Power Map · Under construction
QTS Cedar Rapids, Cedar Rapids
QTS Cedar Rapids is an SI data center in Cedar Rapids, Iowa, United States, owned by Meta (Epoch AI rates this speculative) and used by Meta (Epoch AI rates this speculative). Epoch AI tracks it as under construction: no building is operating yet as of October 23, 2026, and projects 1,133 MW by November 15, 2027. Its public timeline starts on January 17, 2025.
- IT power
- Not statedEpoch AI
- Facility power
- Not stated
- Status
- Under construction
- Buildings operating
- 0
Where it is
The site and its facts
QTS Cedar Rapids on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Cedar Rapids, Iowa, United States
- Address
- 6200 76th Ave SW, Fairfax, IA 52228
- Coordinates
- 41.9095° N, 91.7429° W
- Owner
- Meta (Epoch AI rates this speculative)
- Users
- Meta (Epoch AI rates this speculative)
- Energy
- Alliant Energy
- Projected
- 1,133 MW IT power by November 15, 2027Epoch AI projection, not a fact yet
Heat Watch
QTS Cedar Rapids: heat seen from space
Over the last three summers NASA's MODIS read the ground here +0.3 °C against the land 5 to 10 km around it by day.
Lights On
QTS Cedar Rapids: light at night
NASA's night imagery read 58.4 of 100 over this site in October 2026, against 2.7 in October 2018, the first month read. Against a year before: +29.8 points. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on QTS Cedar Rapids, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
Land clearing begins for Building 1-3.
No IT power yet0 operating
Building 1 roof complete, with air-cooled chillers in place. Building 2 and 3 roofs are partly completed. Building 4 and 5 have a foundation.
No IT power yet0 operating
Based on satellite imagery, the Buildings 1-3 shells look complete. Buildings 4-6 are far along, with roofs largely in place, while the eastern Building 7 foundation is well underway. No buildings operational yet.
No IT power yet0 operating
Similar to April, Buildings 1-3 shells look complete. Buildings 4-6 are still far along, and the eastern Building 7 foundation is still underway.
No IT power yet0 operating
Buildings 1 to 3 look externally complete, with the air-cooled chillers fully installed, and surrounding yard work cleared. The many cars and trucks parked beside the buildings suggest commissioning is still underway, so we’re not counting any buildings operational yet. Buildings 4-6 shells appear complete, and Building 7 is nearly 90% roofed. This is based on high-resolution satellite imagery from this date.
No IT power yet0 operating
Buildings 1-3 are operational. Based on the visible progress in the October satellite image, and the expected completion date reported by local news: “A QTS spokesperson said in July [2025] that the first phase of the project was expected to be completed in late 2026."
448 MW3 operating
Buildings 4-7 are operational. Based on the expected completion date reported by local news: “A QTS spokesperson said in July [2025] that [...] The second phase is expected to be completed in late 2027."
1,133 MW7 operating
Adopt a site
Watch QTS Cedar Rapids
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- MISO new load announcements
- Article by The Gazette
- Article by Corridor Business Journal
- Post by GLD Commercial
- Post by SemiAnalysis
- Epoch AI, "AI data centers", the record for QTS Cedar Rapids (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
2 km away
Google Cedar Rapids
Cedar Rapids, Iowa, United States
IT power not stated
176 km away
Microsoft Project Osmium
Cumming, Iowa, United States
190 MW IT power
326 km away
Microsoft Fairwater Wisconsin
Mount Pleasant, Wisconsin, United States
369 MW IT power
332 km away
Meta Rosemount
Rosemount, Minnesota, United States
178 MW IT power
Questions
QTS Cedar Rapids, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is QTS Cedar Rapids?
QTS Cedar Rapids is in Cedar Rapids, Iowa, United States, at 6200 76th Ave SW, Fairfax, IA 52228. Epoch AI publishes its coordinates as 41.9095, -91.7429.
Who owns QTS Cedar Rapids?
Epoch AI lists Meta (Epoch AI rates this speculative) as its owner and Meta (Epoch AI rates this speculative) as its user.
How much power does QTS Cedar Rapids use?
No building is operating yet, so Epoch AI states no IT power for it today. It projects 1,133 MW of IT power by November 15, 2027.
Is QTS Cedar Rapids operating?
Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.
Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).