OpenAI Stargate New Mexico is an SI data center in Santa Teresa, New Mexico, United States, owned by Oracle and used by OpenAI. Epoch AI tracks it as under construction: no building is operating yet as of June 22, 2026, and projects 1,750 MW by December 31, 2028. Its public timeline starts on October 1, 2025.
- IT power
- Not statedEpoch AI
- Facility power
- Not stated
- Status
- Under construction
- Buildings operating
- 0
Where it is
The site and its facts
OpenAI Stargate New Mexico on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Santa Teresa, New Mexico, United States
- Address
- Not public
- Coordinates
- 31.8203° N, 106.6843° W
- Owner
- Oracle
- Users
- OpenAI
- Project
- Stargate
- Energy
- Bloom Energy
- Projected
- 1,750 MW IT power by December 31, 2028Epoch AI projection, not a fact yet
The Gigawatt Ledger · Under construction
Stargate Doña Ana County: announced against built
No power figure was announced for this project. Epoch AI tracks the site as under construction, with no building operating as of June 22, 2026.
Heat Watch
OpenAI Stargate New Mexico: heat seen from space
Over the last three summers NASA's MODIS read the ground here -0.7 °C against the land 5 to 10 km around it by day.
Lights On
OpenAI Stargate New Mexico: light at night
NASA's night imagery read 32.5 of 100 over this site in October 2026, against 3.1 in October 2018, the first month read. Against a year before: +27.0 points. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on OpenAI Stargate New Mexico, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
Construction and land clearing begins
No IT power yet0 operating
Land clearing continues, foundation construction begins 2 of the main buildings (Building B & D). Construction also beginning on modular chiller plants.
No IT power yet0 operating
Construction has advanced significantly since February 2026. We observe extensive earthworks and multiple graded building pads across the campus, with structural work underway on the main data center buildings. A large solar array and water storage basins are visible on site, and two cleared areas on the western side of the campus, likely for on-site power generation. No buildings appear operational yet (no completed roofs or signs of active cooling), consistent with the projected 2028 completion.
No IT power yet0 operating
Estimated construction completion date of the site. Stormwater permitting says 2027-12-31 for stormwater construction to finish, but for a more conservative estimate and based on the current state of the site, we pushed the final date by a year beyond it. Source, page 2
1,750 MW4 operating
Adopt a site
Watch OpenAI Stargate New Mexico
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- Project Jupiter Website
- Stormwater Permitting
- Oracle, BorderPlex and Bloom Energy to power Project Jupiter with fuel cell technology (Apr 27, 2026)
- Epoch AI, "AI data centers", the record for OpenAI Stargate New Mexico (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
335 km away
Meta Los Lunas
Los Lunas, New Mexico, United States
118 MW IT power
498 km away
Google Mesa
Mesa, Arizona, United States
183 MW IT power
547 km away
Anthropic Barber Lake
Colorado City, Texas, United States
IT power not stated
560 km away
Stream Phoenix
Goodyear, Arizona, United States
64 MW IT power
Questions
OpenAI Stargate New Mexico, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is OpenAI Stargate New Mexico?
OpenAI Stargate New Mexico is in Santa Teresa, New Mexico, United States. Epoch AI publishes its coordinates as 31.8203, -106.6843.
Who owns OpenAI Stargate New Mexico?
Epoch AI lists Oracle as its owner and OpenAI as its user.
How much power does OpenAI Stargate New Mexico use?
No building is operating yet, so Epoch AI states no IT power for it today. It projects 1,750 MW of IT power by December 31, 2028.
Is OpenAI Stargate New Mexico operating?
Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.
Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).