1. Home
  2. Power Map
  3. Meta Cheyenne

Power Map · Operating, expanding

Meta Cheyenne, Cheyenne

Meta Cheyenne is an SI data center in Cheyenne, Wyoming, United States, owned by Meta and used by Meta. Epoch AI estimates its IT power at 152 MW as of July 25, 2026, with 2 buildings operating, and projects 207 MW by February 15, 2027. Its public timeline starts on April 1, 2024.

IT power
152 MWJul 25, 2026
Facility power
182 MW
Status
Operating, expanding
Buildings operating
2

Where it is

The site and its facts

Meta Cheyenne on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Cheyenne, Wyoming, United StatesOpen in OpenStreetMap
Place
Cheyenne, Wyoming, United States
Address
Cheyenne, WY 82007, USA
Coordinates
41.0801° N, 104.8241° W
Owner
Meta
Users
Meta
Chips
B300
Compute
About 172,815 H100 equivalentsEpoch AI estimate, Jul 25, 2026
Projected
207 MW IT power by February 15, 2027Epoch AI projection, not a fact yet

Heat Watch

Meta Cheyenne: heat seen from space

Over the last three summers NASA's MODIS read the ground here -0.4 °C against the land 5 to 10 km around it by day.

Lights On

Meta Cheyenne: light at night

NASA's night imagery read 32.7 of 100 over this site in October 2026, against 7.1 in October 2018, the first month read. Against a year before: +17.8 points. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on Meta Cheyenne, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Land clearing begins.

    No IT power yet0 operating

  2. Structure for Building 1 and 2 under construction.

    No IT power yet0 operating

  3. Building 1 shell and cooling looks complete, Building 2 roof almost complete.

    No IT power yet0 operating

  4. Both buildings estimated to be operational.

    152 MW2 operating

  5. Buildings 3 and 4 are similar in style and size to the ones seen at the Prometheus site, we estimate their operability based on that timeline.

    207 MW4 operating

Adopt a site

Watch Meta Cheyenne

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Sources

Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

Questions

Meta Cheyenne, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is Meta Cheyenne?

Meta Cheyenne is in Cheyenne, Wyoming, United States, at Cheyenne, WY 82007, USA. Epoch AI publishes its coordinates as 41.0801, -104.8241.

Who owns Meta Cheyenne?

Epoch AI lists Meta as its owner and Meta as its user.

How much power does Meta Cheyenne use?

Epoch AI estimates its IT power at 152 MW as of July 25, 2026, and its total facility power at 182 MW. It projects 207 MW of IT power by February 15, 2027.

Is Meta Cheyenne operating?

Yes, and it is growing. Epoch AI counts 2 buildings operating as of July 25, 2026, with more capacity on its timeline.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).