Power Map · Operating

Microsoft Project Osmium, Cumming

Microsoft Project Osmium is an SI data center in Cumming, Iowa, United States, owned by Microsoft and used by OpenAI (Epoch AI rates this speculative). Epoch AI estimates its IT power at 190 MW as of June 16, 2026, with 4 buildings operating. Its public timeline starts on December 18, 2018.

IT power
190 MWJun 16, 2026
Facility power
228 MW
Status
Operating
Buildings operating
4

Where it is

The site and its facts

Microsoft Project Osmium on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Cumming, Iowa, United StatesOpen in OpenStreetMap
Place
Cumming, Iowa, United States
Address
5855 SW Kerry St, Cumming, IA 50061
Coordinates
41.4970° N, 93.7894° W
Owner
Microsoft
Users
OpenAI (Epoch AI rates this speculative)
Chips
A100, H100, B200
Compute
About 155,634 H100 equivalentsEpoch AI estimate, Jun 16, 2026

Heat Watch

Microsoft Project Osmium: heat seen from space

Over the last three summers NASA's MODIS read the ground here -0.1 °C against the land 5 to 10 km around it by day, a change of +0.2 °C since before work on this build began.

Lights On

Microsoft Project Osmium: light at night

NASA's night imagery read 24.2 of 100 over this site in October 2026, against 1.5 in October 2018, the first month read. Against a year before: -5.0 points. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on Microsoft Project Osmium, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Land clearing begins on the north part of the site

    No IT power yet0 operating

  2. Building 1 and 1st building on the site are operational. Foundation work begins on Building 2

    48 MW1 operating

  3. Building 2 is operational. Estimated based on Microsoft H100 count 2023

    95 MW2 operating

  4. Building 3-4 operational, no visible construction.

    190 MW4 operating

  5. Site already complete.

    190 MW4 operating

  6. No notable changes since October.

    190 MW4 operating

Adopt a site

Watch Microsoft Project Osmium

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Sources

Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

Questions

Microsoft Project Osmium, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is Microsoft Project Osmium?

Microsoft Project Osmium is in Cumming, Iowa, United States, at 5855 SW Kerry St, Cumming, IA 50061. Epoch AI publishes its coordinates as 41.4970, -93.7894.

Who owns Microsoft Project Osmium?

Epoch AI lists Microsoft as its owner and OpenAI (Epoch AI rates this speculative) as its user.

How much power does Microsoft Project Osmium use?

Epoch AI estimates its IT power at 190 MW as of June 16, 2026, and its total facility power at 228 MW.

Is Microsoft Project Osmium operating?

Yes. Epoch AI counts 4 buildings operating as of June 16, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).