Stargate Doña Ana County, announced against built
Stargate Doña Ana County (Project Jupiter) is an SI compute project in Doña Ana County, New Mexico, by OpenAI, Oracle, BorderPlex Digital Assets and STACK Infrastructure. No source states a power figure for this project alone, so it is not in the Ledger's total. Epoch AI tracks the site as under construction, with no building operating as of June 22, 2026. Its state today: under construction.
- Announced
- Not stated
- Energized
- NoneJun 22, 2026
- State
- Under construction
- Source links
- 3
Announced
What was said, and when
Each row is one public announcement about Stargate Doña Ana County: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.
- Company statement
OpenAI, Oracle and SoftBank
OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites
OpenAI names Doña Ana County, New Mexico as one of three new sites built with Oracle. No figure is given for this site alone.
“can deliver over 5.5 gigawatts of capacity”
- Power or capacity stated
- Over 5.5 GW for three Oracle sites and an Abilene expansion together
- Promised
- None stated
- Company statement
Oracle
Oracle, BorderPlex, and Bloom Energy to Power Project Jupiter with Cleaner, Water-Efficient Fuel Cell Technology
Oracle says the campus will be powered by Bloom fuel cells. The figure is the on-site power supply, stated as an upper limit.
“up to 2.45 GW of installed Bloom fuel cell capacity”
“Construction continues to move forward on schedule.”
- Power or capacity stated
- Up to 2.45 GW of installed fuel cell capacity (on-site power supply)
- Promised
- None stated
The larger figure, up to 2.45 GW of installed fuel cell capacity (Oracle, Apr 27, 2026), is stated as an upper limit or an ambition. It is listed here and left out of the Ledger's total.
Built
What public evidence confirms
What is on the ground today, from the Power Map data and from any statement or filing that states live power.
Epoch AI tracks the site as under construction, with no building operating as of June 22, 2026.
- Epoch AI estimate
Epoch AI · Power Map
OpenAI Stargate New Mexico on the Power Map
Epoch AI tracks OpenAI Stargate New Mexico as under construction: no building is operating as of June 22, 2026.
Construction has advanced significantly since February 2026. We observe extensive earthworks and multiple graded building pads across the campus, with structural work underway on the main data center buildings. A large solar array and water storage basins are visible on site, and two cleared areas on the western side of the campus, likely for on-site power generation. No buildings appear operational yet (no completed roofs or signs of active cooling), consistent with the projected 2028 completion.
- IT power running
- None
- Whole facility
- None
Epoch AI projects 1,750 MW of IT power by December 31, 2028. A projection, not a fact yet.
Heat Watch
OpenAI Stargate New Mexico: heat seen from space
Over the last three summers NASA's MODIS read the ground here -0.7 °C against the land 5 to 10 km around it by day.
Timeline
Announcements and evidence, by date
What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.
OpenAI, Oracle and SoftBank: Over 5.5 GW for three Oracle sites and an Abilene expansion together.Announcement · OpenAI
OpenAI Stargate New Mexico: 0 buildings operating, no IT power yet.Evidence · Epoch AI, on the Power Map
OpenAI Stargate New Mexico: 0 buildings operating, no IT power yet.Evidence · Epoch AI, on the Power Map
Oracle: Up to 2.45 GW of installed fuel cell capacity (on-site power supply).Announcement · Oracle
OpenAI Stargate New Mexico: 0 buildings operating, no IT power yet.Evidence · Epoch AI, on the Power Map
Corrections
See something wrong? File a correction
Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.
File a correction
Sign in with your SI Passport to file a correction. It is a free message signature and never moves tokens.
A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.
Corrections on file · 0
- Loading the corrections on file.
Sources
Every link behind this page
Read on November 11, 2026. An undated page carries the date it was read.
- OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites, OpenAI, Sep 23, 2025
- Oracle, BorderPlex, and Bloom Energy to Power Project Jupiter with Cleaner, Water-Efficient Fuel Cell Technology, Oracle, Apr 27, 2026
- OpenAI Stargate New Mexico on the Power Map, from Epoch AI, "AI data centers" (CC BY 4.0), retrieved November 10, 2026
More projects
Keep reading the Ledger
Three more projects, the same operator first.
The whole Ledger- Under construction
Stargate Shackelford County (Frontier)
Shackelford County, Texas
1.4 GW announced · nothing confirmed
Open the project - Under construction
Stargate Michigan (Saline Township)
Saline Township, Michigan
1.38 GW announced · nothing confirmed
Open the project - Energized
Stargate Abilene
Abilene, Texas
1.2 GW announced · 1.15 GW