Power Map · Operating, expanding
Google Lincoln, Lincoln
Google Lincoln is an SI data center in Lincoln, Nebraska, United States, owned by Google. Epoch AI estimates its IT power at 141 MW as of May 12, 2026, with 1 building operating, and projects 283 MW by October 1, 2027. Its public timeline starts on July 1, 2023.
- IT power
- 141 MWMay 12, 2026
- Facility power
- 170 MW
- Status
- Operating, expanding
- Buildings operating
- 1
Where it is
The site and its facts
Google Lincoln on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Lincoln, Nebraska, United States
- Address
- 5475 Cloud Ct, Lincoln, NE 68514
- Coordinates
- 40.9070° N, 96.6536° W
- Owner
- Chips
- TPU v6e, TPU v7
- Compute
- About 197,575 H100 equivalentsEpoch AI estimate, May 12, 2026
- Projected
- 283 MW IT power by October 1, 2027Epoch AI projection, not a fact yet
Heat Watch
Google Lincoln: heat seen from space
Over the last three summers NASA's MODIS read the ground here -0.7 °C against the land 5 to 10 km around it by day.
Lights On
Google Lincoln: light at night
NASA's night imagery read 25.3 of 100 over this site in October 2026, against 7.7 in October 2018, the first month read. Against a year before: +6.0 points. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on Google Lincoln, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
Land clearing begins for the site
No IT power yet0 operating
Building 1 looks mostly complete: the large items like generators and substation are done. It is just missing 2 more cooling towers (4 fans). They just seem to be paving and setting up the secondary equipment so it is probably a few months away from operation. Building 2 foundation has been laid.
No IT power yet0 operating
Building 1 operational. This is based on the fact that is no more visible equipment or construction around the building, and based on previous imagery and when construction started on the last pieces of equipment (fans). Building 2's roof is complete, with generator construction more than halfway complete and cooling construction beginning. Electrical equipment on the side of Building 2 is also around halfway complete.
141 MW1 operating
Building 2 operational. Estimated based on the construction timeline for Building 1, specifically the time to operational since the roof was complete and the time to operational since the foundation work began.
283 MW2 operating
Adopt a site
Watch Google Lincoln
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- Army corps land use application with a useful construction plan diagram, split across 7 phases
- DCD article on the start of site construction
- Rezoning approval, stating 75 ft building height
- Epoch AI, "AI data centers", the record for Google Lincoln (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
48 km away
Meta Sarpy
Springfield, Nebraska, United States
80 MW IT power
49 km away
Google Papillion
Papillion, Nebraska, United States
237 MW IT power
68 km away
Google Omaha
Omaha, Nebraska, United States
237 MW IT power
78 km away
Google Council Bluffs (East)
Council Bluffs, Iowa, United States
237 MW IT power
Questions
Google Lincoln, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is Google Lincoln?
Google Lincoln is in Lincoln, Nebraska, United States, at 5475 Cloud Ct, Lincoln, NE 68514. Epoch AI publishes its coordinates as 40.9070, -96.6536.
Who owns Google Lincoln?
Epoch AI lists Google as its owner.
How much power does Google Lincoln use?
Epoch AI estimates its IT power at 141 MW as of May 12, 2026, and its total facility power at 170 MW. It projects 283 MW of IT power by October 1, 2027.
Is Google Lincoln operating?
Yes, and it is growing. Epoch AI counts 1 building operating as of May 12, 2026, with more capacity on its timeline.
Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).