Map's site list, towns, status and power come from Epoch AI's open data set of data centers, licensed CC BY 4.0.

[Open the source](https://epoch.ai/data/ai-data-centers)

Keep going

## The same grid, other records

Every page of the set reads a different public record.

### Power Map

Every SI data center public data can confirm, with its power.

### Gigawatt Ledger

What was announced against what is confirmed energized.

### Onsite Power Watch

The plants built to run data centers directly.

### Grid Watch

Live demand on the grids that host the most sites.

### Bill Watch

Home power prices in every state with a site.

Questions

## Southeast, answered

The figures, the stages and the limits.

### How much power are data centers asking Southeast for?

The Southeast has no market grid operator: each big utility plans and runs its own system. Southern Company, the parent of Georgia Power and Alabama Power, reported in November 2026 about 16 GW of large load contracts reviewed by its state commissions since 2023 and about 4 GW more agreed and under review. Each figure on this page has its own definition and date; figures with different definitions are never added together.

### Is all of that going to be built?

No figure here says what will be built. Requests are what customers asked for; many requests are speculative, duplicated across grids or withdrawn. The stages on this page (asked for, in study, approved, under contract, running) are the source's own words.

### Which data centers are inside Southeast?

The [Power Map](https://siscto.si/power-map/) lists 9 sites inside Southeast's area on the federal Control Areas map. See the list below; each links to its page.

### Where do the figures come from?

From the grid operator's own board decks, filings and reports and the utilities' own filings with the SEC, each read on November 23, 2026. The links are on every figure.

Join the takeover

## Read the queue with us

Open a source, check a figure yourself and bring what you find to the $SIS Telegram.

[Buy $SIS](https://pump.fun/coin/FdKdpz11GsTofLaNiddrhxrsE4APZYSSfLFqQ9YKpump)

[Join the Telegram](https://t.me/sisctotg)

[Follow on X](https://x.com/entersiscto)

[Swap on Jupiter](https://jup.ag/swap/SOL-FdKdpz11GsTofLaNiddrhxrsE4APZYSSfLFqQ9YKpump)