Power Map · Operating, expanding
STACK Infrastructure NVA02, Manassas
STACK Infrastructure NVA02 is an SI data center in Manassas, Virginia, United States. Epoch AI estimates its IT power at 85 MW as of February 14, 2026, with 1 building operating, and projects 348 MW by January 1, 2028. Its public timeline starts on October 19, 2019.
- IT power
- 85 MWFeb 14, 2026
- Facility power
- 118 MW
- Status
- Operating, expanding
- Buildings operating
- 1
Where it is
The site and its facts
STACK Infrastructure NVA02 on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Manassas, Virginia, United States
- Address
- 9590 Hornbaker Rd, Manassas, VA 20109
- Coordinates
- 38.7448° N, 77.5396° W
- Owner
- Not public
- Chips
- H100
- Compute
- About 61,142 H100 equivalentsEpoch AI estimate, Feb 14, 2026
- Projected
- 348 MW IT power by January 1, 2028Epoch AI projection, not a fact yet
Heat Watch
STACK Infrastructure NVA02: heat seen from space
Over the last three summers NASA's MODIS read the ground here +1.1 °C against the land 5 to 10 km around it by day, a change of -0.3 °C since before work on this build began.
Lights On
STACK Infrastructure NVA02: light at night
NASA's night imagery read 74.8 of 100 over this site in October 2026, against 53.5 in October 2018, the first month read. Against a year before: +8.9 points. The place was already bright at the first reading, so growth is harder to see. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on STACK Infrastructure NVA02, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
Land clearing begins by Peterson Companies for Stack Infrastructure, which is noted in the news and visible on satellite imagery.
No IT power yet0 operating
Building 1 is operational, which is assumed to be three months after the last backup diesel generators are finished. The generators were first seen to be finished July 1 from satellite imagery (a clear image of this can be seen on July 29 via Google Earth).
85 MW1 operating
All buildings have begun construction (with groundwork starting for AI building 6), as depicted by satellite imagery.
85 MW1 operating
Estimate: All 6 AI data center buildings will be finished in 2028, assuming a groundbreak-to-operational timeline of 18-24 months. One is complete, three are clearly under construction, and the last two data centers are still breaking ground and laying foundations.
348 MW6 operating
Adopt a site
Watch STACK Infrastructure NVA02
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- Official website for NVA02, showcasing their project.
- Most recent official schematic of the NVA02 campus.
- Air quality permit from the state of Virginia.
- Epoch AI, "AI data centers", the record for STACK Infrastructure NVA02 (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
Questions
STACK Infrastructure NVA02, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is STACK Infrastructure NVA02?
STACK Infrastructure NVA02 is in Manassas, Virginia, United States, at 9590 Hornbaker Rd, Manassas, VA 20109. Epoch AI publishes its coordinates as 38.7448, -77.5396.
Who owns STACK Infrastructure NVA02?
Epoch AI does not name an owner yet.
How much power does STACK Infrastructure NVA02 use?
Epoch AI estimates its IT power at 85 MW as of February 14, 2026, and its total facility power at 118 MW. It projects 348 MW of IT power by January 1, 2028.
Is STACK Infrastructure NVA02 operating?
Yes, and it is growing. Epoch AI counts 1 building operating as of February 14, 2026, with more capacity on its timeline.
Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).