Power Map · Under construction
CoreWeave Lancaster Greenfield site, Lancaster
CoreWeave Lancaster Greenfield site is an SI data center in Lancaster, Pennsylvania, United States, owned by CoreWeave and used by OpenAI (Epoch AI rates this speculative). Epoch AI tracks it as under construction: no building is operating yet as of July 13, 2026, and projects 92 MW by June 30, 2027. Its public timeline starts on July 15, 2025.
- IT power
- Not statedEpoch AI
- Facility power
- Not stated
- Status
- Under construction
- Buildings operating
- 0
Where it is
The site and its facts
CoreWeave Lancaster Greenfield site on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Lancaster, Pennsylvania, United States
- Address
- 216 Greenfield Rd, Lancaster, PA
- Coordinates
- 40.0481° N, 76.2622° W
- Owner
- CoreWeave
- Users
- OpenAI (Epoch AI rates this speculative)
- Projected
- 92 MW IT power by June 30, 2027Epoch AI projection, not a fact yet
The Gigawatt Ledger · Under construction
Lancaster: announced against built
100 MW was announced for this project. Epoch AI tracks the site as under construction, with no building operating as of July 13, 2026.
Heat Watch
CoreWeave Lancaster Greenfield site: heat seen from space
Over the last three summers NASA's MODIS read the ground here +2.7 °C against the land 5 to 10 km around it by day.
Lights On
CoreWeave Lancaster Greenfield site: light at night
NASA's night imagery read 59.6 of 100 over this site in October 2026, against 47.5 in October 2018, the first month read. Against a year before: +14.5 points. The place was already bright at the first reading, so growth is harder to see. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on CoreWeave Lancaster Greenfield site, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
No IT power yet0 operating
Cooling install continues on the roof, satellite imagery indicates that not all units have been completed. Continued presence of construction vehicles and unfinished land on the campus suggests that the building is not operational yet.
No IT power yet0 operating
We estimate that Building 1 will be operational by Summer 2027 due to third party reporting.
92 MW1 operating
Adopt a site
Watch CoreWeave Lancaster Greenfield site
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- CoreWeave announces plans to spend $6 billion on Lancaster data centers
- Machine Investment Group purchases two former printing press sites in Lancaster, Pennsylvania
- Epoch AI, "AI data centers", the record for CoreWeave Lancaster Greenfield site (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
116 km away
AWS Berwick
Berwick, Pennsylvania, United States
108 MW IT power
127 km away
Microsoft-Nebius New Jersey
Vineland, New Jersey, United States
50 MW IT power
164 km away
Google Arcola
Arcola, Virginia, United States
77 MW IT power
181 km away
Google Bristow
Bristow, Virginia, United States
238 MW IT power
Questions
CoreWeave Lancaster Greenfield site, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is CoreWeave Lancaster Greenfield site?
CoreWeave Lancaster Greenfield site is in Lancaster, Pennsylvania, United States, at 216 Greenfield Rd, Lancaster, PA. Epoch AI publishes its coordinates as 40.0481, -76.2622.
Who owns CoreWeave Lancaster Greenfield site?
Epoch AI lists CoreWeave as its owner and OpenAI (Epoch AI rates this speculative) as its user.
How much power does CoreWeave Lancaster Greenfield site use?
No building is operating yet, so Epoch AI states no IT power for it today. It projects 92 MW of IT power by June 30, 2027.
Is CoreWeave Lancaster Greenfield site operating?
Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.
Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).