Gigawatt Ledger · Under construction

Stargate Milam County, announced against built

Stargate Milam County is an SI compute project in Milam County, Texas, by OpenAI, SoftBank and SB Energy. The announced figure is 1.2 GW data center site, from SB Energy (Mar 19, 2026). Epoch AI tracks the site as under construction, with no building operating as of March 23, 2026. Its state today: under construction.

Announced
1.2 GW
Energized
NoneMar 23, 2026
State
Under construction
Source links
3

Announced

What was said, and when

Each row is one public announcement about Stargate Milam County: who said it, the power or capacity it states in its own unit, the promised date, and the link. Company claims are quoted as claims.

  1. Company statement

    OpenAI, Oracle and SoftBank

    OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites

    OpenAI names Milam County, Texas as a site built with SB Energy, a SoftBank Group company.

    “can scale to 1.5 gigawatts over the next 18 months”
    Power or capacity stated
    1.5 GW for Lordstown and Milam County together, as a "can scale to" figure
    Promised
    Over the next 18 months
  2. Company statement

    SB Energy

    OpenAI and SoftBank Group Partner with SB Energy

    SB Energy says OpenAI signed a 1.2 GW data center lease and chose SB Energy to build and operate the Milam County site.

    “OpenAI signs 1.2 GW data center lease for initial data center buildout”
    “1.2 GW data center site in Milam County”
    Power or capacity stated
    1.2 GW data center lease
    Promised
    None stated

Built

What public evidence confirms

What is on the ground today, from the Power Map data and from any statement or filing that states live power.

Under construction

Epoch AI tracks the site as under construction, with no building operating as of March 23, 2026.

  1. Epoch AI estimate

    Epoch AI · Power Map

    OpenAI Stargate Milam on the Power Map

    Epoch AI tracks OpenAI Stargate Milam as under construction: no building is operating as of March 23, 2026.

    Steel framing and roofing is underway for Building 1.
    IT power running
    None
    Whole facility
    None

    Epoch AI projects 857 MW of IT power by December 31, 2028. A projection, not a fact yet.

Heat Watch

OpenAI Stargate Milam: heat seen from space

Over the last three summers NASA's MODIS read the ground here -0.1 °C against the land 5 to 10 km around it by day.

Timeline

Announcements and evidence, by date

What was promised and what was seen, in the order it became public. The full dated record of each site is on its Power Map page.

  1. OpenAI, Oracle and SoftBank: 1.5 GW for Lordstown and Milam County together, as a "can scale to" figure. Promised: over the next 18 months.Announcement · OpenAI

  2. OpenAI Stargate Milam: 0 buildings operating, no IT power yet.Evidence · Epoch AI, on the Power Map

  3. OpenAI Stargate Milam: 0 buildings operating, no IT power yet.Evidence · Epoch AI, on the Power Map

  4. SB Energy: 1.2 GW data center lease.Announcement · SB Energy

  5. OpenAI Stargate Milam: 0 buildings operating, no IT power yet.Evidence · Epoch AI, on the Power Map

Corrections

See something wrong? File a correction

Sign in with your SI Passport and say what is wrong, with a link to a public source. The team reads the source before anything changes, and approved corrections stay on this page.

File a correction

Sign in with your SI Passport to file a correction. It is a free message signature and never moves tokens.

A correction needs a link. Nothing shows until the team approves it. If your Passport carries an Org check it shows here, and an organization correcting its own project is labeled as such.

Corrections on file · 0

  • Loading the corrections on file.

Sources

Every link behind this page

Read on November 11, 2026. An undated page carries the date it was read.