Power Map · Operating, expanding
Google Columbus, Columbus
Google Columbus is an SI data center in Columbus, Ohio, United States, owned by Google and used by Google DeepMind (Epoch AI rates this speculative). Epoch AI estimates its IT power at 303 MW as of August 5, 2026, with 4 buildings operating, and projects 386 MW by July 1, 2027. Its public timeline starts on October 1, 2021.
- IT power
- 303 MWAug 5, 2026
- Facility power
- 364 MW
- Status
- Operating, expanding
- Buildings operating
- 4
Where it is
The site and its facts
Google Columbus on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Columbus, Ohio, United States
- Address
- 5076 S High St, Columbus, OH 43207
- Coordinates
- 39.8491° N, 82.9966° W
- Owner
- Users
- Google DeepMind (Epoch AI rates this speculative)
- Chips
- TPU v5e, TPU v5p, TPU v6e, TPU v7
- Compute
- About 331,986 H100 equivalentsEpoch AI estimate, Aug 5, 2026
- Projected
- 386 MW IT power by July 1, 2027Epoch AI projection, not a fact yet
Heat Watch
Google Columbus: heat seen from space
Over the last three summers NASA's MODIS read the ground here -2.6 °C against the land 5 to 10 km around it by day, a change of +0.8 °C since before work on this build began.
Lights On
Google Columbus: light at night
NASA's night imagery read 56.0 of 100 over this site in October 2026, against 31.3 in October 2018, the first month read. Against a year before: +3.8 points. The place was already bright at the first reading, so growth is harder to see. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on Google Columbus, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
Land clearing begins on the eastern half of the site, for Buildings 1-2
No IT power yet0 operating
Building 2 foundation work begins. Building 1 generators seem complete, cooling towers still under construction.
No IT power yet0 operating
Building 1 operational. No visible construction and roads/parking complete around the building. Building 2 chillers are beginning construction. Foundation work begins for Building 3.
65 MW1 operating
Building 2 operational. Parking complete, no more visible construction.
130 MW2 operating
Building 3 operational. Surrounding roads finished, no more visible construction.
216 MW3 operating
Buildings 1-3 are visibly operational, with steam coming out of the cooling towers. Meanwhile Building 4 is extremely close to completion, with all backup generators complete with only 3 cooling towers missing their fans. ~1/2 the generators are installed for Building 5, and the roof is mostly complete (starting to install the final white layer, with the actual roof structure already complete).
216 MW3 operating
Building 4 operational. No more visible construction, and since only 3 fans needed to be installed since Feburary, operational date was likely soon after. Building 5 roof almost complete.
303 MW4 operating
Confirmation that Building 4 is complete. Building 5 has progressed since February, with a complete roof, all backup generators in place, and five cooling towers in place.
303 MW4 operating
Building 5 operational. The transmission line construction notice that expands site by 100 MW is assumed to be entirely for Building 5, and has an in-service date of July 1, 2027 (page 3). Estimate taken on the safe side based on completion times for Building 3-4 from when roof was complete.
386 MW5 operating
Adopt a site
Watch Google Columbus
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- DCD article detailing early work beginning on the site
- Transmission line construction notice; details current site capacity, expansion, and maximum future site capacity
- Epoch AI, "AI data centers", the record for Google Columbus (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
Questions
Google Columbus, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is Google Columbus?
Google Columbus is in Columbus, Ohio, United States, at 5076 S High St, Columbus, OH 43207. Epoch AI publishes its coordinates as 39.8491, -82.9966.
Who owns Google Columbus?
Epoch AI lists Google as its owner and Google DeepMind (Epoch AI rates this speculative) as its user.
How much power does Google Columbus use?
Epoch AI estimates its IT power at 303 MW as of August 5, 2026, and its total facility power at 364 MW. It projects 386 MW of IT power by July 1, 2027.
Is Google Columbus operating?
Yes, and it is growing. Epoch AI counts 4 buildings operating as of August 5, 2026, with more capacity on its timeline.
Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).