Lancaster, announced against built

Lancaster is an SI compute project in Lancaster, Pennsylvania, by CoreWeave, Chirisa Technology Parks and Machine Investment Group. The announced figure is initial 100 MW data center, from CoreWeave (Jul 15, 2025). Epoch AI tracks the site as under construction, with no building operating as of July 13, 2026. Its state today: under construction.

Announced
100 MW
Energized
NoneJul 13, 2026
State
Under construction
Source links
2

Announced

What was said, and when

Each row is one public announcement about Lancaster: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

  1. Company statement

    CoreWeave

    CoreWeave Announces Multi-Billion Dollar Commitment to AI Infrastructure in Pennsylvania

    CoreWeave says it intends to commit up to $6 billion to a new data center in Lancaster.

    “The initial 100 megawatt (MW) data center”
    “with potential to expand to 300 MW”
    Power or capacity stated
    Initial 100 MW; potential to expand to 300 MW
    Promised
    None stated
Not counted

The larger figure, potential to expand to 300 MW (CoreWeave, Jul 15, 2025), is stated as an upper limit or an ambition. It is listed here and left out of the Ledger's total.

Built

What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

Under construction

Epoch AI tracks the site as under construction, with no building operating as of July 13, 2026.

  1. Epoch AI estimate

    Epoch AI · Power Map

    CoreWeave Lancaster Greenfield site on the Power Map

    Epoch AI tracks CoreWeave Lancaster Greenfield site as under construction: no building is operating as of July 13, 2026.

    Cooling install continues on the roof, satellite imagery indicates that not all units have been completed. Continued presence of construction vehicles and unfinished land on the campus suggests that the building is not operational yet.
    IT power running
    None
    Whole facility
    None

    Epoch AI projects 92 MW of IT power by June 30, 2027. A projection, not a fact yet.

Heat Watch

CoreWeave Lancaster Greenfield site: heat seen from space

Over the last three summers NASA's MODIS read the ground here +2.7 °C against the land 5 to 10 km around it by day.

Timeline

Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

  1. CoreWeave: Initial 100 MW; potential to expand to 300 MW.Announcement · CoreWeave

  2. CoreWeave Lancaster Greenfield site: 0 buildings operating, no IT power yet.Evidence · Epoch AI, on the Power Map

  3. CoreWeave Lancaster Greenfield site: 0 buildings operating, no IT power yet.Evidence · Epoch AI, on the Power Map

Corrections

See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

File a correction

Sign in with your SI Passport to file a correction. It is a free message signature and never moves tokens.

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

  • Loading the corrections on file.

Sources

Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.