Gigawatt Ledger · Partly energized

Colossus, announced against built

Colossus (Memphis and Southaven) is an SI compute project in Memphis, Tennessee, by SpaceXAI. The announced figure is almost 2 GW of training compute, from Elon Musk, reported by SiliconANGLE (Dec 30, 2025). Public evidence puts 1 to 1.7 GW in operation as of June 15, 2026, against 2 GW announced: 50% to 85%. The range covers every figure listed below. Its state today: partly energized.

Announced
2 GW
Energized
1 to 1.7 GWJun 15, 2026
State
Partly energized
Source links
5

Announced

What was said, and when

Each row is one public announcement about Colossus: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

  1. Utility

    Memphis Light, Gas and Water

    xAI Update, May 5, 2025

    The city utility reports what xAI receives and has asked for at its first site on Paul Lowry Road, and the options discussed for the second site on Tulane Road.

    “xAI requested an additional 150MW at this location, for a total of 300MW.”
    “a range of grid power options from 260MW to 1.1GW has been discussed”
    Power or capacity stated
    300 MW requested at the first site; 260 MW to 1.1 GW discussed for the second
    Promised
    300 MW at the first site by no later than December 2025
  2. Company statement, quoted by the press

    Elon Musk, reported by SiliconANGLE

    Elon Musk reveals plan to expand xAI's 'Colossus' data center to 2 gigawatts

    SiliconANGLE quotes Elon Musk's post on X about a third building in Southaven, Mississippi. The figure is the company's own statement, so it is counted.

    “xAI has bought a third building called MACROHARDRR. Will take xAI training compute to almost 2GW.”
    Power or capacity stated
    Almost 2 GW of training compute for the whole complex
    Promised
    The third building becomes a data center during 2026

Built

What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

Partly energized

Public evidence puts 1 to 1.7 GW in operation as of June 15, 2026, against 2 GW announced: 50% to 85%. The range covers every figure listed below.

  1. Epoch AI estimate

    Epoch AI · Power Map

    Colossus 1 on the Power Map

    Epoch AI counts 1 building operating at Colossus 1 and estimates 340 MW of IT power (425 MW for the whole facility) as of June 15, 2026.

    No major changes to the data center since February. Solar panels have been placed next to the facility.
    IT power running
    340 MW
    Whole facility
    425 MW
  2. Epoch AI estimate

    Epoch AI · Power Map

    Colossus 2 on the Power Map

    Epoch AI counts 2 buildings operating at Colossus 2 and estimates 946 MW of IT power (1,276 MW for the whole facility) as of June 15, 2026.

    The site is estimated to have at least ~830 MW of GPU server power, with at least "at least 220,000 additional GB300 processors and over 400 additional megawatts of compute power", corresponding to the "next phase of expansion" found in the following company S-1 filing, page 76. This estimate is backed up by our cooling and turbine based power production calculations. The cooling calculations suggest there is enough infrastructure to support ~850MW of IT Power. Similarly the energy production calculations support ~900MW of available IT Power. This gives us confidence that the proposed expansion was achieved in time. The roof for building 3 is halfway complete.
    IT power running
    946 MW
    Whole facility
    1,276 MW

    Epoch AI projects 1,531 MW of IT power by February 25, 2027. A projection, not a fact yet.

  3. Utility

    Memphis Light, Gas and Water

    xAI Update, May 5, 2025

    The utility states the grid power it delivered to the first site on that date.

    “xAI is receiving 150MW of power at the Paul Lowry site.”
    Power confirmed
    150 MW
    Used in the total
    No, shown as history
  4. Public filing

    Space Exploration Technologies Corp.

    Form S-1 registration statement

    The company's registration statement gives one figure for both facilities together.

    “Our AI compute facilities, COLOSSUS and COLOSSUS II, collectively provide approximately 1.0 gigawatt of compute power”
    Power confirmed
    1,000 MW
    Used in the total
    Yes
Loading the newest clear pass

Seen from orbit · Compute Watch

The newest clear pass over the site

The image loads from NASA's public imagery: true color at 30 m per pixel, about 5 km across, north up.

Open Compute Watch

Heat Watch

Colossus 1: heat seen from space

Over the last three summers NASA's MODIS read the ground here -0.4 °C against the land 5 to 10 km around it by day, a change of -0.0 °C since before work on this build began.

Heat Watch

Colossus 2: heat seen from space

Over the last three summers NASA's MODIS read the ground here +1.3 °C against the land 5 to 10 km around it by day.

Timeline

Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

  1. Memphis Light, Gas and Water: 300 MW requested at the first site; 260 MW to 1.1 GW discussed for the second. Promised: 300 MW at the first site by no later than December 2025.Announcement · MLGW

  2. The utility states the grid power it delivered to the first site on that date.Evidence · MLGW

  3. Colossus 2: 1 building operating, 239 MW of IT power.Evidence · Epoch AI, on the Power Map

  4. Elon Musk, reported by SiliconANGLE: Almost 2 GW of training compute for the whole complex. Promised: the third building becomes a data center during 2026.Announcement · SiliconANGLE

  5. Colossus 2: 1 building operating, 239 MW of IT power.Evidence · Epoch AI, on the Power Map

  6. Colossus 1: 1 building operating, 340 MW of IT power.Evidence · Epoch AI, on the Power Map

  7. Colossus 2: 1 building operating, 490 MW of IT power.Evidence · Epoch AI, on the Power Map

  8. Colossus 1: 1 building operating, 340 MW of IT power.Evidence · Epoch AI, on the Power Map

  9. The company's registration statement gives one figure for both facilities together.Evidence · U.S. Securities and Exchange Commission

  10. Colossus 1: 1 building operating, 340 MW of IT power.Evidence · Epoch AI, on the Power Map

  11. Colossus 1: 1 building operating, 340 MW of IT power.Evidence · Epoch AI, on the Power Map

  12. Colossus 2: 2 buildings operating, 946 MW of IT power.Evidence · Epoch AI, on the Power Map

Corrections

See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

File a correction

Sign in with your SI Passport to file a correction. It is a free message signature and never moves tokens.

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

  • Loading the corrections on file.

Sources

Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.