# The queue at SPP

SPP studies large loads through its High Impact Large Load (HILL) process. The only count found for this page is SPP's own for Missouri: 11 requests for 3,871 MW, of which 568 MW had reached a service agreement by August 2026. SPP wide totals are on the monthly recheck list.

Figures on file
:   [2](https://siscto.si/queue/spp/#figures)

Newest figure
:   [Aug 19, 2026](https://siscto.si/queue/spp/#figures)

Power Map sites inside
:   [10](https://siscto.si/queue/spp/#sites)

Live on Grid Watch
:   [Yes](https://siscto.si/grid-watch/#spp)

Over time

## Where the source repeats

This grid has no measure that its source repeats three times yet, so there is no line. Every number keeps its own definition, date and source. Figures with different definitions are never added together, and a chart joins only the same measure from the same source.

The figures below are each a single reading. A line appears here once the same source gives the same measure three times.

Every figure

## SPP, figure by figure

Newest first. Each card opens its source document.

- **Added to a service agreement, Missouri**: 568 MW, as of August 19, 2026 (approved). Two of those requests, added to a service agreement. Another 725 MW (five requests) was in study and 2,578 MW (four requests) potential or pending study. Source: [SPP, SPP Status Update to the Missouri Public Service Commission](https://psc.mo.gov/CMSInternetData/Agenda%20Presentations/2026%20Presentations/8-19-26%20SPP%20Status%20Update.pdf), Aug 19, 2026.
- **HILL requests in Missouri**: 3,871 MW, as of August 19, 2026 (asked for). Total load of the 11 High Impact Large Load requests in SPP's Missouri area (7 in one path, 4 in the other). Missouri only, not all of SPP. Source: [SPP, SPP Status Update to the Missouri Public Service Commission](https://psc.mo.gov/CMSInternetData/Agenda%20Presentations/2026%20Presentations/8-19-26%20SPP%20Status%20Update.pdf), Aug 19, 2026.

SPP's own Missouri detail lists 650 MW of the requests as data center load and 1,968 MW as load whose use was not disclosed.

Utilities

## The utilities in this grid

A utility's own count of the load it has agreed to serve, from its own filings.

### American Electric Power (AEP)

AEP reports, each quarter, the new load backed by signed customer agreements across its companies in PJM, SPP and ERCOT. The count went from 24 GW in July 2025 to 69 GW through 2030 in July 2026, and to 84 GW by 2031 in October 2026.

- **Contracted load by 2031**: 84 GW, as of October 28, 2026 (under contract). After 15 GW of new load commitments in the third quarter of 2026. AEP moved the horizon to 2031, so this figure is kept off the 2030 line. Source: [AEP, Third-quarter 2026 earnings release (SEC Form 8-K, exhibit 99.1)](https://www.sec.gov/Archives/edgar/data/4904/000000490426000069/a3q20268kpressreleaseex991.htm), Oct 28, 2026.
- **Contracted load growth through 2030**: 69 GW, as of July 30, 2026 (under contract). After 6 GW more of signed load agreements in the second quarter of 2026, mainly in Texas. Source: [AEP, Second-quarter 2026 earnings release (SEC Form 8-K, exhibit 99.1)](https://www.sec.gov/Archives/edgar/data/4904/000000490426000055/a2q20268kpressreleaseex991.htm), Jul 30, 2026.
- **New load by 2030 under signed agreements**: 63 GW, as of May 5, 2026 (under contract). After 7 GW of new load agreements signed in the first quarter of 2026. AEP Texas accounts for 41 GW of the commitments. Source: [AEP, First-quarter 2026 earnings release (SEC Form 8-K, exhibit 99.1)](https://www.sec.gov/Archives/edgar/data/4904/000000490426000031/a1q20268kpressreleaseex991.htm), May 5, 2026.
- **New load by 2030 under signed agreements**: 56 GW, as of February 12, 2026 (under contract). Incremental load by 2030, all backed by signed agreements. AEP Texas alone rose from 13 GW to 36 GW, backed by signed letters of agreement. Source: [AEP, Fourth-quarter and full-year 2025 earnings release (SEC Form 8-K, exhibit 99.1)](https://www.sec.gov/Archives/edgar/data/4904/000000490426000011/a4q20258kpressreleaseex991.htm), Feb 12, 2026.
- **New load by 2030 under customer agreements**: 28 GW, as of October 29, 2025 (under contract). Load additions by 2030 backed by electric service agreements or letters of agreement, supported by an additional 190 GW of load requests. Source: [AEP, Third-quarter 2025 earnings release (SEC Form 8-K, exhibit 99.1)](https://www.sec.gov/Archives/edgar/data/4904/000000490425000169/a3q20258kpressreleaseex991.htm), Oct 29, 2025.
- **New load by 2030 under customer agreements**: 24 GW, as of July 30, 2025 (under contract). Incremental load by 2030 under customer agreements with firm financial commitments, mainly in Indiana, Ohio and Texas. AEP also cited more than 190 GW of load requests at various stages. Source: [AEP, Second-quarter 2025 earnings release (SEC Form 8-K, exhibit 99.1)](https://www.sec.gov/Archives/edgar/data/4904/000000490425000139/a2q20258kpressreleaseex991.htm), Jul 30, 2025.

On the Power Map

## SI data centers inside SPP

Each card opens the site on the Power Map. Status and power are Epoch AI's, read November 10, 2026.

- [Google Pryor (North)](https://siscto.si/power-map/google-pryor-north/): Pryor, Oklahoma. 368 MW of IT power (Epoch AI, as of Sep 6, 2026).
- [Google Council Bluffs (East)](https://siscto.si/power-map/google-council-bluffs-east/): Council Bluffs, Iowa. 237 MW of IT power (Epoch AI, as of Jul 7, 2026).
- [Google Omaha](https://siscto.si/power-map/google-omaha/): Omaha, Nebraska. 237 MW of IT power (Epoch AI, as of Jun 30, 2026).
- [Google Papillion](https://siscto.si/power-map/google-papillion/): Papillion, Nebraska. 237 MW of IT power (Epoch AI, as of May 4, 2026).
- [Google Lincoln](https://siscto.si/power-map/google-lincoln/): Lincoln, Nebraska. 141 MW of IT power (Epoch AI, as of May 12, 2026).
- [Google Kansas City East](https://siscto.si/power-map/google-kansas-city-east/): Kansas City, Missouri. 105 MW of IT power (Epoch AI, as of Aug 1, 2026).
- [Meta Sarpy](https://siscto.si/power-map/meta-sarpy/): Springfield, Nebraska. 80 MW of IT power (Epoch AI, as of Aug 2, 2026).
- [CoreWeave Ellendale ND](https://siscto.si/power-map/coreweave-ellendale-nd/): Ellendale, North Dakota. 68 MW of IT power (Epoch AI, as of Jun 30, 2026).
- [CoreWeave Muskogee OK](https://siscto.si/power-map/coreweave-muskogee-ok/): Muskogee, Oklahoma. No building running yet (Epoch AI, as of Jun 13, 2026).
- [Goodnight](https://siscto.si/power-map/goodnight/): Claude, Texas. No building running yet (Epoch AI, as of Apr 16, 2026).

[The Power Map](https://siscto.si/power-map/)

10 Power Map sites fall inside this grid's area on the federal Control Areas map (HIFLD Open, year 2018 boundaries). 4 of them sit where the map draws two areas over the same spot; they are listed under each. A site's place on that map is a guide, not proof of which utility serves it.

Sources

## Where every figure comes from

Each source was opened and read on November 23, 2026.

validated May 15, 2020, read Nov 23, 2026

### U.S. Department of Homeland Security, HIFLD Open (public copy)

Control Areas (balancing authority areas), sourced from FERC 714, EIA 860 and EIA 861, year 2018

[Open the source](https://services5.arcgis.com/HDRa0B57OVrv2E1q/ArcGIS/rest/services/Control_Areas/FeatureServer/0)

Jul 30, 2025, read Nov 23, 2026

### AEP

Second-quarter 2025 earnings release (SEC Form 8-K, exhibit 99.1)

[Open the source](https://www.sec.gov/Archives/edgar/data/4904/000000490425000139/a2q20258kpressreleaseex991.htm)

Oct 29, 2025, read Nov 23, 2026

### AEP

Third-quarter 2025 earnings release (SEC Form 8-K, exhibit 99.1)

[Open the source](https://www.sec.gov/Archives/edgar/data/4904/000000490425000169/a3q20258kpressreleaseex991.htm)

Feb 12, 2026, read Nov 23, 2026

### AEP

Fourth-quarter and full-year 2025 earnings release (SEC Form 8-K, exhibit 99.1)

[Open the source](https://www.sec.gov/Archives/edgar/data/4904/000000490426000011/a4q20258kpressreleaseex991.htm)

May 5, 2026, read Nov 23, 2026

### AEP

First-quarter 2026 earnings release (SEC Form 8-K, exhibit 99.1)

[Open the source](https://www.sec.gov/Archives/edgar/data/4904/000000490426000031/a1q20268kpressreleaseex991.htm)

Jul 30, 2026, read Nov 23, 2026

### AEP

Second-quarter 2026 earnings release (SEC Form 8-K, exhibit 99.1)

[Open the source](https://www.sec.gov/Archives/edgar/data/4904/000000490426000055/a2q20268kpressreleaseex991.htm)

Aug 19, 2026, read Nov 23, 2026

### SPP

SPP Status Update to the Missouri Public Service Commission

[Open the source](https://psc.mo.gov/CMSInternetData/Agenda%20Presentations/2026%20Presentations/8-19-26%20SPP%20Status%20Update.pdf)

Oct 28, 2026, read Nov 23, 2026

### AEP

Third-quarter 2026 earnings release (SEC Form 8-K, exhibit 99.1)

[Open the source](https://www.sec.gov/Archives/edgar/data/4904/000000490426000069/a3q20268kpressreleaseex991.htm)

retrieved Nov 10, 2026

### Epoch AI

The Power Map's site list, towns, status and power come from Epoch AI's open data set of data centers, licensed CC BY 4.0.

[Open the source](https://epoch.ai/data/ai-data-centers)

Keep going

## The same grid, other records

Every page of the set reads a different public record.

### Power Map

Every SI data center public data can confirm, with its power.

### Gigawatt Ledger

What was announced against what is confirmed energized.

### Onsite Power Watch

The plants built to run data centers directly.

### Grid Watch

Live demand on the grids that host the most sites.

### Bill Watch

Home power prices in every state with a site.

Questions

## SPP, answered

The figures, the stages and the limits.

### How much power are data centers asking SPP for?

SPP studies large loads through its High Impact Large Load (HILL) process. The only count found for this page is SPP's own for Missouri: 11 requests for 3,871 MW, of which 568 MW had reached a service agreement by August 2026. SPP wide totals are on the monthly recheck list. Each figure on this page has its own definition and date; figures with different definitions are never added together.

### Is all of that going to be built?

No figure here says what will be built. Requests are what customers asked for; many requests are speculative, duplicated across grids or withdrawn. The stages on this page (asked for, in study, approved, under contract, running) are the source's own words.

### Which data centers are inside SPP?

The [Power Map](https://siscto.si/power-map/) lists 10 sites inside SPP's area on the federal Control Areas map. See the list below; each links to its page.

### Where do the figures come from?

From the grid operator's own board decks, filings and reports and the utilities' own filings with the SEC, each read on November 23, 2026. The links are on every figure.

### How hard is SPP running right now?

[Grid Watch](https://siscto.si/grid-watch/#spp) shows SPP's demand hour by hour from the EIA, against its own forecast and its record.

Join the takeover

## Read the queue with us

Open a source, check a figure yourself and bring what you find to the $SIS Telegram.

[Buy $SIS](https://pump.fun/coin/FdKdpz11GsTofLaNiddrhxrsE4APZYSSfLFqQ9YKpump)