Colossus 2 is an SI data center in Memphis, Tennessee, United States, owned by SpaceXAI and used by Anthropic, Cursor, SpaceXAI. Epoch AI estimates its IT power at 946 MW as of June 15, 2026, with 2 buildings operating, and projects 1,531 MW by February 25, 2027. Its public timeline starts on February 28, 2025.
- IT power
- 946 MWJun 15, 2026
- Facility power
- 1,276 MW
- Status
- Operating, expanding
- Buildings operating
- 2
Where it is
The site and its facts
Colossus 2 on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Memphis, Tennessee, United States
- Address
- 5420 Tulane Rd, Memphis, TN 38109
- Coordinates
- 34.9893° N, 90.0386° W
- Owner
- SpaceXAI
- Users
- Anthropic, Cursor, SpaceXAI
- Chips
- B200, B300
- Compute
- About 1,111,673 H100 equivalentsEpoch AI estimate, Jun 15, 2026
- Projected
- 1,531 MW IT power by February 25, 2027Epoch AI projection, not a fact yet
Seen from orbit · Compute Watch
The newest clear pass over Colossus 2
The image loads from NASA's public imagery: true color at 30 m per pixel, about 5 km across, north up.
Open Compute WatchThe Gigawatt Ledger · Partly energized
Colossus: announced against built
2 GW was announced for this project. Public evidence puts 1 to 1.7 GW in operation as of June 15, 2026, against 2 GW announced: 50% to 85%. The range covers every figure listed below.
Heat Watch
Colossus 2: heat seen from space
Over the last three summers NASA's MODIS read the ground here +1.3 °C against the land 5 to 10 km around it by day.
Lights On
Colossus 2: light at night
NASA's night imagery read 78.0 of 100 over this site in October 2026, against 51.0 in October 2018, the first month read. Against a year before: +13.1 points. The place was already bright at the first reading, so growth is harder to see. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on Colossus 2, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
Land clearing begins next to the existing building.
No IT power yet0 operating
Battery facility connected to the building. 121 air-cooled chillers installed, which could support 200 MW. In the Duke faciltiy in nearby Mississippi, several natural gas turbines are in place but not fully connected up.
No IT power yet0 operating
Battery facility looks complete (though more might be added). Turbines look connected up, minimal construction around them. We believe this state corresponds to the first compute cluster brought online at this site of "approximately 110,000 GB200 processors, approximately 210 megawatts of compute power", as detailed in the company S-1 filing, page 76. Based on those numbers, we believe "compute power" corresponds to GPU server power. Earlier tweets from Elon Musk also support this timing, and it's consistent with the estimated cooling capacity based on the satellite image.
239 MW1 operating
Since October, an array of dry cooling air-cooled condensers has been added (the array of large fans to the left of the building), and appears almost complete. Two more similar arrays appear to be under construction. More air-cooled chillers, batteries, and gas turbines have also been installed.
239 MW1 operating
The first array of dry cooling air-cooled condensers for Building 1 has been completed and is operational. A second array, with larger fans, is about halfway complete (located to the south of the first array). More chillers have also been added. For Building 2, an array of dry cooling air-cooled condensers of the same type as Building 1's first array is beginning construction. We believe this corresponds to the "second cluster of 110,000 GB300 processors and 220 megawatts of compute power" from the company S-1 filing, page 76, with compute power corresponding to GPU server power. This is also consistent with our estimates based on cooling equipment.
490 MW1 operating
The site is estimated to have at least ~830 MW of GPU server power, with at least "at least 220,000 additional GB300 processors and over 400 additional megawatts of compute power", corresponding to the "next phase of expansion" found in the following company S-1 filing, page 76. This estimate is backed up by our cooling and turbine based power production calculations. The cooling calculations suggest there is enough infrastructure to support ~850MW of IT Power. Similarly the energy production calculations support ~900MW of available IT Power. This gives us confidence that the proposed expansion was achieved in time. The roof for building 3 is halfway complete.
946 MW2 operating
Building 3 is estimated to be completed. The site is predicted to have enough power infrastructure installed for a total of 1.5 GW of IT Power. Based on building plans we predict the addition of three more cooling arrays similar to the 6x24 dry coolers near Building 1 and 2. With the completion of current cooling structures and the addition of these arrays there will be ~540MW more cooling capacity for a full facility total of ~1390MW. If this cooling capacity is supplemented by mobile coolers, there would be enough cooling and power infrastructure to support 1.5 GW of IT power.
1,531 MW3 operating
Adopt a site
Watch Colossus 2
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- WSJ profile of the Colossus data centers
- Final GPU count reported by Elon Musk
- MLGW update mentioning power requests for Colossus 2
- SpaceX-Cursor partnership to use Colossus
- Anthropic to use Colossus 2 from June 2026
- SpaceX S-1 filing, mentioning exact compute and power for Colossus 2
- Epoch AI, "AI data centers", the record for Colossus 2 (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
13 km away
Colossus 1
Memphis, Tennessee, United States
340 MW IT power
266 km away
Amazon Madison Mega Site
Canton, Mississippi, United States
284 MW IT power
287 km away
Amazon Ridgeland
Ridgeland, Mississippi, United States
228 MW IT power
311 km away
Meta Huntsville
Huntsville, Alabama, United States
146 MW IT power
Questions
Colossus 2, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is Colossus 2?
Colossus 2 is in Memphis, Tennessee, United States, at 5420 Tulane Rd, Memphis, TN 38109. Epoch AI publishes its coordinates as 34.9893, -90.0386.
Who owns Colossus 2?
Epoch AI lists SpaceXAI as its owner and Anthropic, Cursor, SpaceXAI as its users.
How much power does Colossus 2 use?
Epoch AI estimates its IT power at 946 MW as of June 15, 2026, and its total facility power at 1,276 MW. It projects 1,531 MW of IT power by February 25, 2027.
Is Colossus 2 operating?
Yes, and it is growing. Epoch AI counts 2 buildings operating as of June 15, 2026, with more capacity on its timeline.