Power Map · Operating, expanding

Huawei Wuhu, Wuhu

Huawei Wuhu is an SI data center in Wuhu, Anhui, China, owned by Huawei. Epoch AI estimates its IT power at 197 MW as of November 1, 2026, with 5 buildings operating, and projects 453 MW by December 1, 2027. Its public timeline starts on January 1, 2023.

IT power
197 MWNov 1, 2026
Facility power
256 MW
Status
Operating, expanding
Buildings operating
5

Where it is

The site and its facts

Huawei Wuhu on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Wuhu, Anhui, ChinaOpen in OpenStreetMap
Place
Wuhu, Anhui, China
Address
Wuhu, China
Coordinates
31.2918° N, 118.2998° E
Owner
Huawei
Chips
Ascend 910C, H20, Ascend 910B, Ascend 950PR
Compute
About 52,831 H100 equivalentsEpoch AI estimate, Nov 1, 2026
Projected
453 MW IT power by December 1, 2027Epoch AI projection, not a fact yet

Heat Watch

Huawei Wuhu: heat seen from space

Over the last three summers NASA's MODIS read the ground here -3.4 °C against the land 5 to 10 km around it by day, a change of +1.8 °C since before work on this build began.

Lights On

Huawei Wuhu: light at night

NASA's night imagery read 4.0 of 100 over this site in October 2026, against 2.0 in October 2018, the first month read. Against a year before: -0.3 points. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on Huawei Wuhu, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Land clearing begins, with the east campus being the first of the three. Land clearing begins for the other two campuses months after.

    No IT power yet0 operating

  2. The first building is operational. On the north campus, building 4 is operational assuming a 3-month fit-out post structural completion. We multiply each building's estimated capacity by an assumed 65% rack occupancy rate. This is close to the ~62 to 64% reported for Wuhu and other national data center hubs in 2023, and matches Anhui's 65% target for the Wuhu cluster. Occupied capacity is assumed to be all AI chips.

    44 MW1 operating

  3. Three buildings are operational. On the west campus, building 1 is operational, and on the east campus, building 7 is operational. The second building on the east campus has installed generators, but as of 2026 does not have the cooling sufficient for AI. Assumes a 3-month fit-out post structural completion. As with the other buildings, we assume 65% rack occupancy.

    118 MW3 operating

  4. Four buildings are operational. On the west campus, building 2 is operational assuming a 3-month fit-out post structural completion. As with the other buildings, we assume 65% rack occupancy.

    156 MW4 operating

  5. Four buildings are operational in total. A fifth building, building 5 on the north campus, is finishing installing roofside cooling. Another building on the east campus is complete but does not have sufficient cooling for AI despite its backup generators. The remaining three buildings, one per campus, have not begun construction.

    156 MW4 operating

  6. Four buildings are operational. On the north campus, building 5 is nearing structural completion but still has roofing and cooling remaining.

    156 MW4 operating

  7. On the north campus, building 5 is structurally complete but not operational as seen by barricades and no parked cars. Building 6, a much larger building across the pond, should finish construction in approximately one month, given that it is structurally complete and 75% of its cooling looks to be installed. On the east campus, building 9 is under construction.

    156 MW4 operating

  8. Five buildings are operational. On the north campus, building 5 is operational assuming a 3-month fit-out post structural completion. As with the other buildings, we assume 65% rack occupancy.

    197 MW5 operating

  9. Six buildings are operational. On the north campus, building 6, the larger building, is operational assuming a 3-month fit-out if it is structurally complete in September. We assume Building 6 is about 3.7x more power than one of the previous buildings, based on the size and quantity of cooling and backup generator equipment observed in satellite imagery. As with the other buildings, we assume 65% rack occupancy.

    360 MW6 operating

  10. All eight AI buildings are operational. Buildings 3 and 9 are assumed to be 1.25x the power and compute of buildings 1 and 7 based on the sizing of the backup generator enclosures; building 8 is excluded due to insufficient cooling. The time from observed land-clearing to operational is 23-26 months based on previous buildings. As with the other buildings, we assume 65% rack occupancy.

    453 MW8 operating

Adopt a site

Watch Huawei Wuhu

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Sources

Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

  • Epoch AI, "AI data centers", the record for Huawei Wuhu (CC BY 4.0), retrieved November 10, 2026

Questions

Huawei Wuhu, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is Huawei Wuhu?

Huawei Wuhu is in Wuhu, Anhui, China, at Wuhu, China. Epoch AI publishes its coordinates as 31.2918, 118.2998.

Who owns Huawei Wuhu?

Epoch AI lists Huawei as its owner.

How much power does Huawei Wuhu use?

Epoch AI estimates its IT power at 197 MW as of November 1, 2026, and its total facility power at 256 MW. It projects 453 MW of IT power by December 1, 2027.

Is Huawei Wuhu operating?

Yes, and it is growing. Epoch AI counts 5 buildings operating as of November 1, 2026, with more capacity on its timeline.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).