Gigawatt Ledger · Partly energized

Meta Prometheus, announced against built

Meta Prometheus is an SI compute project in New Albany, Ohio, by Meta. The announced figure is 1 gigawatt cluster, from Meta (Sep 29, 2025). Public evidence puts 471 to 612 MW in operation as of August 31, 2026, against 1 GW announced: 47% to 61%. The low end is the IT load, the high end the whole facility, because the announcement does not say which it means. Its state today: partly energized.

Announced
1 GW
Energized
471 to 612 MWAug 31, 2026
State
Partly energized
Source links
3

Announced

What was said, and when

Each row is one public announcement about Meta Prometheus: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

  1. Company statement, quoted by the press

    Mark Zuckerberg, reported by TechCrunch

    Mark Zuckerberg says Meta is building a 5GW AI data center

    TechCrunch reports Mark Zuckerberg's Threads post. A Meta spokesperson places Prometheus in New Albany, Ohio.

    “bring a 1 GW super cluster, called Prometheus, online in 2026”
    Power or capacity stated
    1 GW
    Promised
    Online in 2026
  2. Company statement

    Meta

    Meta's Infrastructure Evolution and the Advent of AI

    Meta's engineering blog describes Prometheus as a cluster spread over several buildings, tents and colocation halls in one region.

    “will be a 1-gigawatt cluster spanning across multiple data center buildings”
    Power or capacity stated
    1 GW cluster
    Promised
    None stated

Built

What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

Partly energized

Public evidence puts 471 to 612 MW in operation as of August 31, 2026, against 1 GW announced: 47% to 61%. The low end is the IT load, the high end the whole facility, because the announcement does not say which it means.

  1. Epoch AI estimate

    Epoch AI · Power Map

    Meta Prometheus on the Power Map

    Epoch AI counts 10 buildings operating at Meta Prometheus and estimates 471 MW of IT power (612 MW for the whole facility) as of August 31, 2026.

    Buildings 7-10 (tents) are operational, based on infrared drone video from RAAD (raad.com) captured on this date. The video suggests that 138.8 MW of nameplate turbine capacity is operating at the Socrates South power plant (about 69% of the 200 MW nameplate capacity), and Buildings 7-10 roof vents are bright on infrared while Buildings 11-12 vents are not. That's 4/6 buildings operating, implying about 67% of capacity, which is consistent with 69% of the power plant operating. In the north, Buildings 16-27 (tents) look to be in a completed state. Each northern set of 6 tents still awaits to be connected to one of the corresponding power plants to become operational. Drone video from August 19th shows no turbines operating at Socrates North, though there are 3 small diesel generators operating. Building 13 (Vantage) is still under construction, we estimate another 3 months before operability.
    IT power running
    471 MW
    Whole facility
    612 MW

    Epoch AI projects 1,022 MW of IT power by July 1, 2028. A projection, not a fact yet.

Loading the newest clear pass

Seen from orbit · Compute Watch

The newest clear pass over the site

The image loads from NASA's public imagery: true color at 30 m per pixel, about 5 km across, north up.

Open Compute Watch

Heat Watch

Meta Prometheus: heat seen from space

Over the last three summers NASA's MODIS read the ground here +2.3 °C against the land 5 to 10 km around it by day.

Timeline

Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

  1. Mark Zuckerberg, reported by TechCrunch: 1 GW. Promised: online in 2026.Announcement · TechCrunch

  2. Meta: 1 GW cluster.Announcement · Engineering at Meta

  3. Meta Prometheus: 6 buildings operating, 368 MW of IT power.Evidence · Epoch AI, on the Power Map

  4. Meta Prometheus: 6 buildings operating, 368 MW of IT power.Evidence · Epoch AI, on the Power Map

  5. Meta Prometheus: 6 buildings operating, 368 MW of IT power.Evidence · Epoch AI, on the Power Map

  6. Meta Prometheus: 10 buildings operating, 471 MW of IT power.Evidence · Epoch AI, on the Power Map

Corrections

See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

File a correction

Sign in with your SI Passport to file a correction. It is a free message signature and never moves tokens.

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

  • Loading the corrections on file.

Sources

Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.