1. Home
  2. Power Map
  3. STACK Infrastructure NVA02

Power Map · Operating, expanding

STACK Infrastructure NVA02, Manassas

STACK Infrastructure NVA02 is an SI data center in Manassas, Virginia, United States. Epoch AI estimates its IT power at 85 MW as of February 14, 2026, with 1 building operating, and projects 348 MW by January 1, 2028. Its public timeline starts on October 19, 2019.

IT power
85 MWFeb 14, 2026
Facility power
118 MW
Status
Operating, expanding
Buildings operating
1

Where it is

The site and its facts

STACK Infrastructure NVA02 on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Manassas, Virginia, United StatesOpen in OpenStreetMap
Place
Manassas, Virginia, United States
Address
9590 Hornbaker Rd, Manassas, VA 20109
Coordinates
38.7448° N, 77.5396° W
Owner
Not public
Chips
H100
Compute
About 61,142 H100 equivalentsEpoch AI estimate, Feb 14, 2026
Projected
348 MW IT power by January 1, 2028Epoch AI projection, not a fact yet

Heat Watch

STACK Infrastructure NVA02: heat seen from space

Over the last three summers NASA's MODIS read the ground here +1.1 °C against the land 5 to 10 km around it by day, a change of -0.3 °C since before work on this build began.

Lights On

STACK Infrastructure NVA02: light at night

NASA's night imagery read 74.8 of 100 over this site in October 2026, against 53.5 in October 2018, the first month read. Against a year before: +8.9 points. The place was already bright at the first reading, so growth is harder to see. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on STACK Infrastructure NVA02, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Land clearing begins by Peterson Companies for Stack Infrastructure, which is noted in the news and visible on satellite imagery.

    No IT power yet0 operating

  2. Building 1 is operational, which is assumed to be three months after the last backup diesel generators are finished. The generators were first seen to be finished July 1 from satellite imagery (a clear image of this can be seen on July 29 via Google Earth).

    85 MW1 operating

  3. All buildings have begun construction (with groundwork starting for AI building 6), as depicted by satellite imagery.

    85 MW1 operating

  4. Estimate: All 6 AI data center buildings will be finished in 2028, assuming a groundbreak-to-operational timeline of 18-24 months. One is complete, three are clearly under construction, and the last two data centers are still breaking ground and laying foundations.

    348 MW6 operating

Adopt a site

Watch STACK Infrastructure NVA02

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Sources

Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

Questions

STACK Infrastructure NVA02, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is STACK Infrastructure NVA02?

STACK Infrastructure NVA02 is in Manassas, Virginia, United States, at 9590 Hornbaker Rd, Manassas, VA 20109. Epoch AI publishes its coordinates as 38.7448, -77.5396.

Who owns STACK Infrastructure NVA02?

Epoch AI does not name an owner yet.

How much power does STACK Infrastructure NVA02 use?

Epoch AI estimates its IT power at 85 MW as of February 14, 2026, and its total facility power at 118 MW. It projects 348 MW of IT power by January 1, 2028.

Is STACK Infrastructure NVA02 operating?

Yes, and it is growing. Epoch AI counts 1 building operating as of February 14, 2026, with more capacity on its timeline.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).