How the Ledger counts
The Gigawatt Ledger counts two things for each SI compute project: the power its operator announced and the power public evidence shows running. This page is the method, dated November 11, 2026. In short: one stated figure for each project, never an "up to" figure, set against dated evidence of what is energized, and shown as a range wherever an announcement does not say what its number measures.
- Dated
- Nov 11, 2026
- Projects
- 24
- Announcements
- 44
- Source links
- 37
Announced
What counts as announced
A row is one public announcement that was fetched and can be linked.
Each row records who made the announcement, what it says, where the project is, the power or capacity it states in the unit the source uses, the promised date, the date of the announcement and its link. A page that carries no date, such as a developer's campus page, is dated with the day it was read and marked as undated.
Megawatts and gigawatts are converted only when the source itself gives power. Chips, dollars and square feet are quoted as they are and never turned into power.
For the total, each project counts once, with the figure its operator, a partner, a regulator, a utility or a public filing states as the project's planned or contracted power or capacity. Where two such figures exist, the newer one wins.
Left out of the total, and shown on the project page: figures given as "up to", "potential", "ambition" or "can scale to"; figures that cover several sites together; and figures that only the press reports. A company's own words quoted by the press count as the company's words.
Built
What counts as confirmed energized
Power that dated public evidence shows in operation today.
The main evidence is Epoch AI's public tracker "AI data centers" (CC BY 4.0), the data behind the Power Map. Epoch AI dates each building that starts operating from satellite images, permits and company statements, and estimates the IT power running and the power of the whole facility on that date. The Ledger takes the latest dated entry for each site and shows its date. Projections are never counted.
A company statement, a utility statement or a public filing that states live power is used as well, with its link. Where two pieces of evidence disagree, both are shown and the range covers them. Where Compute Watch follows a site, the newest clear satellite pass is on the project page.
Confirmed power never counts for more than the project's own announced figure, so one project that ran ahead cannot hide another that has not started.
The range
Why the result is a range
Announcements rarely say what their number measures.
A campus announced at 1.2 GW may mean the power for the computers, called IT load, or the power the whole site draws, cooling and conversion included. The difference is about a quarter to a half.
Where the announcement states IT load, the Ledger compares it with the IT load running. Where it states total power, it is compared with the power of the whole facility. Where it says neither, the low end is the IT load running and the high end is the whole facility, and both are shown. The percentage is given only because both totals rest on stated power figures; a project without one shows "not stated", and a site with no dated evidence of operation shows "not confirmed".
The states
Six states, one for each project
A state is worked out from the same data, by rule, and the project page states the evidence.
- Announced
A public announcement exists and no public evidence of construction has been read.
- Under construction
Work on the ground is confirmed and nothing is confirmed as running yet.
- Partly energized
Part of the announced power is confirmed as running.
- Energized
Public evidence puts the running power at 95% or more of the announced figure, or shows every building running where no figure was stated.
- Delayed
Nothing is running, a promised date has passed, and a linked source shows it was not met.
- Cancelled
A linked source says the project was dropped.
Corrections and limits
What the Ledger does not know
It is as good as the public record, and it says where that ends.
The Ledger covers projects that are both announced with a source that could be fetched and tracked on the ground by Epoch AI. Projects with no evidence source yet are not listed, so the totals are a floor for what was announced, not the whole market.
Some sources could not be read from the build and are not used: pages that refuse automated readers or sit behind a paywall. A fact that rests only on such a page is left out.
Anyone with an SI Passport can file a correction on a project page. A correction needs a link to a public source, the team reads it before anything changes, and approved corrections stay on the page with their date. The page shows whether the filer carries an Org check, and an organization correcting its own project is labeled as such.