SI data centers in Texas
Texas has 14 SI data centers on the Power Map, 5 of them under construction, with 1.73 GW of IT power running per Epoch AI. Homes paid an average of 15.91 cents per kWh in August 2026, up 3.3% from a year before and up 33.2% from five years before (EIA). Grid operators in Texas: ERCOT (about 90% of the state's electric load); MISO (all or part of the state); Southwest Power Pool (part of the state).
- SI data centers
- 14
- Being built
- 5
- IT power running
- 1,730 MW
- Home price ¢/kWh
- 15.91
Near you
Look up your ZIP code
The full answer for one ZIP code: the sites nearest you, what is being built, hearings, prices and alerts. Your ZIP code stays in your browser.
On the Power Map
SI data centers in Texas
Each site with its status and the IT power running, from Epoch AI's public tracker read November 10, 2026, and the Gigawatt Ledger's announced and confirmed figures where it has them.
The Power MapOperating
OpenAI Stargate Abilene
Abilene, Texas · Oracle
824 MW of IT power running as of Nov 1, 2026
Announced 1.2 GWConfirmed energized 1.15 GWLedger
Operating, expanding
CoreWeave Denton TX
Denton, Texas · CoreWeave
262 MW of IT power running as of Sep 1, 2026
Announced 260 MWConfirmed energized 262 MWLedger
Operating
Meta Temple
Temple, Texas · Meta
178 MW of IT power running as of Sep 30, 2026
Operating, expanding
Coreweave Helios
Afton, Texas · CoreWeave
132 MW of IT power running as of Aug 30, 2026
Running 132 MWPlanned 528 MWEpoch AI
Operating
Google Midlothian
Midlothian, Texas · Google
103 MW of IT power running as of Jul 1, 2026
Operating, expanding
Google Red Oak
Red Oak, Texas · Google
77 MW of IT power running as of Feb 6, 2026
Running 77 MWPlanned 154 MWEpoch AI
Operating
Microsoft SAT40
San Antonio, Texas · Microsoft
75 MW of IT power running as of Feb 4, 2026
Operating
Microsoft SAT14
San Antonio, Texas · Microsoft
47 MW of IT power running as of Mar 31, 2026
Operating, expanding
Vantage TX1
San Antonio, Texas
32 MW of IT power running as of Feb 15, 2026
Running 32 MWPlanned 128 MWEpoch AI
Under construction
Anthropic Barber Lake
Colorado City, Texas · Cipher Mining
No building running yet as of Jul 30, 2026
Announced 207 MWConfirmed energized none yetLedger
Under construction
Crusoe Abilene Expansion
Abilene, Texas · Microsoft
No building running yet as of Jan 15, 2026
Announced 900 MWConfirmed energized none yetLedger
Under construction
Goodnight
Claude, Texas · Google
No building running yet as of Apr 16, 2026
Running none yetPlanned 1.01 GWEpoch AI
Under construction
OpenAI Stargate Milam
Burlington, Texas · Softbank
No building running yet as of Mar 23, 2026
Announced 1.2 GWConfirmed energized none yetLedger
Under construction
OpenAI Stargate Shackelford
Abilene, Texas · Oracle
No building running yet as of Sep 4, 2026
Announced 1.4 GWConfirmed energized none yetLedger
Power prices
What homes in Texas pay
Homes paid an average of 15.91 cents per kWh in August 2026, up 3.3% from a year before and up 33.2% from five years before (EIA).
Average residential price, cents per kWh, by month. Source: U.S. Energy Information Administration (series ELEC.PRICE.TX-RES.M), through August 2026, published October 22, 2026.
Grid and bills
Texas's grid, and what data centers add
Only figures a market monitor, a state commission or a utility filing published, each with its link and date. They describe a grid region, not one home.
Grid operators in Texas: ERCOT (about 90% of the state's electric load); MISO (all or part of the state); Southwest Power Pool (part of the state). Sources: ERCOT, About, Wikipedia, Midcontinent Independent System Operator (revision of Sep 26, 2026), Wikipedia, Southwest Power Pool (revision of Aug 17, 2026), read November 17, 2026.
No market monitor, state commission or utility filing that puts a number on what data center demand adds to power costs in Texas has been read and verified for this page yet, so none is shown. Nationally, Pew Research Center found in 2026 that 43% of the US adults whose energy costs went up call data centers a major reason.
Neighbor reports
Hearings, proposals and sightings in Texas
Filed by neighbors with an SI Passport, approved by the team against a public source, and sealed on Solana.
Report something- Loading the approved reports.
Questions
Texas, answered
The short version, with the sources.
How SI Next Door worksHow many SI data centers are in Texas?
Texas has 14 SI data centers on the Power Map, 5 of them under construction, with 1.73 GW of IT power running per Epoch AI. The list comes from the Power Map, which draws on Epoch AI's public tracker.
How much does electricity cost for homes in Texas?
Homes paid an average of 15.91 cents per kWh in August 2026, up 3.3% from a year before and up 33.2% from five years before (EIA). The series is the U.S. Energy Information Administration's average residential price, published October 22, 2026.
Are data centers raising power bills in Texas?
No source this page could verify has put a number on it for Texas. SI Next Door shows only figures a market monitor, a state commission or a utility filing published, with the link and the date.