CoreWeave Chester VA is an SI data center in Chester, Virginia, United States, owned by CoreWeave and used by OpenAI (Epoch AI rates this speculative). Epoch AI estimates its IT power at 82 MW as of May 20, 2026, with 2 buildings operating, and projects 113 MW by June 30, 2027. Its public timeline starts on September 18, 2023.

IT power
82 MWMay 20, 2026
Facility power
114 MW
Status
Operating, expanding
Buildings operating
2

Where it is

The site and its facts

CoreWeave Chester VA on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Chester, Virginia, United StatesOpen in OpenStreetMap
Place
Chester, Virginia, United States
Address
1401 Meadowville Technology Parkway, Chester, VA
Coordinates
37.3591° N, 77.3295° W
Owner
CoreWeave
Users
OpenAI (Epoch AI rates this speculative)
Chips
H100, B200
Compute
About 88,428 H100 equivalentsEpoch AI estimate, May 20, 2026
Projected
113 MW IT power by June 30, 2027Epoch AI projection, not a fact yet

Heat Watch

CoreWeave Chester VA: heat seen from space

Over the last three summers NASA's MODIS read the ground here +0.7 °C against the land 5 to 10 km around it by day, a change of +0.2 °C since before work on this build began.

Lights On

CoreWeave Chester VA: light at night

NASA's night imagery read 46.6 of 100 over this site in October 2026, against 31.7 in October 2018, the first month read. Against a year before: +2.9 points. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on CoreWeave Chester VA, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Conversion starts at CTP-01 (Building 1). The data center was formerly owned by Capital One, now leased to CoreWeave. Source: https://www.datacenterdynamics.com/en/news/chirisa-secures-200-million-loan-to-fit-out-virginia-data-center-for-coreweave/

    No IT power yet0 operating

  2. Building 1's second data hall scheduled to come online this month.

    18 MW1 operating

  3. Building 1 is scheduled to be fully online by this point, so we count the full 27 MW as operational here.

    27 MW1 operating

  4. Satellite imagery shows Building 1 complete, with Building 2's yard work and early construction visible. Building 3 hasn't started yet, since the old building is still there.

    27 MW1 operating

  5. Based on satellite imagery, Building 3 has cleared its land and is beginning construction. Building 2 is operational judging from the colored motion artifacts on the cooling tower fans.

    82 MW2 operating

  6. Buildings 3 is estimated complete by the end of Q1 2027, based on the current PowerHouse schedule. Added another three months to account for commissioning and server installation.

    113 MW3 operating

Adopt a site

Watch CoreWeave Chester VA

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Sources

Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

Questions

CoreWeave Chester VA, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is CoreWeave Chester VA?

CoreWeave Chester VA is in Chester, Virginia, United States, at 1401 Meadowville Technology Parkway, Chester, VA. Epoch AI publishes its coordinates as 37.3591, -77.3295.

Who owns CoreWeave Chester VA?

Epoch AI lists CoreWeave as its owner and OpenAI (Epoch AI rates this speculative) as its user.

How much power does CoreWeave Chester VA use?

Epoch AI estimates its IT power at 82 MW as of May 20, 2026, and its total facility power at 114 MW. It projects 113 MW of IT power by June 30, 2027.

Is CoreWeave Chester VA operating?

Yes, and it is growing. Epoch AI counts 2 buildings operating as of May 20, 2026, with more capacity on its timeline.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).