Microsoft Fairwater Atlanta is an SI data center in Fayetteville, Georgia, United States, owned by Microsoft and used by OpenAI (Epoch AI rates this likely), Microsoft (Epoch AI rates this likely). Epoch AI estimates its IT power at 636 MW as of June 14, 2026, with 4 buildings operating. Its public timeline starts on April 9, 2023.

IT power
636 MWJun 14, 2026
Facility power
859 MW
Status
Operating
Buildings operating
4

Where it is

The site and its facts

Microsoft Fairwater Atlanta on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Fayetteville, Georgia, United StatesOpen in OpenStreetMap
Place
Fayetteville, Georgia, United States
Address
1435 Hwy 54 W, Fayetteville, GA 30214
Coordinates
33.4572° N, 84.5245° W
Owner
Microsoft
Users
OpenAI (Epoch AI rates this likely), Microsoft (Epoch AI rates this likely)
Project
Microsoft AI WAN
Chips
B200
Compute
About 768,769 H100 equivalentsEpoch AI estimate, Jun 14, 2026
Energy
Georgia Power

The Gigawatt Ledger · Energized

Microsoft Fairwater Atlanta: announced against built

No power figure was announced for this project. No power figure was announced. Epoch AI estimates 636 MW of IT power in operation (859 MW for the whole facility) as of June 14, 2026.

Heat Watch

Microsoft Fairwater Atlanta: heat seen from space

Over the last three summers NASA's MODIS read the ground here -0.2 °C against the land 5 to 10 km around it by day.

Lights On

Microsoft Fairwater Atlanta: light at night

NASA's night imagery read 61.7 of 100 over this site in October 2026, against 17.2 in October 2018, the first month read. Against a year before: +5.4 points. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on Microsoft Fairwater Atlanta, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Land clearing begins for southern part (Building 1-2)

    No IT power yet0 operating

  2. Building 1 and 2 are operational. Building 1 looked operational sooner, but the buildings are paired in the Fairwater design. The roof of Building 4 is almost complete, while mechanical equipment is still being installed.

    321 MW2 operating

  3. Building 4 roof is complete and all mechanical equipment appears to be installed. However, there is still a lot of construction activity around the building.

    321 MW2 operating

  4. Building 4 still has some equipment strewn around the perimeter, so we think it is still going through commissioning. Two new buildings at the campus have shells underway, but we don't know if Microsoft is the tenant for those.

    321 MW2 operating

  5. Building 3 and 4 are operational.

    636 MW4 operating

Adopt a site

Watch Microsoft Fairwater Atlanta

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Sources

Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

Questions

Microsoft Fairwater Atlanta, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is Microsoft Fairwater Atlanta?

Microsoft Fairwater Atlanta is in Fayetteville, Georgia, United States, at 1435 Hwy 54 W, Fayetteville, GA 30214. Epoch AI publishes its coordinates as 33.4572, -84.5245.

Who owns Microsoft Fairwater Atlanta?

Epoch AI lists Microsoft as its owner and OpenAI (Epoch AI rates this likely), Microsoft (Epoch AI rates this likely) as its users.

How much power does Microsoft Fairwater Atlanta use?

Epoch AI estimates its IT power at 636 MW as of June 14, 2026, and its total facility power at 859 MW.

Is Microsoft Fairwater Atlanta operating?

Yes. Epoch AI counts 4 buildings operating as of June 14, 2026.