Power Map · Operating, expanding

Google Columbus, Columbus

Google Columbus is an SI data center in Columbus, Ohio, United States, owned by Google and used by Google DeepMind (Epoch AI rates this speculative). Epoch AI estimates its IT power at 303 MW as of August 5, 2026, with 4 buildings operating, and projects 386 MW by July 1, 2027. Its public timeline starts on October 1, 2021.

IT power
303 MWAug 5, 2026
Facility power
364 MW
Status
Operating, expanding
Buildings operating
4

Where it is

The site and its facts

Google Columbus on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Columbus, Ohio, United StatesOpen in OpenStreetMap
Place
Columbus, Ohio, United States
Address
5076 S High St, Columbus, OH 43207
Coordinates
39.8491° N, 82.9966° W
Owner
Google
Users
Google DeepMind (Epoch AI rates this speculative)
Chips
TPU v5e, TPU v5p, TPU v6e, TPU v7
Compute
About 331,986 H100 equivalentsEpoch AI estimate, Aug 5, 2026
Projected
386 MW IT power by July 1, 2027Epoch AI projection, not a fact yet

Heat Watch

Google Columbus: heat seen from space

Over the last three summers NASA's MODIS read the ground here -2.6 °C against the land 5 to 10 km around it by day, a change of +0.8 °C since before work on this build began.

Lights On

Google Columbus: light at night

NASA's night imagery read 56.0 of 100 over this site in October 2026, against 31.3 in October 2018, the first month read. Against a year before: +3.8 points. The place was already bright at the first reading, so growth is harder to see. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on Google Columbus, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Land clearing begins on the eastern half of the site, for Buildings 1-2

    No IT power yet0 operating

  2. Building 2 foundation work begins. Building 1 generators seem complete, cooling towers still under construction.

    No IT power yet0 operating

  3. Building 1 operational. No visible construction and roads/parking complete around the building. Building 2 chillers are beginning construction. Foundation work begins for Building 3.

    65 MW1 operating

  4. Building 2 operational. Parking complete, no more visible construction.

    130 MW2 operating

  5. Building 3 operational. Surrounding roads finished, no more visible construction.

    216 MW3 operating

  6. Buildings 1-3 are visibly operational, with steam coming out of the cooling towers. Meanwhile Building 4 is extremely close to completion, with all backup generators complete with only 3 cooling towers missing their fans. ~1/2 the generators are installed for Building 5, and the roof is mostly complete (starting to install the final white layer, with the actual roof structure already complete).

    216 MW3 operating

  7. Building 4 operational. No more visible construction, and since only 3 fans needed to be installed since Feburary, operational date was likely soon after. Building 5 roof almost complete.

    303 MW4 operating

  8. Confirmation that Building 4 is complete. Building 5 has progressed since February, with a complete roof, all backup generators in place, and five cooling towers in place.

    303 MW4 operating

  9. Building 5 operational. The transmission line construction notice that expands site by 100 MW is assumed to be entirely for Building 5, and has an in-service date of July 1, 2027 (page 3). Estimate taken on the safe side based on completion times for Building 3-4 from when roof was complete.

    386 MW5 operating

Adopt a site

Watch Google Columbus

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Sources

Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

Questions

Google Columbus, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is Google Columbus?

Google Columbus is in Columbus, Ohio, United States, at 5076 S High St, Columbus, OH 43207. Epoch AI publishes its coordinates as 39.8491, -82.9966.

Who owns Google Columbus?

Epoch AI lists Google as its owner and Google DeepMind (Epoch AI rates this speculative) as its user.

How much power does Google Columbus use?

Epoch AI estimates its IT power at 303 MW as of August 5, 2026, and its total facility power at 364 MW. It projects 386 MW of IT power by July 1, 2027.

Is Google Columbus operating?

Yes, and it is growing. Epoch AI counts 4 buildings operating as of August 5, 2026, with more capacity on its timeline.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).