Built and announced
On the Power Map: operating, expanding, 946 MW of IT power running in 2 buildings as of Jun 15, 2026, per Epoch AI. Epoch AI's planned figure is 1.53 GW by Feb 25, 2027.
In the Gigawatt Ledger, Colossus has 2 GW announced and 1 to 1.7 GW confirmed energized (partly energized).