1. Home
  2. Power Map
  3. Google Pryor (North)

Power Map · Operating

Google Pryor (North), Pryor

Google Pryor (North) is an SI data center in Pryor, Oklahoma, United States, owned by Google and used by Google DeepMind (Epoch AI rates this speculative). Epoch AI estimates its IT power at 368 MW as of September 6, 2026, with 2 buildings operating. Its public timeline starts on July 19, 2024.

IT power
368 MWSep 6, 2026
Facility power
442 MW
Status
Operating
Buildings operating
2

Where it is

The site and its facts

Google Pryor (North) on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Pryor, Oklahoma, United StatesOpen in OpenStreetMap
Place
Pryor, Oklahoma, United States
Address
4581 Webb St, Pryor, OK 74361
Coordinates
36.2454° N, 95.3235° W
Owner
Google
Users
Google DeepMind (Epoch AI rates this speculative)
Chips
TPU v5p, TPU v5e
Compute
About 636,685 H100 equivalentsEpoch AI estimate, Sep 6, 2026

Heat Watch

Google Pryor (North): heat seen from space

Over the last three summers NASA's MODIS read the ground here +1.9 °C against the land 5 to 10 km around it by day, a change of -0.6 °C since before work on this build began.

Lights On

Google Pryor (North): light at night

NASA's night imagery read 46.4 of 100 over this site in October 2026, against 27.6 in October 2018, the first month read. Against a year before: -1.2 points. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on Google Pryor (North), quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. Building 1 is operational, based on default roof-to-operational time.

    53 MW1 operating

  2. Building 2 is being retrofitted from a warehouse. The roof is being painted white, and cooling towers and a new substation are being built just south of the building (based on later imagery).

    53 MW1 operating

  3. The new substation for Building 2 looks mostly complete, half of the cooling towers are installed. The black patch in the top left of the building suggests that the new roof is not quite complete.

    53 MW1 operating

  4. Building 2 looks almost complete, but still appears to have three cooling towers missing. We therefore expect another 3 months until full operation.

    53 MW1 operating

  5. Building 2 is operational, confirmed via RAAD drone imagery of spinning cooling tower fans on September 8th.

    368 MW2 operating

Adopt a site

Watch Google Pryor (North)

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Sources

Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

Questions

Google Pryor (North), answered

Where it is, who owns it and how much power it uses, from the public record.

Where is Google Pryor (North)?

Google Pryor (North) is in Pryor, Oklahoma, United States, at 4581 Webb St, Pryor, OK 74361. Epoch AI publishes its coordinates as 36.2454, -95.3235.

Who owns Google Pryor (North)?

Epoch AI lists Google as its owner and Google DeepMind (Epoch AI rates this speculative) as its user.

How much power does Google Pryor (North) use?

Epoch AI estimates its IT power at 368 MW as of September 6, 2026, and its total facility power at 442 MW.

Is Google Pryor (North) operating?

Yes. Epoch AI counts 2 buildings operating as of September 6, 2026.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).