Built and announced
On the Power Map: operating, expanding, 471 MW of IT power running in 10 buildings as of Aug 31, 2026, per Epoch AI. Epoch AI's planned figure is 1.02 GW by Jul 1, 2028.
In the Gigawatt Ledger, Meta Prometheus has 1 GW announced and 471 to 612 MW confirmed energized (partly energized).