Power Map · Operating, expanding

Google Storey County, Clark

Google Storey County is an SI data center in Clark, Nevada, United States, owned by Google and used by Google DeepMind (Epoch AI rates this speculative). Epoch AI estimates its IT power at 161 MW as of April 13, 2026, with 2 buildings operating, and projects 300 MW by June 30, 2027. Its public timeline starts on August 30, 2023.

IT power
161 MWApr 13, 2026
Facility power
214 MW
Status
Operating, expanding
Buildings operating
2

Where it is

The site and its facts

Google Storey County on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Clark, Nevada, United StatesOpen in OpenStreetMap
Place
Clark, Nevada, United States
Address
Not public
Coordinates
39.4947° N, 119.4302° W
Owner
Google
Users
Google DeepMind (Epoch AI rates this speculative)
Chips
TPU v5e, TPU v4, TPU v6e, TPU v5p
Compute
About 133,906 H100 equivalentsEpoch AI estimate, Apr 13, 2026
Projected
300 MW IT power by June 30, 2027Epoch AI projection, not a fact yet

Heat Watch

Google Storey County: heat seen from space

Over the last three summers NASA's MODIS read the ground here +1.4 °C against the land 5 to 10 km around it by day, a change of -0.7 °C since before work on this build began.

Lights On

Google Storey County: light at night

NASA's night imagery read 46.6 of 100 over this site in October 2026, against 0.5 in October 2018, the first month read. Against a year before: +6.0 points. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on Google Storey County, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Building 1, which was first operational in 2021, has increased power capacity by about 75%. This is based on the expansion of the dry cooling array from 4 to 7 columns (seen on Google Earth). Its backup generators also grew from 18 to 33, an 83% increase. Around this time (2023 Q3) the quarterly PUE of the campus is 1.24, down from the initial 1.29 in 2022 Q3. Since no other buildings have been added, these changes indicate an increase in power density, which may entail a new generation of hardware getting installed.

    81 MW1 operating

  2. Building 2 now has generators in place, but there is still a crane and construction work present.

    81 MW1 operating

  3. Building 2 is operational. Based on a Google Earth image showing complete building shell, mechanical equipment and generators, plus cars parked at the front.

    161 MW2 operating

  4. Building 3 foundation is underway. Building 2 exterior looks totally clean/landscaped.

    161 MW2 operating

  5. Building 3 has a partially complete shell, electrical and mechanical equipment. Building 4 foundation is underway.

    161 MW2 operating

  6. Building 3 is estimated to be operational. We estimate the operational date by analogy to the time that Building 1 took to go from a foundation to being operational. The power capacity is based on the number of generators reported in an air quality permit application (p.92-93). The dry cooler array is more than double the size of the Building 1 array, which suggests an even larger power capacity than we estimate, but we believe the generator-based estimate is more reliable here.

    300 MW3 operating

Adopt a site

Watch Google Storey County

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Sources

Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

Questions

Google Storey County, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is Google Storey County?

Google Storey County is in Clark, Nevada, United States. Epoch AI publishes its coordinates as 39.4947, -119.4302.

Who owns Google Storey County?

Epoch AI lists Google as its owner and Google DeepMind (Epoch AI rates this speculative) as its user.

How much power does Google Storey County use?

Epoch AI estimates its IT power at 161 MW as of April 13, 2026, and its total facility power at 214 MW. It projects 300 MW of IT power by June 30, 2027.

Is Google Storey County operating?

Yes, and it is growing. Epoch AI counts 2 buildings operating as of April 13, 2026, with more capacity on its timeline.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).