1. Home
  2. Power Map
  3. CoreWeave Ellendale ND

Power Map · Operating, expanding

CoreWeave Ellendale ND, Ellendale

CoreWeave Ellendale ND is an SI data center in Ellendale, North Dakota, United States, owned by CoreWeave and used by OpenAI (Epoch AI rates this speculative). Epoch AI estimates its IT power at 68 MW as of June 30, 2026, with 1 building operating, and projects 400 MW by June 1, 2027. Its public timeline starts on October 31, 2023.

IT power
68 MWJun 30, 2026
Facility power
88 MW
Status
Operating, expanding
Buildings operating
1

Where it is

The site and its facts

CoreWeave Ellendale ND on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Ellendale, North Dakota, United StatesOpen in OpenStreetMap
Place
Ellendale, North Dakota, United States
Address
9685 87th Ave SE, Ellendale, ND 58436
Coordinates
46.0153° N, 98.5725° W
Owner
CoreWeave
Users
OpenAI (Epoch AI rates this speculative)
Chips
B200
Compute
About 93,482 H100 equivalentsEpoch AI estimate, Jun 30, 2026
Projected
400 MW IT power by June 1, 2027Epoch AI projection, not a fact yet

The Gigawatt Ledger · Partly energized

Polaris Forge 1: announced against built

400 MW was announced for this project. Public evidence puts 68 to 175 MW in operation as of June 30, 2026, against 400 MW announced: 17% to 44%. The range covers every figure listed below.

Heat Watch

CoreWeave Ellendale ND: heat seen from space

Over the last three summers NASA's MODIS read the ground here +0.0 °C against the land 5 to 10 km around it by day.

Lights On

CoreWeave Ellendale ND: light at night

NASA's night imagery read 26.0 of 100 over this site in October 2026, against 0.2 in October 2018, the first month read. Against a year before: +9.4 points. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on CoreWeave Ellendale ND, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Start of construction for the first building, according to Applied Digital. CoreWeave was not leased yet at this site, but this is the construction start date we're using for relevance.

    No IT power yet0 operating

  2. CoreWeave signed the first lease package for 250 MW. No buildings online yet. This is according to an SEC 8-k filing from this date.

    No IT power yet0 operating

  3. A new 150 MW lease brings CoreWeave to 400 MW total contracted. The project is now clearly scheduled to be a three-building CoreWeave campus.

    No IT power yet0 operating

  4. The first 50 MW slice of Building 1 has reached Ready for Service status according to this report. This is the first point where we would count any CoreWeave capacity as operational.

    50 MW1 operating

  5. This Applied Digital report says the rest of Building 1 has reached Ready for Service, bringing the first building to its expected 100 MW. We can treat this as the first completed data center building.

    68 MW1 operating

  6. According to satellite imagery, Building 1 looks complete and in service, with the surrounding power/cooling equipment also operational. (Note: this image doesn't provide a view of buildings 2 or 3, though it's very safe to assume they're under construction at this stage, considering they're still under construction in the satellite image 3 months from now.)

    68 MW1 operating

  7. According to satellite imagery, Building 2 is fully roofed and shell complete, with rooftop chillers mostly installed. Building 3 construction is well underway, with about 1/4 of the roofing done and the foundation laid out.

    68 MW1 operating

  8. According to the schedule, Building 2 should be online sometime in the second half of 2026. We can estimate the end of 2026 for 250 MW operational.

    88 MW2 operating

  9. According to schedule, Building 3 should come online in the first half of 2027. That would bring the full PF1 campus to 400 MW, according to the contract.

    400 MW3 operating

Adopt a site

Watch CoreWeave Ellendale ND

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Sources

Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

Questions

CoreWeave Ellendale ND, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is CoreWeave Ellendale ND?

CoreWeave Ellendale ND is in Ellendale, North Dakota, United States, at 9685 87th Ave SE, Ellendale, ND 58436. Epoch AI publishes its coordinates as 46.0153, -98.5725.

Who owns CoreWeave Ellendale ND?

Epoch AI lists CoreWeave as its owner and OpenAI (Epoch AI rates this speculative) as its user.

How much power does CoreWeave Ellendale ND use?

Epoch AI estimates its IT power at 68 MW as of June 30, 2026, and its total facility power at 88 MW. It projects 400 MW of IT power by June 1, 2027.

Is CoreWeave Ellendale ND operating?

Yes, and it is growing. Epoch AI counts 1 building operating as of June 30, 2026, with more capacity on its timeline.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).