Meta Bowling Green, Bowling Green
Meta Bowling Green is an SI data center in Bowling Green, Ohio, United States, owned by Meta and used by Meta. Epoch AI tracks it as under construction: no building is operating yet as of July 30, 2026, and projects 422 MW by January 1, 2028. Its public timeline starts on November 1, 2024.
- IT power
- Not statedEpoch AI
- Facility power
- Not stated
- Status
- Under construction
- Buildings operating
- 0
Where it is
The site and its facts
Meta Bowling Green on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Bowling Green, Ohio, United States
- Address
- 12356 Middleton Pike, Bowling Green, OH 43402
- Coordinates
- 41.4673° N, 83.6361° W
- Owner
- Meta
- Users
- Meta
- Energy
- Williams
- Projected
- 422 MW IT power by January 1, 2028Epoch AI projection, not a fact yet
Heat Watch
Meta Bowling Green: heat seen from space
Over the last three summers NASA's MODIS read the ground here +0.4 °C against the land 5 to 10 km around it by day.
Lights On
Meta Bowling Green: light at night
NASA's night imagery read 20.5 of 100 over this site in October 2026, against 6.0 in October 2018, the first month read. Against a year before: +3.8 points. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on Meta Bowling Green, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
Land clearing begins.
No IT power yet0 operating
Buildings 1 and 2 under construction. Building 1's chillers are almost all in place, while only half of Building 2's are. Optimus substation, which is the substation on site, and the expansion of Dowling Substation, an existing substation to the northeast of the data center, appear complete.
No IT power yet0 operating
Roofs of Buildings 1 and 2 are more than halfway complete. All chillers for both buildings are visible. Construction on Buildings 3 and 4 has begun, with outlines laid. Construction on the Apollo Power Generation Project (a BTM power plant built just to the east of the data center) is in progress, with foundations poured and generation equipment being set in place.
No IT power yet0 operating
Building 1 is operational, based on a 5 month extrapolation from its roof completion date.
86 MW1 operating
Building 2 is operational, based on construction progress as of Sep 2026 and foundations being laid around 2 months after Building 1.
163 MW2 operating
Buildings 3 and 4 are operational, based on their construction starting 11 months after Building 1. We assume they are powered by the 350 MW Apollo Power Generation Project.
422 MW4 operating
Adopt a site
Watch Meta Bowling Green
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- Meta letter to Middleton Township
- Construction notice for new transmission lines to data center substation
- Ohio Power Siting Board announcement
- Apollo Power Generation Project Letter of Notice Appendix A, with a project timeline
- Epoch AI, "AI data centers", the record for Meta Bowling Green (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
76 km away
OpenAI Stargate Michigan
Benton, Michigan, United States
IT power not stated
128 km away
Google Fort Wayne
Fort Wayne, Indiana, United States
IT power not stated
169 km away
AWS New Albany
New Albany, Ohio, United States
213 MW IT power
171 km away
Meta Prometheus
New Albany, Ohio, United States
471 MW IT power
Questions
Meta Bowling Green, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is Meta Bowling Green?
Meta Bowling Green is in Bowling Green, Ohio, United States, at 12356 Middleton Pike, Bowling Green, OH 43402. Epoch AI publishes its coordinates as 41.4673, -83.6361.
Who owns Meta Bowling Green?
Epoch AI lists Meta as its owner and Meta as its user.
How much power does Meta Bowling Green use?
No building is operating yet, so Epoch AI states no IT power for it today. It projects 422 MW of IT power by January 1, 2028.
Is Meta Bowling Green operating?
Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.
Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).