Power Map · Operating, expanding
Stream Phoenix, Goodyear
Stream Phoenix is an SI data center in Goodyear, Arizona, United States. Epoch AI estimates its IT power at 64 MW as of May 1, 2026, with 1 building operating, and projects 220 MW by January 1, 2030. Its public timeline starts on October 30, 2022.
- IT power
- 64 MWMay 1, 2026
- Facility power
- 77 MW
- Status
- Operating, expanding
- Buildings operating
- 1
Where it is
The site and its facts
Stream Phoenix on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Goodyear, Arizona, United States
- Address
- 2950 S. Litchfield Road
- Coordinates
- 33.4127° N, 112.3601° W
- Owner
- Not public
- Chips
- H100
- Compute
- About 46,134 H100 equivalentsEpoch AI estimate, May 1, 2026
- Projected
- 220 MW IT power by January 1, 2030Epoch AI projection, not a fact yet
Heat Watch
Stream Phoenix: heat seen from space
Over the last three summers NASA's MODIS read the ground here +0.7 °C against the land 5 to 10 km around it by day.
Lights On
Stream Phoenix: light at night
NASA's night imagery read 75.5 of 100 over this site in October 2026, against 29.7 in October 2018, the first month read. Against a year before: +3.3 points. The place was already bright at the first reading, so growth is harder to see. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on Stream Phoenix, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
Construction beginning, as can be seen on satellite. Major renovations on western side of the non AI building (PX1), including adding generators and cooling towers.
No IT power yet0 operating
Major construction has finished on AI building 1, and AI building 6 has been expedited, as depicted by satellite imagery.
No IT power yet0 operating
Estimated: AI building 1 should be operational. Major construction work finished by January 31, 2026, and the shell looked complete by that date. We estimate after three months the building will be operational.
64 MW1 operating
Although official promotional sources estimate the campus to be fully operational in 10-12 years, it is likely to be finished sooner than this given the empirical durations for other data center campuses as well as because AI building 6 has been expedited. The first AI building took approximately 24 months to complete. Assuming construction for a new building starts midway for every building, then the campus will be complete in 4 years for the 5 remaining buildings, since AI buildings 2 and 6 are both underway.
220 MW6 operating
Adopt a site
Watch Stream Phoenix
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- Official page for the data center.
- Official pre-construction planning document.
- Epoch AI, "AI data centers", the record for Stream Phoenix (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
1 km away
Microsoft Goodyear
Goodyear, Arizona, United States
202 MW IT power
64 km away
Google Mesa
Mesa, Arizona, United States
183 MW IT power
536 km away
Meta Los Lunas
Los Lunas, New Mexico, United States
118 MW IT power
560 km away
OpenAI Stargate New Mexico
Santa Teresa, New Mexico, United States
IT power not stated
Questions
Stream Phoenix, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is Stream Phoenix?
Stream Phoenix is in Goodyear, Arizona, United States, at 2950 S. Litchfield Road. Epoch AI publishes its coordinates as 33.4127, -112.3601.
Who owns Stream Phoenix?
Epoch AI does not name an owner yet.
How much power does Stream Phoenix use?
Epoch AI estimates its IT power at 64 MW as of May 1, 2026, and its total facility power at 77 MW. It projects 220 MW of IT power by January 1, 2030.
Is Stream Phoenix operating?
Yes, and it is growing. Epoch AI counts 1 building operating as of May 1, 2026, with more capacity on its timeline.
Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).