Power Map · Operating, expanding

Google Red Oak, Red Oak

Google Red Oak is an SI data center in Red Oak, Texas, United States, owned by Google. Epoch AI estimates its IT power at 77 MW as of February 6, 2026, with 1 building operating, and projects 154 MW by December 1, 2026. Its public timeline starts on April 30, 2023.

IT power
77 MWFeb 6, 2026
Facility power
93 MW
Status
Operating, expanding
Buildings operating
1

Where it is

The site and its facts

Google Red Oak on the map, with every fact Epoch AI publishes for it. Orange dots are the nearest SI data centers.

Red Oak, Texas, United StatesOpen in OpenStreetMap
Place
Red Oak, Texas, United States
Address
330 Austin Blvd, Red Oak, TX 75154
Coordinates
32.5377° N, 96.7935° W
Owner
Google
Chips
TPU v6e
Compute
About 108,135 H100 equivalentsEpoch AI estimate, Feb 6, 2026
Projected
154 MW IT power by December 1, 2026Epoch AI projection, not a fact yet

Heat Watch

Google Red Oak: heat seen from space

Over the last three summers NASA's MODIS read the ground here +0.8 °C against the land 5 to 10 km around it by day.

Lights On

Google Red Oak: light at night

NASA's night imagery read 58.8 of 100 over this site in October 2026, against 21.3 in October 2018, the first month read. Against a year before: +3.2 points. Light is not proof of what runs inside.

Timeline

Dated, from the public record

Epoch AI's dated notes on Google Red Oak, quoted as Epoch AI wrote them, with its IT power estimate on each date. Projections are marked.

  1. First signs of development/land clearing

    No IT power yet0 operating

  2. Building 1 is operational, based on a Google Earth image showing a completed building shell and equipment, and the large construction car park being emptied. Building 2 shell looks mostly completed.

    77 MW1 operating

  3. Building 1 appears active - the surrounding land is finished including the site entrance and the parking lot. The dry coolers for Building 2 are nearly complete although the building is still clearly a construction zone. The Building 2 substation also appears complete.

    77 MW1 operating

  4. Building 2 is estimated to be operational.

    154 MW2 operating

Adopt a site

Watch Google Red Oak

One SI Passport holder can be this site's named watcher and file dated updates. Nothing a watcher files shows until the team approves it.

The watcher

Loading the watcher.

Signing in is a free message signature. It never moves tokens. Photos are made fresh on the server without their metadata, and show only once the team approves them.

Approved updates · 0

  • Approved updates show here with their date.

Sources

Where the facts come from

The sources Epoch AI lists for this site, and the record itself.

Questions

Google Red Oak, answered

Where it is, who owns it and how much power it uses, from the public record.

Where is Google Red Oak?

Google Red Oak is in Red Oak, Texas, United States, at 330 Austin Blvd, Red Oak, TX 75154. Epoch AI publishes its coordinates as 32.5377, -96.7935.

Who owns Google Red Oak?

Epoch AI lists Google as its owner.

How much power does Google Red Oak use?

Epoch AI estimates its IT power at 77 MW as of February 6, 2026, and its total facility power at 93 MW. It projects 154 MW of IT power by December 1, 2026.

Is Google Red Oak operating?

Yes, and it is growing. Epoch AI counts 1 building operating as of February 6, 2026, with more capacity on its timeline.

Data center facts: Epoch AI, "AI data centers", CC BY 4.0, retrieved November 10, 2026. Map: Natural Earth (public domain).