- PO Box ZIP codes
- PO Box and single building ZIP codes have no Census area, so the page says so and asks for the ZIP code of a street address, naming the state when every area with the same first three digits is in one.
- Distance
- The great circle distance on a sphere of 6,371.0088 km, the Earth's mean radius, from the Census point of the ZIP code area to each site's coordinates. Shown in miles and kilometers.
- Data centers
- The Power Map: 77 US sites from Epoch AI's public tracker (CC BY 4.0), read November 10, 2026, with status, IT power running and Epoch AI's planned figure where it states one.
- Built against announced
- The Gigawatt Ledger as of November 11, 2026, for the sites in its 24 projects.
- Under construction or proposed
- Power Map sites under construction, and neighbor reports of a proposed build that the team approved after reading the public source filed with them. Nothing else.
- Prices
- The U.S. Energy Information Administration's average retail price of electricity to residential customers, by state and month (series ELEC.PRICE.<state>-RES.M), through August 2026, published October 22, 2026, copied from the EIA bulk file. The live page asks the EIA API v2 (electricity/retail-sales) for newer months.
- Price change
- The latest month against the same month one year and five years before, so the seasons do not skew it.
- Grid operators
- Each ISO or RTO from its own published footprint: PJM, Territory Served, Wikipedia, Midcontinent Independent System Operator (revision of Sep 26, 2026), Wikipedia, Southwest Power Pool (revision of Aug 17, 2026), ERCOT, About, California ISO, About, NYISO, What we do, ISO New England, About, Wikipedia, Regional transmission organization (North America) (revision of Oct 26, 2026), read November 17, 2026. "All or part" means the operator covers some of the state, not necessarily your town.
- Bill facts
- Only figures that a market monitor, a state commission or a utility filing published, quoted with the link and the date, and shown for the grid region they cover: PJM's independent market monitor found that in the first nine months of 2026 the total cost of wholesale power rose by $9.95 per MWh (9.8%), from $101.66 to $111.61, as a result of including data center load in the capacity market. That is about 1 cent per kWh of wholesale power; how much of it reaches a home bill depends on each utility and state. Monitoring Analytics, Market Monitor Report to the PJM Members Committee, Oct 28, 2026. The total cost of wholesale power in PJM was $136.53 per MWh in the first quarter of 2026, up from $77.78 a year before, almost 76%, per the market monitor. The report put the data center load in PJM's last two capacity auctions at a $13 billion cost increase for customers. PJM covers more than 67 million people in all or part of 13 states and DC. E&E News, "Data centers drive 76% surge in PJM power prices", May 15, 2026. No estimate of our own.
- Neighbor reports
- Filed with an SI Passport (a wallet signature that is never a transaction, or a Guest Passport made with a passkey). A hearing or a proposed build needs a public source link. Photos are re-encoded on the server with no metadata. The team approves or rejects each one; only approved reports show. Each approved report gets a fingerprint, the SHA-256 of its record, sealed on Solana through SI MIND's hourly Proof of Mind.
- Alerts
- The Launch Desk bot on Telegram, only for people who pressed Start. A follow keeps the chat id, a point rounded to 0.1 degree (about 10 km) and the distance, never a ZIP code or a name. Messages are queued and spread out within Telegram's limits. /stop deletes everything.
- Privacy
- Your ZIP code never leaves your browser except as the two digit file it loads from siscto.si. Reports keep a county, a state and a point rounded to about 5 km.