75%
of US adults say their home energy costs went up in recent years, and 43% of them call data centers using more energy a major reason.
Pew Research Center, May 6, 2026, survey of 3,524 adults, March 16 to 22, 2026
SI Next Door · United States
SI Next Door shows what is being built near you. Enter a US ZIP code to see the SI data centers within reach, how much power they run, what is under construction or proposed, hearings neighbors reported, your state's average home power price and what published sources say data center demand adds to power costs. The Power Map tracks 77 US sites in 29 states.
Near you
Under construction or proposed
Hearings and votes
Sightings from neighbors
Loading the price series.
Alerts and sharing
Get a Telegram message when the team approves a hearing date or a proposed build within the distance you picked, or the Power Map adds a site there. The bot keeps a point rounded to about 10 km, never your ZIP code.
The map
Every US site on the Power Map, colored by its status and sized by the IT power running. Your ZIP code shows as a ring once you look it up.
The world on the Power MapDrawing the map
Sites: the Power Map, from Epoch AI's public tracker (CC BY 4.0), read November 10, 2026. Map: US Census Bureau boundaries via us-atlas, Albers USA.
Why it matters
Three public records from 2026, each with its link and date. They describe the country and one grid, not any single home.
75%
of US adults say their home energy costs went up in recent years, and 43% of them call data centers using more energy a major reason.
Pew Research Center, May 6, 2026, survey of 3,524 adults, March 16 to 22, 2026
76%
rise in the total cost of wholesale power in PJM, home to more than 67 million people, in the first quarter of 2026 against a year before, per its independent market monitor.
E&E News, May 15, 2026
$68 B
of data center projects blocked or delayed by local opposition from April to June 2026, according to Data Center Watch.
Tom's Hardware, Sep 21, 2026, citing Bloomberg and Data Center Watch
By state
Each state has its own page: its SI data centers, its average home price by month from EIA through August 2026, its grid operators and the sourced bill facts for them.
Prices: average residential price in cents per kWh, August 2026, U.S. Energy Information Administration, published October 22, 2026.
Neighbor reports
A sighting, a hearing or vote date, or a proposed build. Nothing shows until the team has read it, and a hearing or a proposed build needs a public source.
Use your SI Passport: a wallet signature, which is free and never a transaction, or a passkey as a Guest.
Latest approved
Plain words
It puts public records side by side. It does not judge any company, project or person.
How it worksQuestions
Where the data comes from, what stays private, and how reports and alerts work.
A free lookup for the United States: enter a ZIP code and see the SI data centers on the Power Map near you with their distance, power and status, what is under construction or proposed, any hearing or vote neighbors reported, your state's average home power price and its trend, and what published sources say data center demand adds to power costs in your grid region.
No. The page loads the public file of ZIP code areas that start with the same two digits as yours from siscto.si, finds your area and works out every distance in your browser. Our API on sicto.si only ever hears a state for prices and reports, and, if you choose Telegram alerts, a point rounded to about 10 km. Nothing stores your ZIP code.
The data centers are the Power Map's, from Epoch AI's public tracker, with the Gigawatt Ledger's announced and confirmed figures where a site is in it. ZIP code areas come from the US Census Bureau. Prices are the U.S. Energy Information Administration's average residential price by state and month. Every bill fact names its source and its date. The method page lists them all.
Only what a record shows: sites the Power Map lists as under construction, and neighbor reports of a proposed data center that the team approved after reading the public source filed with them, such as a planning agenda, a zoning notice or a utility filing. Nothing is added from rumor, and the list starts with what is real.
This page does not say so for any one home. It shows your state's average home price over time and, where a market monitor, a state commission or a utility filing has published a number for what data center demand adds in your grid region, that number with its link and date. Where none has been published and verified, it shows none.
Sign in with your SI Passport, a wallet signature that never moves anything or a passkey as a Guest, and file a sighting with an optional photo, a hearing or vote date, or a proposed build. A hearing or a proposed build needs a link to a public source. The team reads it before it shows, and every approved report is sealed on Solana through SI MIND's hourly Proof of Mind.
Look up a ZIP code, pick a distance and press Follow on Telegram. The Launch Desk bot opens, and once you press Start it messages you when the team approves a hearing date or a proposed build near that area, or the Power Map adds a site there. It keeps only the chat, a rounded point and the distance. Send /stop to end everything.
The ZIP code areas, the price series and the grid regions used here are American public data, so SI Next Door starts with the 50 states and DC. Puerto Rico and the other territories have ZIP code areas but no price series or grid region here yet. The page is built so other countries can be added later.
No. $SIS is a community meme token with no affiliation with, or endorsement from, any utility, grid operator, data center company or agency named here. SI Next Door shows public records and says what they show.
Join the takeover
Look up your ZIP code, follow it on Telegram and bring what you find to the $SIS Telegram.