Power Map · Operating
Google Pryor (North), Pryor
Google Pryor (North) is an SI data center in Pryor, Oklahoma, United States, owned by Google and used by Google DeepMind (Epoch AI rates this speculative). Epoch AI estimates its IT power at 368 MW as of September 6, 2026, with 2 buildings operating. Its public timeline starts on July 19, 2024.
- IT power
- 368 MWSep 6, 2026
- Facility power
- 442 MW
- Status
- Operating
- Buildings operating
- 2
Where it is
The site and its facts
Google Pryor (North) on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.
- Place
- Pryor, Oklahoma, United States
- Address
- 4581 Webb St, Pryor, OK 74361
- Coordinates
- 36.2454° N, 95.3235° W
- Owner
- Users
- Google DeepMind (Epoch AI rates this speculative)
- Chips
- TPU v5p, TPU v5e
- Compute
- About 636,685 H100 equivalentsEpoch AI estimate, Sep 6, 2026
Heat Watch
Google Pryor (North): heat seen from space
Over the last three summers NASA's MODIS read the ground here +1.9 °C against the land 5 to 10 km around it by day, a change of -0.6 °C since before work on this build began.
Lights On
Google Pryor (North): light at night
NASA's night imagery read 46.4 of 100 over this site in October 2026, against 27.6 in October 2018, the first month read. Against a year before: -1.2 points. Light is not proof of what runs inside.
Timeline
Dated, from the public record
Epoch AI's dated notes on Google Pryor (North), quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.
Building 1 is operational, based on default roof-to-operational time.
53 MW1 operating
Building 2 is being retrofitted from a warehouse. The roof is being painted white, and cooling towers and a new substation are being built just south of the building (based on later imagery).
53 MW1 operating
The new substation for Building 2 looks mostly complete, half of the cooling towers are installed. The black patch in the top left of the building suggests that the new roof is not quite complete.
53 MW1 operating
Building 2 looks almost complete, but still appears to have three cooling towers missing. We therefore expect another 3 months until full operation.
53 MW1 operating
Building 2 is operational, confirmed via RAAD drone imagery of spinning cooling tower fans on September 8th.
368 MW2 operating
Adopt a site
Watch Google Pryor (North)
One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.
The watcher
Loading the watcher.
Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.
Approved updates · 0
- Approved updates show here with their date.
Sources
Where the facts come from
The sources Epoch AI lists for this site, and the record itself.
- Google announces expansion of Pryor facility
- Google 2025 Environmental Report
- News of a 9 exaflop TPUv4 cluster in the Pryor data center, launched in 2022
- Epoch AI, "AI data centers", the record for Google Pryor (North) (CC BY 4.0), retrieved November 10, 2026
Nearby
The nearest SI data centers
The four closest sites on the Power Map, as the crow flies.
62 km away
CoreWeave Muskogee OK
Muskogee, Oklahoma, United States
IT power not stated
335 km away
Google Kansas City East
Kansas City, Missouri, United States
105 MW IT power
378 km away
CoreWeave Denton TX
Denton, Texas, United States
262 MW IT power
434 km away
Google Red Oak
Red Oak, Texas, United States
77 MW IT power
Questions
Google Pryor (North), answered
Where it is, who owns it and how much power it uses, from the public record.
Where is Google Pryor (North)?
Google Pryor (North) is in Pryor, Oklahoma, United States, at 4581 Webb St, Pryor, OK 74361. Epoch AI publishes its coordinates as 36.2454, -95.3235.
Who owns Google Pryor (North)?
Epoch AI lists Google as its owner and Google DeepMind (Epoch AI rates this speculative) as its user.
How much power does Google Pryor (North) use?
Epoch AI estimates its IT power at 368 MW as of September 6, 2026, and its total facility power at 442 MW.
Is Google Pryor (North) operating?
Yes. Epoch AI counts 2 buildings operating as of September 6, 2026.
Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).