OpenAI Stargate New Mexico is an SI data center in Santa Teresa, New Mexico, United States, owned by Oracle and used by OpenAI. Epoch AI tracks it as under construction: no building is operating yet as of June 22, 2026, and projects 1,750 MW by December 31, 2028. Its public timeline starts on October 1, 2025.

IT power
Not statedEpoch AI
Facility power
Not stated
Status
Under construction
Buildings operating
0

Where it is

The site and its facts

OpenAI Stargate New Mexico on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Santa Teresa, New Mexico, United StatesOpen in OpenStreetMap
Place
Santa Teresa, New Mexico, United States
Address
Not public
Coordinates
31.8203° N, 106.6843° W
Owner
Oracle
Users
OpenAI
Project
Stargate
Energy
Bloom Energy
Projected
1,750 MW IT power by December 31, 2028Epoch AI projection, not a fact yet

The Gigawatt Ledger · Under construction

Stargate Doña Ana County: announced against built

No power figure was announced for this project. Epoch AI tracks the site as under construction, with no building operating as of June 22, 2026.

Heat Watch

OpenAI Stargate New Mexico: heat seen from space

Over the last three summers NASA's MODIS read the ground here -0.7 °C against the land 5 to 10 km around it by day.

Lights On

OpenAI Stargate New Mexico: light at night

NASA's night imagery read 32.5 of 100 over this site in October 2026, against 3.1 in October 2018, the first month read. Against a year before: +27.0 points. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on OpenAI Stargate New Mexico, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Construction and land clearing begins

    No IT power yet0 operating

  2. Land clearing continues, foundation construction begins 2 of the main buildings (Building B & D). Construction also beginning on modular chiller plants.

    No IT power yet0 operating

  3. Construction has advanced significantly since February 2026. We observe extensive earthworks and multiple graded building pads across the campus, with structural work underway on the main data center buildings. A large solar array and water storage basins are visible on site, and two cleared areas on the western side of the campus, likely for on-site power generation. No buildings appear operational yet (no completed roofs or signs of active cooling), consistent with the projected 2028 completion.

    No IT power yet0 operating

  4. Estimated construction completion date of the site. Stormwater permitting says 2027-12-31 for stormwater construction to finish, but for a more conservative estimate and based on the current state of the site, we pushed the final date by a year beyond it. Source, page 2

    1,750 MW4 operating

Adopt a site

Watch OpenAI Stargate New Mexico

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Sources

Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

Questions

OpenAI Stargate New Mexico, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is OpenAI Stargate New Mexico?

OpenAI Stargate New Mexico is in Santa Teresa, New Mexico, United States. Epoch AI publishes its coordinates as 31.8203, -106.6843.

Who owns OpenAI Stargate New Mexico?

Epoch AI lists Oracle as its owner and OpenAI as its user.

How much power does OpenAI Stargate New Mexico use?

No building is operating yet, so Epoch AI states no IT power for it today. It projects 1,750 MW of IT power by December 31, 2028.

Is OpenAI Stargate New Mexico operating?

Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).