Power Map · Under construction
Google Cedar Rapids, Cedar Rapids
Google Cedar Rapids is an SI data center in Cedar Rapids, Iowa, United States, owned by Google and used by Google DeepMind (Epoch AI rates this speculative). Epoch AI tracks it as under construction: no building is operating yet as of April 16, 2026, and projects 261 MW by May 23, 2027. Its public timeline starts on June 14, 2024.
- IT power
- Not statedEpoch AI
- Facility power
- Not stated
- Status
- Under construction
- Buildings operating
- 0
Where it is
The site and its facts
Google Cedar Rapids on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Cedar Rapids, Iowa, United States
- Address
- 5800 EDGEWOOD RD SW CEDAR RAPIDS, IA 52404
- Coordinates
- 41.9170° N, 91.7224° W
- Owner
- Users
- Google DeepMind (Epoch AI rates this speculative)
- Projected
- 261 MW IT power by May 23, 2027Epoch AI projection, not a fact yet
Heat Watch
Google Cedar Rapids: heat seen from space
Over the last three summers NASA's MODIS read the ground here +0.4 °C against the land 5 to 10 km around it by day.
Lights On
Google Cedar Rapids: light at night
NASA's night imagery read 59.4 of 100 over this site in October 2026, against 16.3 in October 2018, the first month read. Against a year before: +22.3 points. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on Google Cedar Rapids, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
Land clearing begins.
No IT power yet0 operating
Building 1 cooling towers and generators starting to be put in place. There's a foundation for Building 2 and 3.
No IT power yet0 operating
About half of Building 1 generators are in place. Building 2 roofing has started - about where Google Omaha Building 3 was on 2025-03-16.
No IT power yet0 operating
Building 1's generators are still only about halfway in place, and ~1/2 the cooling towers are still under construction. Building 2 roofing has been completed, and visible foundations have been built for cooling towers and generators.
No IT power yet0 operating
Building 1 is operational. There is still work to be done since April, and Q4 2026 operational estimate was based on visible progress then.
87 MW1 operating
Building 2 is operational. Based on Google Omaha Building 3 taking about 14 months from starting the roof to operation.
174 MW2 operating
Building 3 is operational. Earlier satellite images suggest it was about 3 months behind Building 2.
261 MW3 operating
Adopt a site
Watch Google Cedar Rapids
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- MISO new load announcements
- Permit application
- Epoch AI, "AI data centers", the record for Google Cedar Rapids (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
2 km away
QTS Cedar Rapids
Cedar Rapids, Iowa, United States
IT power not stated
178 km away
Microsoft Project Osmium
Cumming, Iowa, United States
190 MW IT power
324 km away
Microsoft Fairwater Wisconsin
Mount Pleasant, Wisconsin, United States
369 MW IT power
331 km away
Meta Rosemount
Rosemount, Minnesota, United States
178 MW IT power
Questions
Google Cedar Rapids, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is Google Cedar Rapids?
Google Cedar Rapids is in Cedar Rapids, Iowa, United States, at 5800 EDGEWOOD RD SW CEDAR RAPIDS, IA 52404. Epoch AI publishes its coordinates as 41.9170, -91.7224.
Who owns Google Cedar Rapids?
Epoch AI lists Google as its owner and Google DeepMind (Epoch AI rates this speculative) as its user.
How much power does Google Cedar Rapids use?
No building is operating yet, so Epoch AI states no IT power for it today. It projects 261 MW of IT power by May 23, 2027.
Is Google Cedar Rapids operating?
Not yet. Epoch AI tracks it as under construction, with no building operating on its latest entry.
Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).