Gigawatt Ledger · Partly energized
Colossus, announced against built
Colossus (Memphis and Southaven) is an SI compute project in Memphis, Tennessee, by SpaceXAI. The announced figure is almost 2 GW of training compute, from Elon Musk, reported by SiliconANGLE (Dec 30, 2025). Public evidence puts 1 to 1.7 GW in operation as of June 15, 2026, against 2 GW announced: 50% to 85%. The range covers every figure listed below. Its state today: partly energized.
- Announced
- 2 GW
- Energized
- 1 to 1.7 GWJun 15, 2026
- State
- Partly energized
- Source links
- 5
Announced
What was said, and when
Each row is one public announcement about Colossus: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.
- Utility
Memphis Light, Gas and Water
xAI Update, May 5, 2025
The city utility reports what xAI receives and has asked for at its first site on Paul Lowry Road, and the options discussed for the second site on Tulane Road.
“xAI requested an additional 150MW at this location, for a total of 300MW.”
“a range of grid power options from 260MW to 1.1GW has been discussed”
- Power or capacity stated
- 300 MW requested at the first site; 260 MW to 1.1 GW discussed for the second
- Promised
- 300 MW at the first site by no later than December 2025
- Company statement, quoted by the press
Elon Musk, reported by SiliconANGLE
Elon Musk reveals plan to expand xAI's 'Colossus' data center to 2 gigawatts
SiliconANGLE quotes Elon Musk's post on X about a third building in Southaven, Mississippi. The figure is the company's own statement, so it is counted.
“xAI has bought a third building called MACROHARDRR. Will take xAI training compute to almost 2GW.”
- Power or capacity stated
- Almost 2 GW of training compute for the whole complex
- Promised
- The third building becomes a data center during 2026
Built
What public evidence confirms
What is on the ground today, from the Power Map data and from any statement or filing that states live power.
Public evidence puts 1 to 1.7 GW in operation as of June 15, 2026, against 2 GW announced: 50% to 85%. The range covers every figure listed below.
- Epoch AI estimate
Epoch AI · Power Map
Colossus 1 on the Power Map
Epoch AI counts 1 building operating at Colossus 1 and estimates 340 MW of IT power (425 MW for the whole facility) as of June 15, 2026.
No major changes to the data center since February. Solar panels have been placed next to the facility.
- IT power running
- 340 MW
- Whole facility
- 425 MW
- Epoch AI estimate
Epoch AI · Power Map
Colossus 2 on the Power Map
Epoch AI counts 2 buildings operating at Colossus 2 and estimates 946 MW of IT power (1,276 MW for the whole facility) as of June 15, 2026.
The site is estimated to have at least ~830 MW of GPU server power, with at least "at least 220,000 additional GB300 processors and over 400 additional megawatts of compute power", corresponding to the "next phase of expansion" found in the following company S-1 filing, page 76. This estimate is backed up by our cooling and turbine based power production calculations. The cooling calculations suggest there is enough infrastructure to support ~850MW of IT Power. Similarly the energy production calculations support ~900MW of available IT Power. This gives us confidence that the proposed expansion was achieved in time. The roof for building 3 is halfway complete.
- IT power running
- 946 MW
- Whole facility
- 1,276 MW
Epoch AI projects 1,531 MW of IT power by February 25, 2027. A projection, not a fact yet.
- Utility
Memphis Light, Gas and Water
xAI Update, May 5, 2025
The utility states the grid power it delivered to the first site on that date.
“xAI is receiving 150MW of power at the Paul Lowry site.”
- Power confirmed
- 150 MW
- Used in the total
- No, shown as history
- Public filing
Space Exploration Technologies Corp.
Form S-1 registration statement
The company's registration statement gives one figure for both facilities together.
“Our AI compute facilities, COLOSSUS and COLOSSUS II, collectively provide approximately 1.0 gigawatt of compute power”
- Power confirmed
- 1,000 MW
- Used in the total
- Yes
Seen from orbit · Compute Watch
The newest clear pass over the site
The image loads from NASA's public imagery: true color at 30 m per pixel, about 5 km across, north up.
Open Compute WatchHeat Watch
Colossus 1: heat seen from space
Over the last three summers NASA's MODIS read the ground here -0.4 °C against the land 5 to 10 km around it by day, a change of -0.0 °C since before work on this build began.
Heat Watch
Colossus 2: heat seen from space
Over the last three summers NASA's MODIS read the ground here +1.3 °C against the land 5 to 10 km around it by day.
Timeline
Announcements and evidence, by date
What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.
Memphis Light, Gas and Water: 300 MW requested at the first site; 260 MW to 1.1 GW discussed for the second. Promised: 300 MW at the first site by no later than December 2025.Announcement · MLGW
The utility states the grid power it delivered to the first site on that date.Evidence · MLGW
Colossus 2: 1 building operating, 239 MW of IT power.Evidence · Epoch AI, on the Power Map
Elon Musk, reported by SiliconANGLE: Almost 2 GW of training compute for the whole complex. Promised: the third building becomes a data center during 2026.Announcement · SiliconANGLE
Colossus 2: 1 building operating, 239 MW of IT power.Evidence · Epoch AI, on the Power Map
Colossus 1: 1 building operating, 340 MW of IT power.Evidence · Epoch AI, on the Power Map
Colossus 2: 1 building operating, 490 MW of IT power.Evidence · Epoch AI, on the Power Map
Colossus 1: 1 building operating, 340 MW of IT power.Evidence · Epoch AI, on the Power Map
The company's registration statement gives one figure for both facilities together.Evidence · U.S. Securities and Exchange Commission
Colossus 1: 1 building operating, 340 MW of IT power.Evidence · Epoch AI, on the Power Map
Colossus 1: 1 building operating, 340 MW of IT power.Evidence · Epoch AI, on the Power Map
Colossus 2: 2 buildings operating, 946 MW of IT power.Evidence · Epoch AI, on the Power Map
Corrections
See something wrong? File a correction
Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.
File a correction
Sign in with your SI Passport to file a correction. It is a free message signature and never moves tokens.
A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.
Corrections on file · 0
- Loading the corrections on file.
Sources
Every link behind this page
Read on November 11, 2026. An undated page carries the date it was read.
- xAI Update, May 5, 2025, MLGW, May 5, 2025
- Elon Musk reveals plan to expand xAI's 'Colossus' data center to 2 gigawatts, SiliconANGLE, Dec 30, 2025
- Form S-1 registration statement, U.S. Securities and Exchange Commission, May 20, 2026
- Colossus 1 on the Power Map, from Epoch AI, "AI data centers" (CC BY 4.0), retrieved November 10, 2026
- Colossus 2 on the Power Map, from Epoch AI, "AI data centers" (CC BY 4.0), retrieved November 10, 2026
More projects
Keep reading the Ledger
Three more projects, the same operator first.
The whole Ledger- Under construction
Meta Hyperion
Richland Parish, Louisiana
2 GW announced · nothing confirmed
Open the project - Under construction
Stargate Shackelford County (Frontier)
Shackelford County, Texas
1.4 GW announced · nothing confirmed
Open the project - Under construction
Stargate Michigan (Saline Township)
Saline Township, Michigan
1.38 GW announced · nothing confirmed
Open the project