QTS Eagle Mountain is an SI data center in Eagle Mountain, Utah, United States, owned by Meta (Epoch AI rates this speculative) and used by Meta (Epoch AI rates this speculative). Epoch AI tracks it as under construction: no building is operating yet as of May 2, 2026, and projects 304 MW by July 1, 2027. Its public timeline starts on October 1, 2023.
- IT power
- Not statedEpoch AI
- Facility power
- Not stated
- Status
- Under construction
- Buildings operating
- 0
Where it is
The site and its facts
QTS Eagle Mountain on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Eagle Mountain, Utah, United States
- Address
- 652 E Hyperscale Way, Eagle Mountain, UT 84013
- Coordinates
- 40.2650° N, 112.0286° W
- Owner
- Meta (Epoch AI rates this speculative)
- Users
- Meta (Epoch AI rates this speculative)
- Projected
- 304 MW IT power by July 1, 2027Epoch AI projection, not a fact yet
Heat Watch
QTS Eagle Mountain: heat seen from space
Over the last three summers NASA's MODIS read the ground here +0.9 °C against the land 5 to 10 km around it by day.
Lights On
QTS Eagle Mountain: light at night
NASA's night imagery read 53.5 of 100 over this site in October 2026, against 0.7 in October 2018, the first month read. Against a year before: +35.4 points. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on QTS Eagle Mountain, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
First signs of site preparation show up on satellite imagery.
No IT power yet0 operating
Site preparation continues. Outline of a first building that is not the data center of interest Buildings 1 or 2 is visible.
No IT power yet0 operating
Building 1 roof finished. Satellite imagery shows construction vehicles and concrete pads with no air cooled chiller units indicating Buildings 1 and 2 cooling install continues. On the other side of each building, emergency generator install continues as well.
No IT power yet0 operating
We estimate Buildings 1 and 2 will be fully operational by the end of 2026 because there are at least seven months since cooling and emergency generators have started to be installed. This estimate is also in line with similar QTS data center campus construction timelines.
203 MW2 operating
We estimate Building 3 will be fully operational by H2 2027 following a similar time line to Buildings 1 and 2 of 14 months from land clearing to operational.
304 MW3 operating
Adopt a site
Watch QTS Eagle Mountain
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- QTS Eagle Mountain website
- DEQ Approval listing emergency generators
- Epoch AI, "AI data centers", the record for QTS Eagle Mountain (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
Questions
QTS Eagle Mountain, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is QTS Eagle Mountain?
QTS Eagle Mountain is in Eagle Mountain, Utah, United States, at 652 E Hyperscale Way, Eagle Mountain, UT 84013. Epoch AI publishes its coordinates as 40.2650, -112.0286.
Who owns QTS Eagle Mountain?
Epoch AI lists Meta (Epoch AI rates this speculative) as its owner and Meta (Epoch AI rates this speculative) as its user.
How much power does QTS Eagle Mountain use?
No building is operating yet, so Epoch AI states no IT power for it today. It projects 304 MW of IT power by July 1, 2027.
Is QTS Eagle Mountain operating?
Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.
Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).