Gigawatt Ledger · Under construction

Stargate Doña Ana County, announced against built

Stargate Doña Ana County (Project Jupiter) is an SI compute project in Doña Ana County, New Mexico, by OpenAI, Oracle, BorderPlex Digital Assets and STACK Infrastructure. No source states a power figure for this project alone, so it is not in the Ledger's total. Epoch AI tracks the site as under construction, with no building operating as of June 22, 2026. Its state today: under construction.

Announced
Not stated
Energized
NoneJun 22, 2026
State
Under construction
Source links
3

Announced

What was said, and when

Each row is one public announcement about Stargate Doña Ana County: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

  1. Company statement

    OpenAI, Oracle and SoftBank

    OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites

    OpenAI names Doña Ana County, New Mexico as one of three new sites built with Oracle. No figure is given for this site alone.

    “can deliver over 5.5 gigawatts of capacity”
    Power or capacity stated
    Over 5.5 GW for three Oracle sites and an Abilene expansion together
    Promised
    None stated
  2. Company statement

    Oracle

    Oracle, BorderPlex, and Bloom Energy to Power Project Jupiter with Cleaner, Water-Efficient Fuel Cell Technology

    Oracle says the campus will be powered by Bloom fuel cells. The figure is the on-site power supply, stated as an upper limit.

    “up to 2.45 GW of installed Bloom fuel cell capacity”
    “Construction continues to move forward on schedule.”
    Power or capacity stated
    Up to 2.45 GW of installed fuel cell capacity (on-site power supply)
    Promised
    None stated
Not counted

The larger figure, up to 2.45 GW of installed fuel cell capacity (Oracle, Apr 27, 2026), is stated as an upper limit or an ambition. It is listed here and left out of the Ledger's total.

Built

What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

Under construction

Epoch AI tracks the site as under construction, with no building operating as of June 22, 2026.

  1. Epoch AI estimate

    Epoch AI · Power Map

    OpenAI Stargate New Mexico on the Power Map

    Epoch AI tracks OpenAI Stargate New Mexico as under construction: no building is operating as of June 22, 2026.

    Construction has advanced significantly since February 2026. We observe extensive earthworks and multiple graded building pads across the campus, with structural work underway on the main data center buildings. A large solar array and water storage basins are visible on site, and two cleared areas on the western side of the campus, likely for on-site power generation. No buildings appear operational yet (no completed roofs or signs of active cooling), consistent with the projected 2028 completion.
    IT power running
    None
    Whole facility
    None

    Epoch AI projects 1,750 MW of IT power by December 31, 2028. A projection, not a fact yet.

Heat Watch

OpenAI Stargate New Mexico: heat seen from space

Over the last three summers NASA's MODIS read the ground here -0.7 °C against the land 5 to 10 km around it by day.

Timeline

Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

  1. OpenAI, Oracle and SoftBank: Over 5.5 GW for three Oracle sites and an Abilene expansion together.Announcement · OpenAI

  2. OpenAI Stargate New Mexico: 0 buildings operating, no IT power yet.Evidence · Epoch AI, on the Power Map

  3. OpenAI Stargate New Mexico: 0 buildings operating, no IT power yet.Evidence · Epoch AI, on the Power Map

  4. Oracle: Up to 2.45 GW of installed fuel cell capacity (on-site power supply).Announcement · Oracle

  5. OpenAI Stargate New Mexico: 0 buildings operating, no IT power yet.Evidence · Epoch AI, on the Power Map

Corrections

See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

File a correction

Sign in with your SI Passport to file a correction. It is a free message signature and never moves tokens.

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

  • Loading the corrections on file.

Sources

Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.