Gigawatt Ledger · Under construction
Lancaster, announced against built
Lancaster is an SI compute project in Lancaster, Pennsylvania, by CoreWeave, Chirisa Technology Parks and Machine Investment Group. The announced figure is initial 100 MW data center, from CoreWeave (Jul 15, 2025). Epoch AI tracks the site as under construction, with no building operating as of July 13, 2026. Its state today: under construction.
- Announced
- 100 MW
- Energized
- NoneJul 13, 2026
- State
- Under construction
- Source links
- 2
Announced
What was said, and when
Each row is one public announcement about Lancaster: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.
- Company statement
CoreWeave
CoreWeave Announces Multi-Billion Dollar Commitment to AI Infrastructure in Pennsylvania
CoreWeave says it intends to commit up to $6 billion to a new data center in Lancaster.
“The initial 100 megawatt (MW) data center”
“with potential to expand to 300 MW”
- Power or capacity stated
- Initial 100 MW; potential to expand to 300 MW
- Promised
- None stated
The larger figure, potential to expand to 300 MW (CoreWeave, Jul 15, 2025), is stated as an upper limit or an ambition. It is listed here and left out of the Ledger's total.
Built
What public evidence confirms
What is on the ground today, from the Power Map data and from any statement or filing that states live power.
Epoch AI tracks the site as under construction, with no building operating as of July 13, 2026.
- Epoch AI estimate
Epoch AI · Power Map
CoreWeave Lancaster Greenfield site on the Power Map
Epoch AI tracks CoreWeave Lancaster Greenfield site as under construction: no building is operating as of July 13, 2026.
Cooling install continues on the roof, satellite imagery indicates that not all units have been completed. Continued presence of construction vehicles and unfinished land on the campus suggests that the building is not operational yet.
- IT power running
- None
- Whole facility
- None
Epoch AI projects 92 MW of IT power by June 30, 2027. A projection, not a fact yet.
Heat Watch
CoreWeave Lancaster Greenfield site: heat seen from space
Over the last three summers NASA's MODIS read the ground here +2.7 °C against the land 5 to 10 km around it by day.
Timeline
Announcements and evidence, by date
What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.
CoreWeave: Initial 100 MW; potential to expand to 300 MW.Announcement · CoreWeave
CoreWeave Lancaster Greenfield site: 0 buildings operating, no IT power yet.Evidence · Epoch AI, on the Power Map
CoreWeave Lancaster Greenfield site: 0 buildings operating, no IT power yet.Evidence · Epoch AI, on the Power Map
Corrections
See something wrong? File a correction
Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.
File a correction
Sign in with your SI Passport to file a correction. It is a free message signature and never moves tokens.
A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.
Corrections on file · 0
- Loading the corrections on file.
Sources
Every link behind this page
Read on November 11, 2026. An undated page carries the date it was read.
- CoreWeave Announces Multi-Billion Dollar Commitment to AI Infrastructure in Pennsylvania, CoreWeave, Jul 15, 2025
- CoreWeave Lancaster Greenfield site on the Power Map, from Epoch AI, "AI data centers" (CC BY 4.0), retrieved November 10, 2026
More projects
Keep reading the Ledger
Three more projects, the same operator first.
The whole Ledger