Power Map · Operating

Meta Huntsville, Huntsville

Meta Huntsville is an SI data center in Huntsville, Alabama, United States, owned by Meta and used by Meta. Epoch AI estimates its IT power at 146 MW as of June 2, 2026, with 2 buildings operating. Its public timeline starts on December 13, 2021.

IT power
146 MWJun 2, 2026
Facility power
198 MW
Status
Operating
Buildings operating
2

Where it is

The site and its facts

Meta Huntsville on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Huntsville, Alabama, United StatesOpen in OpenStreetMap
Place
Huntsville, Alabama, United States
Address
5400 Prosperity Dr NW, Toney, AL
Coordinates
34.8539° N, 86.6262° W
Owner
Meta
Users
Meta
Chips
B300
Compute
About 166,761 H100 equivalentsEpoch AI estimate, Jun 2, 2026
Energy
Tennessee Valley Authority, NextEra Energy Resources, First Solar

Heat Watch

Meta Huntsville: heat seen from space

Over the last three summers NASA's MODIS read the ground here -0.3 °C against the land 5 to 10 km around it by day.

Lights On

Meta Huntsville: light at night

NASA's night imagery read 26.0 of 100 over this site in October 2026, against 2.9 in October 2018, the first month read. Against a year before: -2.4 points. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on Meta Huntsville, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Building 1 land clearing begins.

    No IT power yet0 operating

  2. Building 2 roof starts to go on and its cooling installation is in progress.

    No IT power yet0 operating

  3. We believe Building 1 and 2 are still being finished due to continued construction vehicles and unfinished land around the data center sites.

    No IT power yet0 operating

  4. Color artifacts appear on small number of Building 1 fans. Continued presence of construction equipment and unfinished land around Building 2 suggests the final phase of construction.

    No IT power yet0 operating

  5. We estimate that Building 1 is operational 30 days after the appearance of color artifacts on the fans.

    78 MW1 operating

  6. We estimate Building 2 becomes operational due to being 120 days after final phases of construction, 9 months since roof and cooling were done, and similar Meta data centers construction timelines.

    146 MW2 operating

Adopt a site

Watch Meta Huntsville

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Sources

Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

Questions

Meta Huntsville, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is Meta Huntsville?

Meta Huntsville is in Huntsville, Alabama, United States, at 5400 Prosperity Dr NW, Toney, AL. Epoch AI publishes its coordinates as 34.8539, -86.6262.

Who owns Meta Huntsville?

Epoch AI lists Meta as its owner and Meta as its user.

How much power does Meta Huntsville use?

Epoch AI estimates its IT power at 146 MW as of June 2, 2026, and its total facility power at 198 MW.

Is Meta Huntsville operating?

Yes. Epoch AI counts 2 buildings operating as of June 2, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).