Power Map · Operating

Google Mesa, Mesa

Google Mesa is an SI data center in Mesa, Arizona, United States, owned by Google. Epoch AI estimates its IT power at 183 MW as of August 15, 2026, with 2 buildings operating. Its public timeline starts on July 1, 2023.

IT power
183 MWAug 15, 2026
Facility power
237 MW
Status
Operating
Buildings operating
2

Where it is

The site and its facts

Google Mesa on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Mesa, Arizona, United StatesOpen in OpenStreetMap
Place
Mesa, Arizona, United States
Address
Not public
Coordinates
33.3546° N, 111.6759° W
Owner
Google
Chips
TPU v6e, TPU v5p
Compute
About 289,540 H100 equivalentsEpoch AI estimate, Aug 15, 2026

Heat Watch

Google Mesa: heat seen from space

Over the last three summers NASA's MODIS read the ground here -1.1 °C against the land 5 to 10 km around it by day.

Lights On

Google Mesa: light at night

NASA's night imagery read 83.7 of 100 over this site in October 2026, against 62.0 in October 2018, the first month read. Against a year before: +0.4 points. The place was already bright at the first reading, so growth is harder to see. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on Google Mesa, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Land clearing begins for the entire site.

    No IT power yet0 operating

  2. Building 1 is operational. This is based on the state of construction on 2025-03-02 as seen on Google Earth, where building shell and external components seems to have been completed, but there is still a lot of construction equipment present. That equipment appears to have been cleared up by this date, 4 months later, with the 2025-09-07 satellite imagery providing an upper bound. Construction has begun on the Building 2 roof, with work beginning on the areas for cooling and generators as well.

    90 MW1 operating

  3. Building 2 roof is mostly completed. Building 2's backup generators are almost complete, and cooling is a little more than halfway complete. The Building 2 substation is also under construction.

    90 MW1 operating

  4. Building 2 is close to being operational. There is only construction left on the backup generators, which are almost complete. Some equipment is also strewn around the building, especially near the air-cooled chillers. Preparation seems to have begun for Building 3 at the site.

    90 MW1 operating

  5. Building 2 is operational. This is estimated based on the close-to-complete construction status from May 2026.

    183 MW2 operating

Adopt a site

Watch Google Mesa

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Sources

Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

Questions

Google Mesa, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is Google Mesa?

Google Mesa is in Mesa, Arizona, United States. Epoch AI publishes its coordinates as 33.3546, -111.6759.

Who owns Google Mesa?

Epoch AI lists Google as its owner.

How much power does Google Mesa use?

Epoch AI estimates its IT power at 183 MW as of August 15, 2026, and its total facility power at 237 MW.

Is Google Mesa operating?

Yes. Epoch AI counts 2 buildings operating as of August 15, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).