Power Map · Operating, expanding
QTS Richmond 3, Sandston
QTS Richmond 3 is an SI data center in Sandston, Virginia, United States. Epoch AI estimates its IT power at 144 MW as of May 14, 2026, with 3 buildings operating, and projects 240 MW by February 13, 2027. Its public timeline starts on April 1, 2024.
- IT power
- 144 MWMay 14, 2026
- Facility power
- 202 MW
- Status
- Operating, expanding
- Buildings operating
- 3
Where it is
The site and its facts
QTS Richmond 3 on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Sandston, Virginia, United States
- Address
- 3525 to 3543 Portugee Rd, Sandston, VA 23150
- Coordinates
- 37.4792° N, 77.2510° W
- Owner
- Not public
- Compute
- About 174,836 H100 equivalentsEpoch AI estimate, May 14, 2026
- Energy
- Dominion Energy
- Projected
- 240 MW IT power by February 13, 2027Epoch AI projection, not a fact yet
Heat Watch
QTS Richmond 3: heat seen from space
Over the last three summers NASA's MODIS read the ground here -0.4 °C against the land 5 to 10 km around it by day.
Lights On
QTS Richmond 3: light at night
NASA's night imagery read 56.2 of 100 over this site in October 2026, against 18.2 in October 2018, the first month read. Against a year before: +9.1 points. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on QTS Richmond 3, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
Land clearing begins.
No IT power yet0 operating
Building 1 shell is mostly complete, with some chillers installed on the roof. Building 2 shell is under construction.
No IT power yet0 operating
The substation is still under construction, based on a Google Earth image, so we don't think any buildings are operational yet.
No IT power yet0 operating
The substation looks complete, but we expect Building 1 still needs commissioning before it is fully operational.
No IT power yet0 operating
Building 1 is operational, based on the substation being completed earlier and cars in the carpark. Building 2 and 3 are not operational, based on minor construction work at the perimeter and no cars in the carpark, but we expect they will be operational within 3 months. Building 4 has complete chillers and backup generators, while Building 5 has chillers but only a few backup generators - roughly the state of Building 1 on 2025-02-04.
48 MW1 operating
Building 2 and 3 are operational, based on the previous entry.
144 MW3 operating
Building 4 and 5 are operational, based on Building 5 being roughly 1 year behind Building 1 in satellite imagery.
240 MW5 operating
Adopt a site
Watch QTS Richmond 3
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- Richmond 3 factsheet
- Environmental permit detailing power generation
- Epoch AI, "AI data centers", the record for QTS Richmond 3 (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
1 km away
QTS Richmond 1
Sandston, Virginia, United States
238 MW IT power
1 km away
QTS Richmond 2
Sandston, Virginia, United States
180 MW IT power
15 km away
CoreWeave Chester VA
Chester, Virginia, United States
82 MW IT power
143 km away
STACK Infrastructure NVA02
Manassas, Virginia, United States
85 MW IT power
Questions
QTS Richmond 3, answered
Where it is, who owns it and how much power it uses, from the public record.
Where is QTS Richmond 3?
QTS Richmond 3 is in Sandston, Virginia, United States, at 3525 to 3543 Portugee Rd, Sandston, VA 23150. Epoch AI publishes its coordinates as 37.4792, -77.2510.
Who owns QTS Richmond 3?
Epoch AI does not name an owner yet.
How much power does QTS Richmond 3 use?
Epoch AI estimates its IT power at 144 MW as of May 14, 2026, and its total facility power at 202 MW. It projects 240 MW of IT power by February 13, 2027.
Is QTS Richmond 3 operating?
Yes, and it is growing. Epoch AI counts 3 buildings operating as of May 14, 2026, with more capacity on its timeline.
Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).