1. Home
  2. Gigawatt Ledger
  3. Denton

Gigawatt Ledger · Energized

Denton, announced against built

Denton is an SI compute project in Denton, Texas, by CoreWeave and Core Scientific. The announced figure is approximately 260 MW of critical IT load, from Core Scientific (Feb 26, 2025). Public evidence puts 262 MW in operation as of September 1, 2026, against 260 MW announced: 100%. The announcement states IT load, so it is set against the IT load running. Its state today: energized.

Announced
260 MW
Energized
262 MWSep 1, 2026
State
Energized
Source links
2

Announced

What was said, and when

Each row is one public announcement about Denton: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

  1. Company statement

    Core Scientific

    Core Scientific and CoreWeave Announce $1.2 Billion Expansion at Denton, TX Site

    Core Scientific adds 70 MW for CoreWeave at its Denton site.

    “increases the full critical IT load to approximately 260 MW”
    “The 70 MW of additional contracted power at the Denton site”
    Power or capacity stated
    Approximately 260 MW of critical IT load
    Promised
    None stated

Built

What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

Energized

Public evidence puts 262 MW in operation as of September 1, 2026, against 260 MW announced: 100%. The announcement states IT load, so it is set against the IT load running.

  1. Epoch AI estimate

    Epoch AI · Power Map

    CoreWeave Denton TX on the Power Map

    Epoch AI counts 7 buildings operating at CoreWeave Denton TX and estimates 262 MW of IT power (367 MW for the whole facility) as of September 1, 2026.

    Building 8 interior fit-out scheduled to begin. TDLR project TABS2026028247 schedules a $110M interior fit-out of the existing 27,678.22 sq ft Building A as a data hall beginning September 1, 2026.
    IT power running
    262 MW
    Whole facility
    367 MW

    Epoch AI projects 282 MW of IT power by May 31, 2027. A projection, not a fact yet.

Heat Watch

CoreWeave Denton TX: heat seen from space

Over the last three summers NASA's MODIS read the ground here -0.7 °C against the land 5 to 10 km around it by day, a change of +0.3 °C since before work on this build began.

Timeline

Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

  1. Core Scientific: Approximately 260 MW of critical IT load.Announcement · Core Scientific

  2. CoreWeave Denton TX: 4 buildings operating, 131 MW of IT power.Evidence · Epoch AI, on the Power Map

  3. CoreWeave Denton TX: 4 buildings operating, 131 MW of IT power.Evidence · Epoch AI, on the Power Map

  4. CoreWeave Denton TX: 7 buildings operating, 262 MW of IT power.Evidence · Epoch AI, on the Power Map

  5. CoreWeave Denton TX: 7 buildings operating, 262 MW of IT power.Evidence · Epoch AI, on the Power Map

Corrections

See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

File a correction

Sign in with your SI Passport to file a correction. It is a free message signature and never moves tokens.

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

  • Loading the corrections on file.

Sources

Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.